针对FLNG/FLPG 装置区别于常规FPSO 以及陆上LNG 工厂的关键和难点技术,以南海某深水气田为研究目标,开展了FLNG/FLPG 装置液化工艺方案优化分析,提出了具有自主知识产权的CO2 预冷双氮膨胀的海上FLNG 液化工艺。对影响该工艺流程性能的关键参数进行了优化,分析了该工艺对于海上FLNG 装置的适应性。结果表明:二级制冷工艺用于海上FLNG 装置的天然气预冷过程,当二氧化碳一级制冷温度在-20 ℃左右,二级制冷温度在-50 ℃左右,氮气循环压缩机出口压力取8 MPa,两级氮膨胀制冷分界温度取-98 ℃,海水换热温差在8 ℃左右,单列总功耗
为6.258×104 kW,液化率为93.7%,比功耗为0.327 1 kW·h/m3。该工艺安全性高、流程简单、设备紧凑、经济性较好,具有较好的海上适应性。(图6,表4,参8)。
In view of the key and difficult technology of FLNG/FLPG device which are different from conventional
FPSO and onshore LNG plant, taking the deep water gasfield in South China sea as a research object, optimization analysis of liquefaction process scheme has been carried out for the device, offshore FLNG liquefaction process of CO2-precooled dinitrogen expansion has been proposed with independent intellectual property. The key parameters affecting the performance of the process have been optimized, and the adaptability of the process to offshore FLNG device has been analyzed. The results show that when the two-stage refrigeration technology is used in the gas cooling process of the offshore FLNG device, the temperature in the first stage of CO2 refrigeration is about -20 ℃, and -50 ℃ in the second stage, the outlet pressure of the nitrogen recycle compressor is set at 8 MPa, the division temperature of the two-stage nitrogen expansion refrigeration is set at -98 ℃, and the heat transfer temperature difference is about 8 ℃, then the total power consumption is 6.258×104 kW, liquidation rate is 93.7%, and the specific power consumption is 0.327 1 kW·h/m3.This process is safe, simple, with compact equipment, economical and well adaptive to offshore working conditions. (6Figures, 4 Tables, 8 References)
[1]WIJINGAARDEN W V,MEEK H J. The generic LNG FPSO-A quick & cost-effective way to monetize stranded gas fields[M]. Perth:Society of Petroleum Engineers
[2]朱刚,顾安忠. 新型液化天然气浮式生产储卸装置[J]. 中国海上油气(工程),2000,12(6):1-4.
ZHU G,GU A Z. New LNG FPSO for marginal gas fields developmenmt[J]. China Offshore Oil and Gas (Engineering) ,2000,12(6):1-4.
[3]IVERSEN I,HELLEKLEIV V. LNG-FPSO-Solving the supply shortfall[C]. The 2009 Offshore Technology Conference,Houston,USA,May 4-7,2009:OTC 20102.
[4]GANIELSEN H K,ANDREASSEN G,VERITAS D N,et al. The commercial advantages and limitations-Onshore versus Offshore LNG import facilities[C]. The 2009 Offshore Technology Conference,Houston,USA,May 4-7,2009:OTC19551.
[5]PASTOOR W,LUND K,TVEITNES T,et al. The LNGMproducer-A generic design with great adaptability[C]. The 2009 Offshore Technology Conference,Houston,USA,May 4-7,2009:OTC 19845.
[6]王保庆. 天然气液化工艺技术比较分析[J]. 天然气工业, 2009,29 (1) : 111-113.
WANG B Q. LNG processing technologies and comparison analysis[J]. Nature Gas Industry, 2009, 29 (1):111-113.
[7]朱建鲁,李玉星,王武昌,等. 海上天然气液化工艺流程优选[J]. 天然气工业, 2012,32 (3) : 98-104.
ZHU J L,LI Y X,WANG W C,et al. Optimal selection of natural gas liquefaction process for an LNG FPSO unit[J]. Nature Gas Industry, 2012, 32 (3):98-104.
[8]朱建鲁,李玉星,王武昌,等. CO2 预冷双氮膨胀天然气液化工艺的海上适应性分析[J]. 天然气工业, 2012, 32 (4) : 89-95.
ZHU J L,LI Y X,WANG W C,et al. Offshore adaptability of the dual nitrogen expander process with CO2 precooling[J]. Nature Gas Industry, 2012, 32 (4):89-95.
基金项目:国家973 课题“天然气水合物开采中的多相流动机理和相关基础理论研究”,2009CB219507;国家重大专项“大型FLNG/FLPG、FDPSO 关键技术”,2011ZX05026-006。
喻西崇,高级工程师,1973年生,2002 年博士毕业于西南石油大学石油工程专业,现主要从事深水流动安全保障、天然气水合物开采和储运以及CO2 储存、运输等方面的研究工作。(收稿日期:2013-05-19;修回日期:2013-10-15;编辑:关中原)
YU Xichong, Ph.D, senior engineer, born in 1973, graduated from Southwest Petroleum University, petroleum engineering, in 2002, engaged in the research of deepwater flow security, exploitation, storage and transportation of natural gas hydrate, and storage and transportation of CO2.
Tel: 13401183966; Email: yuxch@cnooc.com.cn