版权所有@2014 《油气储运》杂志社 冀ICP备号:0000000
地址:河北省廊坊市金光道51号(065000);电话:0316-2177193 / 0316-2176753; 传真:0316-2177392; 网址:yqcy.paperonce.org
技术支持:西安三才科技实业有限公司 029-89381847;029-88222991
西气东输二线站场收发球筒位移原因及解决方案
2nd West-to-East Gas Pipeline
; pig launcher and receiver; displacement; stress analysis; risk control
[1]殷炳纲.优化成品油管道设计减少混油量[J].油气储运,2011,30(11):834.[doi:10.6047/j.issn.1000-8241.2011.11.010]
Yin Binggang.Optimizing the design of products pipeline to reduce the contaminated volume[J].Oil & Gas Storage and Transportation,2011,30(预出版):834.[doi:10.6047/j.issn.1000-8241.2011.11.010]
[2]樊绪平,雷雨,王银娜,等.利用SCADA 系统防止西气东输管道冰堵的预警逻辑[J].油气储运,2014,33(10):1091.[doi:10.6047/j.issn.1000-8241.2014.10.014]
FAN Xuping,LEI Yu,WANG Yinna,et al.Warning logic of ice blockage with SCADA for West-to-East Gas Pipeline[J].Oil & Gas Storage and Transportation,2014,33(预出版):1091.[doi:10.6047/j.issn.1000-8241.2014.10.014]
[3]倪姗姗,黄冬,胡开胜,等.西气东输二线站场收发球筒位移原因及解决方案[J].油气储运,2015,34(11):1250.[doi:10.6047/j.issn.1000-8241.2015.11.023]
NI Shanshan,HUANG Dong,HU Kaisheng,et al.Causes and solution for displacements of pig launchers and receivers in stations along 2nd West-to-East Gas Pipeline[J].Oil & Gas Storage and Transportation,2015,34(预出版):1250.[doi:10.6047/j.issn.1000-8241.2015.11.023]