[1]苗青.二氧化碳管道全尺寸爆破试验[J].油气储运,2024,43(05):492-499.[doi:10.6047/j.issn.1000-8241.2024.05.002]
 MIAO Qing.Full-scale burst test of CO2 pipeline[J].Oil & Gas Storage and Transportation,2024,43(05):492-499.[doi:10.6047/j.issn.1000-8241.2024.05.002]
点击复制

二氧化碳管道全尺寸爆破试验

参考文献/References:

[1] 王震,和旭,崔忻. “碳中和”愿景下油气企业的战略选择[J].油气储运,2021,40(6):601-608. 10.6047/j.issn.1000-8241. 2021.06.001. WANG Z,HE X,CUI X. Strategic choice for oil and gas companies under the vision of carbon neutrality[J]. Oil & Gas Storage and Transportation,2021,40(6): 601-608.
[2] 周显峰,杜丽婧,万伟伟.碳捕集、利用与封存(CCUS)浅析[J].国际工程与劳务,2023(7):67-70. ZHOU X F,DU L J,WAN W W. Analysis of carbon capture,utilization,and storage (CCUS)[J]. International Project Contracting & Labour Service,2023(7): 67-70.
[3] 刘江枫,张奇,吕伟峰,李根生,滕飞,高志辉.碳捕集利用与封存一体化技术研究进展与产业发展策略[J].北京理工大学学报(社会科学版),2023,25(5):40-53. 10.15918/j.jbitss1009-3370.2023.1840. LIU J F,ZHANG Q,LYU W F,LI G S,TENG F,GAO Z H. Research progress and industry development strategy of integrated carbon capture,utilization and storage technology[J]. Journal of Beijing Institute of Technology (Social Sciences Edition),2023,25(5): 40-53.
[4] 张引弟,胡多多,刘畅,刘捷,田磊,伍丽娟,等.石油石化行业CO2捕集、利用和封存技术的研究进展[J].油气储运,2017,36(6):636-645. 10.6047/j.issn.1000-8241.2017.06. 005. ZHANG Y D,HU D D,LIU C,LIU J,TIAN L,WU L J,et al. Research progress of CO2 capture,utilization and storage (CCUS) technologies in petroleum and petrochemical industry[J]. Oil &Gas Storage and Transportation,2017,36(6): 636-645.
[5] 郑建坡,史建公,刘志坚,蒋绍洋,刘春生.二氧化碳管道输送技术研究进展[J].中外能源,2018,23(6):87-94. ZHENG J P,SHI J G,LIU Z J,JIANG S Y,LIU C S. Recent advances in pipeline transportation technology of carbon dioxide[J]. Sino-Global Energy,2018,23(6): 87-94.
[6] 陈兵,肖红亮,李景明,王香增.二氧化碳捕集、利用与封存研究进展[J].应用化工,2018,47(3):589-592. 10.3969/j.issn.1671-3206.2018.03.040. CHEN B,XIAO H L,LI J M,WANG X Z. Advances in research on carbon capture,utilization and storage[J]. Applied Chemical Industry,2018,47(3): 589-592.
[7] 李永强.超临界CO2长距离管道输送技术研究[D].北京:华北电力大学,2017. LI Y Q. Investigation on the long distance pipeline transportation technology of supercritical CO2[D]. Beijing: North China Electric Power University,2017.
[8] 蒋秀,屈定荣,刘小辉.超临界CO2管道输送与安全[J].油气储运,2013,32(8):809-813. 10.6047/j.issn.1000-8241. 2013.08.003. JIANG X,QU D R,LIU X H. Supercritical CO2 pipeline transportation and safety[J]. Oil & Gas Storage and Transportation,2013,32(8): 809-813.
[9] KNOOPE M M J,RAM?REZ A,FAAIJ A P C. Investing in CO2 transport infrastructure under uncertainty: a comparison between ships and pipelines[J]. International Journal of Greenhouse Gas Control,2015,41: 174-193. DOI: 10.1016/j.ijggc. 2015.07.013.
[10] AURSAND E,DUMOULIN S,HAMMER M,LANGE H I,MORIN A,MUNKEJORD S T,et al. Fracture propagation control in CO2 pipelines: Validation of a coupled fluid-structure model[J]. Engineering Structures,2016,123: 192-212. DOI:10.1016/j.engstruct.2016.05.012.
[11] COSHAM A,JONES D G,ARMSTRONG K,ALLASON D,BARNETT J. Analysis of two dense phase carbon dioxide full-scale fracture propagation tests[C]. Calgary: 2014 10th International Pipeline Conference,2014: V003T07A003.
[12] COSHAM A,JONES D G,ARMSTRONG K,ALLASON D,BARNETT J. Analysis of a dense phase carbon dioxide full-scale fracture propagation test in 24 inch diameter pipe[C]. Calgary: 2016 11th International Pipeline Conference,2016:V003T05A012.
[13] DI BIAGIO M,LUCCI A,MECOZZI E,SPINELLI C M. Fracture propagation prevention on CO2 pipelines: full scale experimental testing and verification approach[C]. Berlin:Pipeline Technology Conference 2017,2017: 1-17.
[14] LINTON V,LEINUM B H,NEWTON R,FYRILEIV O. CO2SAFE-ARREST: a full-scale burst test research program for carbon dioxide pipelines: part 1: project overview and outcomes of test 1[C]. Calgary: 2018 12th International Pipeline Conference,2018: V003T05A008.
[15] MICHAL G,DAVIS B,?STBY E,LU C,R?NEID S. CO2SAFE-ARREST: a full-scale burst test research program for carbon dioxide pipelines: part 2: is the BTCM out of touch with dense-phase CO2?[C]. Calgary: 2018 12th International Pipeline Conference,2018: V003T05A009.
[16] GODBOLE A,LIU X,MICHAL G,LU C,MEDINA C H. CO2SAFE-ARREST: a full-scale burst test research program for carbon dioxide pipelines: part 3: dispersion modelling[C]. Calgary: 2018 12th International Pipeline Conference,2018:V002T07A020.
[17] 李鹤,谢萍,庞艳凤,杨明,池强,霍春勇.全尺寸气体爆破试验用管道设计技术难点[J].石油管材与仪器,2020,6(1):32-35. 10.19459/j.cnki.61-1500/te.2020.01.008. LI H,XIE P,PANG Y F,YANG M,CHI Q,HUO C Y. Technology problems of pipeline design for the full-scale burst testing[J]. Petroleum Tubular Goods & Instruments,2020,6(1):32-35.
[18] 池强,杨坤,李鹤,李炎华.高钢级管道全尺寸气体爆破试验技术研究[J].焊管,2019,42(7):78-82,89. 10.19291/j.cnki. 1001-3938.2019.7.009. CHI Q,YANG K,LI H,LI Y H. Research on full-scale gas blasting test technology for high-grade pipeline[J]. Welded Pipe and Tube,2019,42(7): 78-82,89.
[19] 李胜男,苗青,欧阳欣,李鹤,王俊,池强.密相/超临界CO2管道全尺寸爆破试验综述[J].石油管材与仪器,2023,9(1):16-22. 10.19459/j.cnki.61-1500/te.2023.01.003. LI S N,MIAO Q,OUYANG X,LI H,WANG J,CHI Q. Overview of full-scale burst test for dense phase/supercritical carbon dioxide pipeline[J]. Petroleum Tubular Goods &Instruments,2023,9(1): 16-22.
[20] 南同庆,陈兵,徐梦林,闫帅伟,黄华雨,庞钥,等.基于CCUS的超临界CO2管道止裂韧性研究进展[J].油气与新能源,2023,35(1):101-110. 10.3969/j.issn.2097-0021.2023. 01.013. NAN T Q,CHEN B,XU M L,YAN S W,HUANG H Y,PANG Y,et al. Research progress of supercritical CO2 transportation pipeline cracking toughness based on CCUS[J]. Petroleum and New Energy,2023,35(1): 101-110.

相似文献/References:

[1]帅义 帅健 狄彦.含凹陷管道全尺寸爆破试验[J].油气储运,2016,35(预出版):1.
 SHUAI Yi,SHUAI Jian,DI Yan.Full-scale burst experiments on dented pipeline[J].Oil & Gas Storage and Transportation,2016,35(05):1.
[2]帅义,帅健,狄彦.含凹陷管道全尺寸爆破试验[J].油气储运,2017,36(1):44.[doi:10.6047/j.issn.1000-8241.2017.01.006]
 SHUAI Yi,SHUAI Jian,DI Yan.Full-scale burst experiments on dented pipeline[J].Oil & Gas Storage and Transportation,2017,36(05):44.[doi:10.6047/j.issn.1000-8241.2017.01.006]
[3]陈兵 李磊磊 齐文娇.BTC方法研究进展及其应用于CO2管道止裂韧性计算的可行性[J].油气储运,2024,43(05):1.
 CHEN Bing,LI Leilei,QI Wenjiao.Research progress of BTC method and feasibility of its application to calculate the crack arrest toughness calculation of CO2 pipelines[J].Oil & Gas Storage and Transportation,2024,43(05):1.
[4]陈兵,李磊磊,齐文娇.BTC方法应用于CO2管道止裂韧性计算的可行性[J].油气储运,2024,43(05):524.[doi:10.6047/j.issn.1000-8241.2024.05.005]
 CHEN Bing,LI Leilei,QI Wenjiao.Research progress of BTC method and feasibility of its application to calculate crack arrest toughness of CO2 pipeline[J].Oil & Gas Storage and Transportation,2024,43(05):524.[doi:10.6047/j.issn.1000-8241.2024.05.005]
[5]苗青.二氧化碳管道全尺寸爆破试验[J].油气储运,2024,43(05):1.
 Miao qing.A full-scale burst test research for CO2 pipeline[J].Oil & Gas Storage and Transportation,2024,43(05):1.

备注/Memo

苗青,男,1969年生,高级工程师,1991年毕业于北京大学力学专业,现主要从事油气管道流动保障及新能源储运技术方向的研究工作。地址:河北省廊坊市广阳区金光道51号,065000。电话:18903265295。Email:miaoqing@pipechina.com.cn
基金项目:国家石油天然气管网集团有限公司项目“超临界CO2管道输送技术研究”,SSCC202107。
· Received: 2023-09-05 · Revised: 2023-10-07 · Online: 2024-01-15

更新日期/Last Update: 2024-05-25