重型车辆碾压下埋地X70管道力学响应

参考文献/References:

[1] MARSTON A, ANDERSON A O. The theory of loads on pipes in ditches, and tests of cement and clay drain tile and sewer pipe[M]. Ames: Iowa State University, 1913: 97-99.
[2] SPANGLER M G, SHAFER G E. The structural design of flexible pipe culverts[C]. Washington, D.C.: Proceedings of the Seventeenth Annual Meeting of the Highway Research Board, 1938: 235-239.
[3] SPANGLER M G. Pipeline crossings under railroads and highways[J]. Journal-American Water Works Association, 1964, 56(8): 1029-1046. DOI: 10.1002/j.1551-8833.1964.tb01300.x.
[4] 曾国熙.土埧下涵管竖向土压力的计算[J].浙江大学学报, 1960(1):79-98. ZENG G X. Calculation of vertical earth pressure on culvert pipes under earth embankments and ponds[J]. Journal of Zhejiang University, 1960(1): 79-98.
[5] 顾安全.上埋式管道及洞室垂直土压力的研究[J].岩土工程学报,1981,3(1):3-15. GU A Q. Investigation of the vertical earth pressure on projecting conduit and underground chamber under a high embankment[J]. Chinese Journal of Geotechnical Engineering, 1981, 3(1): 3-15.
[6] 折学森,顾安全.沟谷地形中埋设管道的土压力研究[J].西安公路学院学报,1989,7(4):33-39. SHE X S, GU A Q. Study on the earth pressure on conduit lying hidden in the trench terrain[J]. Journal of Xi'an Highway University, 1989, 7(4): 33-39.
[7] 邓道明,李育光.埋地柔性管道的应力和变形分析[J].油气储运, 1998,17(6):11-14,57. 10.6047/j.issn.1000-8241.1998.06.004. DENG D M, LI Y G. Analysis on stress and distortion of buried flexible pipeline[J]. Oil & Gas Storage and Transportation, 1998, 17(6): 11-14, 57.
[8] 邓道明,孙建刚,张彦敏.穿越公路及铁路埋地管道的设计计算[J]. 油气储运,1998,17(9):13-17. 10.6047/j.issn.1000-8241.1998.09.005. DENG D M, SUN J G, ZHANG Y M. Design calculation for buried road& railway crossing pipelines[J]. Oil & Gas Storage and Transportation, 1998, 17(9): 13-17.
[9] 刘全林,杨敏.上埋式管道上竖向土压力计算的探讨[J].岩土力学,2001,22(2):214-218. 10.3969/j.issn.1000-7598.2001.02.024. LIU Q L, YANG M. Study of vertical soil pressure on positive buried pipeline[J]. Rock and Soil Mechanics, 2001, 22(2): 214-218.
[10] 王直民.交通荷载作用下埋地管道的力学性状研究[D].杭州:浙江大学,2006. WANG Z M. Study on mechanical behaviors of buried pipelines under traffic loads[D]. Hangzhou: Zhejiang University, 2006.
[11] 李新亮,李素贞,申永刚.交通荷载作用下埋地管道应力分析与现场测试[J].浙江大学学报(工学版),2014,48(11):1976-1982. 10.3785/j.issn.1008-973X.2014.11.010. LI X L, LI S Z, SHEN Y G. Stress analysis and field testing of buried pipeline under traffic load[J]. Journal of Zhejiang University (Engineering Science), 2014, 48(11): 1976-1982.
[12] 肖冶,王茂棠,张振远.无套管穿越道路的探讨[J].油气储运, 1988,7(3):54-59. 10.6047/j.issn.1000-8241.1988.03.014. XIAO Y, WANG M T, ZHANG Z Y. Sleeveless road crossing probed[J]. Oil & Gas Storage and Transportation, 1988, 7(3):54-59.
[13] LAY G R. Response of reinforced concrete and corrugated steel pipes to surface load[D]. Kingston: Queen’s University, 2012.
[14] HYODO M, YASUHARA K. Analytical procedure for evaluating pore-water pressure and deformation of saturated clay ground subjected to traffic loads[M]//SWOBODA G. Numerical Methods in Geomechanics Volume 1. London: Routledge, 1988: 653-658.
[15] G?C?YEN E, ERDEM R T, KANTAR E. Experimental study on pipe sections against impact loading[J]. TEM Journal, 2018, 7(1): 97-104. DOI: 10.18421/TEM71-11.
[16] 张东,张宏,周雅哲,江金旭,施宁,吴张中,等.重车碾压作用下X65管道力学响应及影响因素[J].油气储运,2022,41(2):177-184. 10.6047/j.issn.1000-8241.2022.02.007. ZHANG D, ZHANG H, ZHOU Y Z, JIANG J X, SHI N, WU Z Z, et al. Mechanical response of X65 pipeline under rolling compaction of heavy trucks and the influencing factors[J]. Oil &Gas Storage and Transportation, 2022, 41(2): 177-184.
[17] TOHIDI R Z, SHAKIB H. Response of steel buried pipeline to the three-dimensional fault movements[J]. Journal of Science and Technology, 2003, 14(56): 1127-1135.
[18] ROBERT D J, RAJEEV P, KODIKARA J, et al. Equation to predict maximum pipe stress incorporating internal and external loadings on buried pipes[J]. Canadian Geotechnical Journal, 2016, 53(8): 1315-1331. DOI: 10.1139/cgj-2015-0500.
[19] ALZABEEBEE S, CHAPMAN D N, FARAMARZI A. A comparative study of the response of buried pipes under static and moving loads[J]. Transportation Geotechnics, 2018, 15:39-46. DOI: 10.1016/j.trgeo.2018.03.001.
[20] 李洵.交通荷载作用下埋地管道的力学性状分析[D].杭州:浙江大学,2004. LI X. Analysis on mechanical characteristics of pipelines buried in soft soil under transportation loads[D]. Hangzhou: Zhejiang University, 2004.
[21] 芶文锦.车行道下方埋地管道的力学性状研究[D].重庆:重庆大学,2016. GOU W J. Study on mechanical characteristics of buried pipelines under the roadway[D]. Chongqing: Chongqing University, 2016.
[22] 郭健.不同交通荷载条件下埋地管道力学性状分析[J].城市燃气,2021(增刊1):37-45. GUO J. Analysis of mechanical properties of buried pipelines under different traffic load conditions[J]. Urban Gas, 2021(S1):37-45.
[23] 胡建林,孙利成,崔宏环,高鹏飞.基于修正摩尔库伦模型的深基坑变形数值分析[J].科学技术与工程,2021,21(18):7717-7723. 10.3969/j.issn.1671-1815.2021.18.045. HU J L, SUN L C, CUI H H, GAO P F. Numerical analysis of deep foundation pit deformation based on modified Mohr-Coulomb model[J]. Science Technology and Engineering, 2021, 21(18): 7717-7723.
[24] 郭建强,蒋建国,刘新荣,陈建行,卢雪峰,杨前冬.基于弹性应变能D-P强度准则修正[J].土木工程学报,2021,54(6):110-116. 10.15951/j.tmgcxb.2021.06.010. GUO J Q, JIANG J G, LIU X R, CHEN J H, LU X F, YANG Q D. Modification of Drucker-Prager strength criterion based on the elastic strain energy[J]. China Civil Engineering Journal, 2021, 54(6): 110-116.
[25] 费康,彭劼. ABAQUS岩土工程实例详解[M].北京:人民邮电出版社,2017:81. FEI K, PENG J. Detailed explanation of ABAQUS geotechnical engineering examples[M]. Beijing: Posts & Telecom Press, 2017: 81.
[26] 钟阳,王哲人,张肖宁.不平整路面上行驶的车辆对路面随机动压力的分析[J].中国公路学报,1992,5(2):40-43. 10.19721/j.cnki.1001-7372.1992.02.007. ZHONG Y, WANG Z R, ZHANG X N. Random dynamic pressure of moving vehicle on rough pavement[J]. China Journal of Highway and Transport, 1992, 5(2): 40-43.
[27] 王永强,牛星钢,谭钦文.重型车辆荷载下埋地天然气管道的安全分析[J].中国安全生产科学技术,2011,7(8):109-114. 10.3969/j.issn.1673-193X.2011.08.019. WANG Y Q, NIU X G, TAN Q W. Safety analysis of Buried natural gas pipeline under heavy vehicle load[J]. China Work Safety Science and Technology, 2011, 7(8): 109-114.

相似文献/References:

[1]周祥.埋地钢质管道外涂层缺陷的安全质量分级评价[J].油气储运,2011,30(04):299.[doi:10.6047/j.issn.1000-8241.2011.04.017]
 Zhou Xiang.Safety quality grading evaluation on the external coating defects of buried steel pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):299.[doi:10.6047/j.issn.1000-8241.2011.04.017]
[2]付吉强,吴明,杜明俊,等.埋地管道周围土壤湿热耦合相变过程的数值计算[J].油气储运,2011,30(01):30.[doi:10.6047/j.issn.1000-8241.2011.01.008]
 Fu Jiqiang,Wu Ming,Du Mingjun,et al.Numerical calculation on heat-moisture coupling and phase change process of the soil around buried pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):30.[doi:10.6047/j.issn.1000-8241.2011.01.008]
[3]陈杨,王为民,陈伟聪,等.基于故障树与模糊理论的埋地管道风险评价[J].油气储运,2011,30(07):481.[doi:10.6047/j.issn.1000-8241.2011.07.001]
 Chen Yang,Wang Weimin,Chen Weicong,et al.Risk assessment of the buried pipeline based on the fault tree and fuzzy theory[J].Oil & Gas Storage and Transportation,2011,30(04):481.[doi:10.6047/j.issn.1000-8241.2011.07.001]
[4]胡士信,陆家榆,张本革,等.邻近强电线路管道交流干扰参数的测试方法[J].油气储运,2011,30(03):203.[doi:10.6047/j.issn.1000-8241.2011.03.012]
 Hu Shixin,Lu Jiayu,Zhang Benge,et al.Test method of AC interference parameters for pipeline adjacent power transmission lines[J].Oil & Gas Storage and Transportation,2011,30(04):203.[doi:10.6047/j.issn.1000-8241.2011.03.012]
[5]李朝阳,马贵阳,刘亮.埋地输油管道泄漏油品扩散模拟[J].油气储运,2011,30(09):674.[doi:10.6047/j.issn.1000-8241.2011.09.008]
 Li Zhaoyang,Ma Guiyang,Liu Liang,et al.Diffusion simulation on leaked oil for buried pipelines[J].Oil & Gas Storage and Transportation,2011,30(04):674.[doi:10.6047/j.issn.1000-8241.2011.09.008]
[6]王鸿膺,蒋涛,秦晓霞,等.川气东送管道土壤腐蚀埋片试验[J].油气储运,2010,29(10):769.[doi:10.6047/j.issn.1000-8241.2010.10.013]
 Wang Hongying,Jiang Tao,Qin Xiaoxia.Field Coupon Testing on the Soil Corrosivity of Sichuan-East Gas Pipeline[J].Oil & Gas Storage and Transportation,2010,29(04):769.[doi:10.6047/j.issn.1000-8241.2010.10.013]
[7]薛致远,张丰,毕武喜,等.东北管网阴极保护通电/断电电位测量与分析[J].油气储运,2010,29(10):772.[doi:10.6047/j.issn.1000-8241.2010.10.014]
 Xue Zhiyuan,Zhang Feng,Bi Wuxi.The Measurement and Analysis of On/Off-potential in Northeast Oil Pipeline Networks[J].Oil & Gas Storage and Transportation,2010,29(04):772.[doi:10.6047/j.issn.1000-8241.2010.10.014]
[8]刘仕鳌 蒲红宇 刘书文 蒋洪.埋地管道应力分析方法[J].油气储运,2012,31(4):274.[doi:10.6047/j.issn.1000-8241.2012.04.009]
 Liu Shiao,Pu Hongyu,Liu Shuwen,et al.Stress analysis method of buried pipeline[J].Oil & Gas Storage and Transportation,2012,31(04):274.[doi:10.6047/j.issn.1000-8241.2012.04.009]
[9]吴峰,李向阳,张治军.埋地参数对管道同沟敷设传热的影响[J].油气储运,2010,29(11):835.[doi:10.6047/j.issn.1000-8241.2010.11.009]
 Wu Feng,Li Xiangyang,Zhang Zhijun.Influence of Buried Parameters for Heat Transfer of Pipelines Laid in One Ditch[J].Oil & Gas Storage and Transportation,2010,29(04):835.[doi:10.6047/j.issn.1000-8241.2010.11.009]
[10]赵雄,周卫军,郭瑞.SPAE评价法在管道防腐层性能评价中的应用[J].油气储运,2009,28(11):54.[doi:10.6047/j.issn.1000-8241.2009.11.015]
 ZHAO Xiong,ZHOU Weijun.Application of SPAE Method in Coating Performance Evaluation of Pipelines[J].Oil & Gas Storage and Transportation,2009,28(04):54.[doi:10.6047/j.issn.1000-8241.2009.11.015]
[11]李玉坤 董壮 常景龙 裴晨亮 周鹏 杨澳 李洪涛 李旺.重型车辆碾压下埋地X70管道力学响应研究[J].油气储运,2024,43(04):1.
 LI Yukun,DONG Zhuang,CHANG Jinglong,et al.Study on mechanical response of buried X70 pipeline under heavy vehicle rolling[J].Oil & Gas Storage and Transportation,2024,43(04):1.

备注/Memo

李玉坤,男,1973年生,副教授,1999年硕士毕业于中国石油大学(华东)油气田开发专业,现主要从事管道变形力学仿真与测试技术研究工作。地址:山东省青岛市黄岛区长江西路66号,266580。电话:18853250098。Email:mliyk@upc.edu.cn
通信作者:裴晨亮,男,1997年生,在读硕士生,2021年毕业于中国石油大学(华东)土木工程专业,现主要从事埋地油气管道力学响应研究工作。地址:山东省青岛市黄岛区长江西路66号,266580。电话:17863989828。Email:3407208189@qq.com