[1]高晋.特大型LNG储罐穹顶结构承载实验与设计计算[J].油气储运,2022,41(10):1175-1180,1224.[doi:10.6047/j.issn.1000-8241.2022.10.007]
 GAO Jin.Bearing experiment and design calculation of dome structure of extra-large LNG storage tank[J].Oil & Gas Storage and Transportation,2022,41(10):1175-1180,1224.[doi:10.6047/j.issn.1000-8241.2022.10.007]
点击复制

特大型LNG储罐穹顶结构承载实验与设计计算

参考文献/References:

[1] 张晨,陈峰,王亚群,安东雨,吕梦芸,孙亚娟.大型LNG储罐预冷分析模型与工程应用研究[J].化工管理,2020(7):161-164. ZHANG C, CHEN F, WANG Y Q, AN D Y, LYU M Y, SUN Y J. Analysis model and engineering application of large LNG storage tank precooling[J]. Chemical Enterprise Management, 2020(7): 161-164.
[2] 翟希梅,赵新宇.液化天然气储罐混凝土穹顶的冲击破坏模式与机理[J].爆炸与冲击,2018,38(5):966-976. ZHAI X M, ZHAO X Y. Damage modes and failure mechanism of concrete dome of LNG storage tank[J]. Explosion and Shock Waves, 2018, 38(5): 966-976.
[3] 唐广庚.超大型LNG储罐若干问题研究[D].哈尔滨:哈尔滨工业大学,2017. TANG G G. Research of several problems of ultra-large LNG storage tank[D]. Harbin: Harbin Institute of Technology, 2017.
[4] 翟希梅,王恒. LNG储罐穹顶带钢板网壳施工全过程稳定性分析[J].哈尔滨工业大学学报,2015,47(4):31-36. ZHAI X M, WANG H. Complete process analysis of reticulated dome with steel plates of LNG tank in the construction period[J]. Journal of Harbin Institute of Technology, 2015, 47(4): 31-36.
[5] 谢剑,何飞.大型液化天然气储罐穹顶的优化设计[J].工业建筑,2012,42(4):78-81,98. XIE J, HE F. Optimization design on the roof of large LNG tank[J]. Industrial Construction, 2012, 42(4): 78-81, 98.
[6] SHI L, SHUAI J, WANG X L, XU K. Experimental and numerical investigation of stress in a large-scale steel tank with a floating roof[J]. Thin-Walled Structures, 2017, 117: 25-34.
[7] SHEN J, WU Y L, LIU Y H. Buckling analysis of tank roof with construction defect based on finite element method[J]. Procedia Engineering, 2015, 130: 390-399.
[8] ZHANG C. A design algorithm used for the roof frame and liner system of extra-large LNG storage tanks[J]. Natural Gas Industry B, 2018, 5(3): 276-281.
[9] BURGOS C A, JACA R C, LASSIG J L, GODOY L A. Wind buckling of tanks with conical roof considering shielding by another tank[J]. Thin-Walled Structures, 2014, 84: 226-240.
[10] 马玉彬,纪金豹,闫维明.试件脆性破坏致试验机振动机理的模型试验研究[J].北京工业大学学报,2020,46(5):483-489. MA Y B, JI J B, YAN W M. Scale model test of vibration of structural testing machine caused by specimen brittle failure[J]. Journal of Beijing University of Technology, 2020, 46(5): 483-489.
[11] 李雄彦,刘人杰,景辉,薛素铎,樊钦鑫,卢珍.面向工程的大跨空间结构动力缩尺模型设计制作方法[J/OL].建筑结构学报:1-10[2022-05-27]. https://kns.cnki.net/kcms/detail/11.1931. TU.20220314.2241.001.html. LI X Y, LIU R J, JING H, XUE S D, FAN Q X, LU Z. Design and fabrication method of dynamic scale model for large span spatial structures[J/OL]. Journal of Building Structures:1-10[2022-05-27]. https://kns.cnki.net/kcms/detail/11.1931. TU.20220314.2241.001.html.
[12] 杨俊杰.相似理论与结构模型试验[M].武汉:武汉理工大学出版社,2005:203-255. YANG J J. Similarity theory and structural model test[M]. Wuhan: Wuhan University of Technology Press, 2005: 203-255.
[13] 刘洋,程昊,肖立,张博超,黄欢.大型LNG预应力混凝土储罐服役期模拟分析[J].石油和化工设备,2020,23(3):20-25. LIU Y, CHENG H, XIAO L, ZHANG B C, HUANG H. Simulation analysis of service period of large LNG prestressed concrete storage tank[J]. Petro & Chemical Equipment, 2020, 23(3): 20-25.
[14] 王恒.大型LNG储罐混凝土外罐及穹顶施工期间全过程受力分析[D].哈尔滨:哈尔滨工业大学,2014. WANG H. Complete process analysis of concrete outer tank and dome during the construction period of LNG tank[D]. Harbin:Harbin Institute of Technology, 2014.
[15] CAPRINOZZI S, PAOLACCI F, DOL?EK M. Seismic risk assessment of liquid overtopping in a steel storage tank equipped with a single deck floating roof[J]. Journal of Loss Prevention in the Process Industries, 2020, 67: 104269.
[16] 王迪涛.某大跨度空间钢结构设计中的关键问题分析[D].西安:西安建筑科技大学,2016. WANG D T. Analysis of the key problems on the design of a large span spatial steel structure[D]. Xi'an: Xi'an University of Architecture and Technology, 2016.
[17] 刘勇.核电站穹顶内安装施工风险综合评价研究[D].湘潭:湖南科技大学,2011. LIU Y. Study on comprehensive risk assessment for installation and construction in dome of nuclear power station[D]. Xiangtan: Hunan University of Science and Technology, 2011.
[18] 薛红京.大跨度空间结构选型设计研究[D].北京:北京建筑大学,2018. XUE H J. Research on structural selection and design of large span spatial struction[D]. Beijing: Beijing University of Civil Engineering and Architecture, 2018.
[19] 陈志华,刘红波,周婷,曲秀姝.空间钢结构APDL参数化计算与分析[M].北京:中国水利水电出版社,2013:121-152. CHEN Z H, LIU H B, ZHOU T, QU X S. Parametric calculation and analysis of APDL for space steel structure[M]. Beijing: China Water & Power Press, 2013: 121-152.
[20] 王新敏. ANSYS工程结构数值分析[M].北京:人民交通出版社,2007:410-495. WANG X M. Numerical analysis of ANSYS engineering structure[M]. Beijing: China Communications Press, 2007:410-495.

相似文献/References:

[1]胡德新.天然气的地下岩洞储存[J].油气储运,2010,29(3):165.[doi:10.6047/j.issn.1000-8241.2010.03.002]
 Hu Dexin.Underground Cavern Storage of Natural Gas[J].Oil & Gas Storage and Transportation,2010,29(10):165.[doi:10.6047/j.issn.1000-8241.2010.03.002]
[2]朱鸿梅,孙恒,刘宏伟.大型 LNG 储罐角部绝热结构的温度场[J].油气储运,2011,30(01):37.[doi:10.6047/j.issn.1000-8241.2011.01.010]
 Zhu Hongmei,Sun Heng,Liu Hongwei.Temperature field on corner adiabatic structure of large-scale LNG storage tank[J].Oil & Gas Storage and Transportation,2011,30(10):37.[doi:10.6047/j.issn.1000-8241.2011.01.010]
[3]王彦,信鹏,高萃仙,等.LNG接收站蒸发气的发生与气量计算[J].油气储运,2010,29(5):363.[doi:10.6047/j.issn.1000-8241.2010.05.013]
 Wang Van,Xin Peng,Gao Cuixian.Generation of Vapour and Vapour Volurne Calculation for LNG Receiving Station[J].Oil & Gas Storage and Transportation,2010,29(10):363.[doi:10.6047/j.issn.1000-8241.2010.05.013]
[4]王海蓉 梁栋.LNG 分层翻滚事故可预测性与盐水模化实验[J].油气储运,2012,31(4):246.[doi:10.6047/j.issn.1000-8241.2012.04.002]
 Wang Hairong and Liang Dong.Predictability of LNG stratification rollover and salt water modeling experiment[J].Oil & Gas Storage and Transportation,2012,31(10):246.[doi:10.6047/j.issn.1000-8241.2012.04.002]
[5]孙青峰,赵德贵.LNG接收站储罐配置[J].油气储运,2009,28(3):17.[doi:10.6047/j.issn.1000-8241.2009.03.006]
 SUN Qingfeng,ZHAO Degui.Configuration of Tanks in LNG Terminal Stations[J].Oil & Gas Storage and Transportation,2009,28(10):17.[doi:10.6047/j.issn.1000-8241.2009.03.006]
[6]邵铁民.LNG冷能及其利用[J].油气储运,2007,26(11):41.[doi:10.6047/j.issn.1000-8241.2007.11.012]
 SHAO Tiemin.Cold Energy of LNG and its Comprehensive Utilization[J].Oil & Gas Storage and Transportation,2007,26(10):41.[doi:10.6047/j.issn.1000-8241.2007.11.012]
[7]赵保才,李涛.LNG静态测量计算[J].油气储运,2006,25(8):36.[doi:DOI:10.6047/j.issn.1000-8241.2006.08.010]
 ZHAO Baocai,LI Tao.Static Measnrement and Calculation of LNG[J].Oil & Gas Storage and Transportation,2006,25(10):36.[doi:DOI:10.6047/j.issn.1000-8241.2006.08.010]
[8]李安,李小瑜,邵勇,等.某LNG站管网与管径的优化计算[J].油气储运,2005,24(11):19.[doi:10.6047/j.issn.1000-8241.2005.11.006]
 LI An,LI Xiaoyu.Optimal Calculation on Pipeline Network and Pipe Diameter for Some LNG Statoin[J].Oil & Gas Storage and Transportation,2005,24(10):19.[doi:10.6047/j.issn.1000-8241.2005.11.006]
[9]付愉庆,刘飞飞,肖丁,等.LNG气化装置在城市燃气系统中的应用[J].油气储运,2009,28(9):58.[doi:10.6047/j.issn.1000-8241.2009.09.019]
 FU Yuqing,LIU Feifei.Application of LNG Gasification Unit in City Gas System[J].Oil & Gas Storage and Transportation,2009,28(10):58.[doi:10.6047/j.issn.1000-8241.2009.09.019]
[10]孟庆萍.海上盐穴LNG接收终端[J].油气储运,2009,28(6):38.[doi:10.6047/j.issn.1000-8241.2009.06.011]
 MENG Qingping.Offshore Salt-Cavern-based LNG Receiving Terminals[J].Oil & Gas Storage and Transportation,2009,28(10):38.[doi:10.6047/j.issn.1000-8241.2009.06.011]

备注/Memo

高晋,男,1974年生,高级工程师,1997年毕业于浙江大学化工设备与机械专业,现主要从事油气地面工程领域工程设计与技术管理工作。地址:山东省东营市东营区济南路49号,257000。电话:16688150189。Email:gaojin.osec@sinopec.com
(收稿日期:2021-10-10;修回日期:2022-07-17;编辑:张腾)

更新日期/Last Update: 2022-10-25