网站版权 © 《油气储运》编辑部 陕ICP备11014090号-10
地址:河北省廊坊市金光道51号(065000);电话:0316-2176193 / 0316-2072055; 传真:0316-2177392; 网址:yqcy.paperonce.org
技术支持:西安三才科技实业有限公司 029-89381847;029-88222991
[1]贾保印 白改玲.大气压变化对蒸发气压缩机处理能力的影响[J].油气储运,2016,35(预出版):1.
JIA Baoyin,BAI Gailing.Impacts of changes in atmospheric pressure to processing capacity of BOG compressor[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[2]刘树锋 周怀发 孙世一.LNG 槽车装车橇测试验收及试运行的控制要点[J].油气储运,2016,35(预出版):1.
LIU Shufeng,ZHOU Huaifa,SUN Shiyi.Key control points in the acceptance test and commissioning of skid-mounted LNG tanker loading facility[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[3]彭延建,张超,肖立.LNG卸料管道穿堤布置方案的设计[J].油气储运,2016,35(4):412.[doi:10.6047/j.issn.1000-8241.2016.04.012]
PENG Yanjian,ZHANG Chao,XIAO Li.Design on the arrangement program of LNG unloading pipeline crossing seawall[J].Oil & Gas Storage and Transportation,2016,35(预出版):412.[doi:10.6047/j.issn.1000-8241.2016.04.012]
[4]彭延建 张超 肖立.LNG 卸料管道穿堤布置方案的设计[J].油气储运,2016,35(预出版):1.
PENG Yanjian,ZHANG Chao,XIAO Li.Design on the arrangement program of LNG unloading pipeline crossing seawall[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[5]王赟,贺三,战永辉,等.移动式小型BOG增压再液化装置功耗的模拟计算[J].油气储运,2015,34(6):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
WANG Yun,HE San,ZHAN Yonghui,et al.Simulated calculation of power consumption of the mobile small-scale BOG compression and reliquefaction plant[J].Oil & Gas Storage and Transportation,2015,34(预出版):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
[6]薛倩 刘名瑞 肖文涛 王晓霖 张久久.LNG 接收站 BOG 处理工艺优化及能耗分析[J].油气储运,2016,35(预出版):1.
XUE Qian,LIU Mingrui,XIAO Wentao,et al.Optimization and energy consumption analysis of BOG treatment processes in LNG terminal[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[7]薛倩,刘名瑞,肖文涛,等.LNG接收站BOG处理工艺优化及功耗分析[J].油气储运,2016,35(4):376.[doi:10.6047/j.issn.1000-8241.2016.04.005]
XUE Qian,LIU Mingrui,XIAO Wentao,et al.Optimization and energy consumption analysis of BOG treatment processes in LNG terminal[J].Oil & Gas Storage and Transportation,2016,35(预出版):376.[doi:10.6047/j.issn.1000-8241.2016.04.005]
[8]刘树锋,周怀发,孙世一.LNG槽车装车橇测试验收及试运行的控制要点[J].油气储运,2016,35(4):444.[doi:10.6047/j.issn.1000-8241.2016.04.018]
LIU Shufeng,ZHOU Huaifa,SUN Shiyi.Key control points in the acceptance test and commissioning of skidmounted LNG tanker loading facility[J].Oil & Gas Storage and Transportation,2016,35(预出版):444.[doi:10.6047/j.issn.1000-8241.2016.04.018]
[9]周怀发,申永亮,张兴,等.基于层次分析与集对分析法的LNG 槽车区风险评价[J].油气储运,2019,38(03):279.[doi:10.6047/j.issn.1000-8241.2019.03.006]
ZHOU Huaifa,SHEN Yongliang,ZHANG Xing,et al.Risk assessment on LNG tanker loading region based on analytical hierarchy process and set pair analysis theory[J].Oil & Gas Storage and Transportation,2019,38(预出版):279.[doi:10.6047/j.issn.1000-8241.2019.03.006]
[10]徐波 段林杰 戴梦 李妍 闫锋 胡森.LNG 全运输系统运行可靠度计算方法[J].油气储运,2020,39(01):48.[doi:10.6047/j.issn.1000-8241.2020.01.007]
XU Bo,DUAN Linjie,DAI Meng,et al.A calculation method for the operation reliability of LNG whole transportation system[J].Oil & Gas Storage and Transportation,2020,39(预出版):48.[doi:10.6047/j.issn.1000-8241.2020.01.007]