[1]韩银杉,张宏.走滑断层作用下管道应变解析计算方法的适用性[J].油气储运,2016,35(12):1329-1336.[doi:10.6047/j.issn.1000-8241.2016.12.014]
 HAN Yinshan,ZHANG Hong.Applicability of analytical calculation methods on the pipeline strain under the effect of strike-slip fault[J].Oil & Gas Storage and Transportation,2016,35(12):1329-1336.[doi:10.6047/j.issn.1000-8241.2016.12.014]
点击复制

走滑断层作用下管道应变解析计算方法的适用性

参考文献/References:

[1] 余志峰,史航,佟雷,等. 基于应变设计方法在西气东输二线的 应用[J]. 油气储运,2010,29(2):143-147. YU Z F,SHI H,TONG L,et al. Application of strain-based design method in West-to-East Parallel Gas Transmission Pipeline Project[J]. Oil & Gas Storage and Transportation, 2010,29(2):143-147.
[2] 刘啸奔,张宏,李勐,等. 断层作用下埋地管道应变分析方法研 究进展[J]. 油气储运,2016,35(8):799-807. LIU X B,ZHANG H,LI M,et al. Research progress of strain analysis methods for buried pipelines under faulting process[J]. Oil & Gas Storage and Transportation,2016,35(8):799-807.
[3] 李小军,侯春林,赵雷,等. 跨断层埋地管道反应分析改进的 Newmark 方法[J]. 岩土力学,2008,29(5):1210-1216. LI X J,HOU C L,ZHAO L,et al. An improved Newmark method for analyzing response of buried pipeline crossing fault[J]. Rocks and Soil Mechanics,2008,29(5):1210-1216. [4] NEWMARK N M,HALL W J. Pipeline design to resist large fault displacement[C]. Ann Arbor:Proceedings of the US National Conference on Earthquake Engineering,1975:799-807.
[5] KENNEDY R P,DARROW A W,WILLIAMSON R A. Fault movement effects on buried oil pipeline[J]. Transport Engineering Journal,1977,103(5):617-633.
[6] WANG L R L,YEH Y H. A refined seismic analysis and design of buried pipeline for fault movement[J]. Earthquake Engineering and Structural Dynamics,1985,103(5):75-96.
[7] WANG L R L,WANG L J. Parametric study of buried pipelines due to large fault movements[C]. Kobe:Proceedings of the Third China-Japan-US Trilateral Symposium on Lifeline Earthquake Engineering,1995:165-172.
[8] 刘爱文,张素灵,胡聿贤,等. 地震断层作用下埋地管线的反应 分析[J]. 地震工程与工程振动,2002,22(2):22-27. LIU A W,ZHANG S L,HU Y X,et al. A method for analyzing response of buried pipeline due to earthquake fault movement[J]. Earthquake Engineering and Engineering Vibration,2002,22(2): 22-27.
[9] KARAMITROS D K,BOUCKOVALAS G D,KOURETZIS G P. Stress analysis of buried steel pipelines at strike-slip fault crossings[J]. Soil Dynamics & Earthquake Engineering,2007, 27(3):200-211.
[10] TRIFONOV O V,CHERNIY V P. A semi-analytical approach to a nonlinear stress-strain analysis of buried steel pipelines crossing active faults[J]. Soil Dynamics & Earthquake Engineering,2010,30(11):1298-1308.
[11] 王滨. 断层作用下埋地钢质管道反应分析方法研究[D]. 大连: 大连理工大学,2011:17-72. WANG B. Study on analytical methods of buried steel pipelines under active faults[D]. Dalian:Dalian University of Technology,2011:17-72.
[12] XIE X J. Numerical analysis and evaluation of buried pipeline response to earthquake-induced ground fault rupture[D]. New York:Rensselaer Polytechnic Institute,2008:18-38.
[13] 刘啸奔,陈严飞,张宏,等. 跨断层区X80 钢管道受压时的设计 应变预测[J]. 天然气工业,2014,34(12):123-130. LIU X B,CHEN Y F,ZHANG H,et al. Prediction on the design strain of the X80 steel pipelines across active faults under stress[J]. Natural Gas Industry,2014,34(12):123-130.
[14] LIU X B,ZHANG H,CHEN Y F. Strain prediction of X80 steel pipeline at strike-slip fault under compression combined with bending[C]. Boston:Proceedings of the 2015 ASME Pressure Vessels & Piping Conference,2015:19-23.
[15] LIU X B,ZHANG H,HAN Y S,et al. A semi-empirical model for peak strain prediction of buried X80 steel pipelines under compression and bending at strike-slip fault crossings[J]. Journal of Natural Gas Science & Engineering,2016(32): 465-475.

相似文献/References:

[1]赵慧,倪洪亮,王博,等.热泵在原油长输管道的应用前景[J].油气储运,2011,30(04):293.[doi:10.6047/j.issn.1000-8241.2011.04.015]
 Zhao Hui,Ni Hongliang,Wang Bo,et al.Application prospect of heat pump in long-distance crude oil pipeline[J].Oil & Gas Storage and Transportation,2011,30(12):293.[doi:10.6047/j.issn.1000-8241.2011.04.015]
[2]张伟,许康,齐世明,等.加热炉改烧煤焦油存在的问题[J].油气储运,2011,30(03):220.[doi:10.6047/j.issn.1000-8241.2011.03.016]
 Zhang Wei,Xu Kang,Qi Shiming,et al.Problems of adopting coal tar in heater[J].Oil & Gas Storage and Transportation,2011,30(12):220.[doi:10.6047/j.issn.1000-8241.2011.03.016]
[3]王永红,李晓平,宫敬.长输管道在线仿真系统的应用与展望[J].油气储运,2011,30(02):90.[doi:10.6047/j.issn.1000-8241.2011.02.003]
 Wang Yonghong,Li Xiaoping,Gong Jing.The application and futurity of long-distance pipeline on-line simulation system[J].Oil & Gas Storage and Transportation,2011,30(12):90.[doi:10.6047/j.issn.1000-8241.2011.02.003]
[4]郭晓瑛,路艳斌,郑娟.国内外长输管道 SCADA 系统标准现状[J].油气储运,2011,30(02):156.[doi:10.6047/j.issn.1000-8241.2011.02.021]
 Guo Xiaoying,Lu Yanbin,Zheng Juan.Technical status of long-distance pipeline SCADA system standards worldwide[J].Oil & Gas Storage and Transportation,2011,30(12):156.[doi:10.6047/j.issn.1000-8241.2011.02.021]
[5]杨莉,王从乐,姚玉萍,等.风城超稠油掺柴油长距离输送方法[J].油气储运,2011,30(10):768.[doi:10.6047/j.issn.1000-8241.2011.10.016]
 Yang Li,Wang Congle,Yao Yuping,et al.Long-distance transportation method for Fengcheng Ultra-heavy Oils blended with diesel[J].Oil & Gas Storage and Transportation,2011,30(12):768.[doi:10.6047/j.issn.1000-8241.2011.10.016]
[6]陈荣,陈晓勤.苏丹3/7区原油管道加剂运行安全经济评价[J].油气储运,2011,30(12):899.[doi:10.6047/j.issn.1000-8241.2011.12.006]
 Chen Rong and Chen Xiaoqin.Safety and economy evaluation of PPD-added oil pipeline in the 3/7 Block of Sudan[J].Oil & Gas Storage and Transportation,2011,30(12):899.[doi:10.6047/j.issn.1000-8241.2011.12.006]
[7]王洪超 石志国 许斌 王立坤 谭东杰 余东亮 熊敏.Hilbert-Huang 变换在管道泄漏监测系统中的应用[J].油气储运,2012,31(1):20.[doi:10.6047/j.issn.1000-8241.2012.01.005]
 Wang Hongchao,Shi Zhiguo,Xu Bin,et al.Application of Hilbert-Huang Transformation in pipeline leak detection system[J].Oil & Gas Storage and Transportation,2012,31(12):20.[doi:10.6047/j.issn.1000-8241.2012.01.005]
[8]许学瑞,帅健,肖伟生.滑坡多发区管道应变监测应变计安装方法[J].油气储运,2010,29(10):780.[doi:10.6047/j.issn.1000-8241.2010.10.017]
 Xu Xuerui,Shuai Jian,Xiao Weisheng.The Installation Method of Strain Gage Used to Monitor Pipeline Strain in Landslide-prone Areas[J].Oil & Gas Storage and Transportation,2010,29(12):780.[doi:10.6047/j.issn.1000-8241.2010.10.017]
[9]岳新民,唐智树,孙增武.管道试压的ASME标准和SNIP标准对比[J].油气储运,2010,29(12):925.[doi:10.6047/j.issn.1000-8241.2010.12.015]
 Yue Xinmin,Tang Zhishu,Sun Zengwu.Comparison of ASME Code and SNIP Standard About Pipeline Pressure Test[J].Oil & Gas Storage and Transportation,2010,29(12):925.[doi:10.6047/j.issn.1000-8241.2010.12.015]
[10]贾双英,王志刚,蒋尚达,等.长输管道工程预结算中其他费用的计算[J].油气储运,2010,29(8):601.[doi:DOI:10.6047/j.issn.1000-8241.2010.08.012]
 Jia Shuangying,Wang Zhigang,Jiang Shangda.Calculation on Other Costs in Pre-clearing of Long-distance Pipeline Project[J].Oil & Gas Storage and Transportation,2010,29(12):601.[doi:DOI:10.6047/j.issn.1000-8241.2010.08.012]

备注/Memo

基金项目:中国石油天然气集团公司重大科技专项“第三代大输 量天然气管道工程关键技术研究”,2012E-28。 作者简介:韩银杉,女,在读硕士生,1992 年生,2015 年毕业于中 国石油大学(北京)安全工程专业,现主要从事油气管道失效分析、 安全评价以及石油石化安全的研究工作。地址:北京市昌平区府 学路18 号中国石油大学(北京)研修大厦南楼919,102249。电话: 18810663369,Email:cathaya_han@163.com

更新日期/Last Update: 1900-01-01