膨胀珍珠岩填充施工是LNG 储罐建设后期的关键工序之一,其填充质量直接关系到储罐投产后的保冷效果。珍珠岩现场膨胀、填充设备主要包括原料仓、膨胀炉、旋风分离器、热交换器、集尘器、输送系统、振实器等。膨胀珍珠岩的填充工艺流程包括填充之前的准备工作、膨胀珍珠岩的填充、填充效果的检测以及填充后的振捣。LNG 储罐珍珠岩的膨胀、填充作业是不间断作业,在整个作业过程中需采用振实密度检测仪、粒度分析仪等对珍珠岩的松散密度、振实密度、粒度级配、含水率及导热系数进行定时检测并记录检验数据,依据检测结果调整珍珠岩膨胀工况,可有效确保投产后LNG 储罐整体BOG 蒸发率测试合格,避免储罐珍珠岩保冷作用减小或失效。
As a key procedure of LNG storage tank construction at late stages, perlite expansion & filling may directly determine insulation performances of such tanks after they are put into service. Major perlite expansion and filling facilities on site include silos for raw materials, expansion oven, cyclone separator, heat exchanger, dust catcher, conveyer system and vibrator. Main procedures for filling of expanded perlite include preparation, filling, monitoring of effects and vibrating after filling. Since the perlite expansion and filling for LNG storage tanks are operations around the clock, densimeters and particle size analyzers should be mobilized to monitor loose density, compacted density, granularity grading, moisture content and thermal conductivity of perlite throughout the operations. All relevant data obtained in such procedures should be recorded properly. These data may serve as the basis for adjusting the expansion process of perlite. In this way, BOG evaporation of the LNG storage tanks can be ensured to eliminate possibility of poor performance or failure in insulation of perlite in storage tank.
[1] 高明野,王震,范天晓. 清洁能源天然气市场现状及分析[J]. 天 然气与石油,2015,33(1):36-39. GAO M Y,WANG Z,FAN T X. Present situation of clomestic natural gas market and its analysis[J]. Natural Gas and Oil, 2015,33(1): 36-39.
[2] 宋武成. 天然气与中国能源[J]. 石油化工技术经济,2002, 17(1):7-9. SONG W C. Natural gas and energy in China[J]. Techno- Economics in Petrochemicals,2002,17(1):7-9.
[3] 袁中立,严伦江. LNG 低温储罐的设计及建造技术[J]. 石油工 程建设,2007,33(5):19-23. YUAN Z L,YAN L J. The design and construction technology of LNG low-temperature tank[J]. Petroleum Engineering Construction,2007,33(5):19-23.
[4] 张利希,陈慧芳. LNG 接受终端的工艺系统及设备[J]. 石油与 天然气化工,1999,28(3):163-166. ZHANG L X,CHEN H F. The process system and equipment of LNG receiving terminal[J]. Chemical Engineering of Oil & Gas, 1999,28(3):163-166.
[5] 王冰,陈学东,王国平. 大型低温LNG 储罐设计与建造技术的 新进展[J]. 天然气工业,2010,30(5):108-112. WANG B, CHEN X D, WANG G P. The new progress of design and construction technology for large sized LNG tank[J]. Natural Gas Industry,2010,30 (5):108-112.
[6] 吕娜娜,谢剑,杨建江. 大型LNG 储罐技术综述[J]. 特种结构, 2010,27(1):105-107. LYU N N,XIE J,YANG J J. The technology summary of large sized LNG tank[J]. Special Structure, 2010, 27(1):105-107.
[7] 秦凯凯,俞祖明. 50 000 m3 大型低温储罐膨胀珍珠岩填充技 术[J]. 安装,2009(12):39-41. QIN K K,YU Z M. Expanded perlite filling technique for 50 000 m3 low-temperature storage tank[J]. Installation, 2009(12): 39-41.
[8] 李海春,刘立冬. 膨胀珍珠岩制作和填充技术对绝热性能的影 响[J]. 深冷技术,2002(3):33-34 LI H C,LIU L D. Influence of production and filling technology of expanded perlite on its insulating performance[J]. Cryogenic Technology,2002(3):33-34.
[9] 崔福志. 中小型LNG 低温储罐珠光砂填充技术[J]. 中国化工 贸易,2015(12):91. CUI F Z. The filling technique of expanded perlite for middle and small low-temperature storage tank[J]. China Chemical Trade, 2015(12):91.
[10] 扬帆,张超,曲长龙. 大型LNG 储罐现场珍珠岩膨胀填充技 术[J]. 煤气与热力,2015,35(2):13-18. YANG F,ZHANG C,QU C L. Technology for on-site perlite expansion and filling of large LNG storage tank[J]. Gas & Heat,2015,32(2):13-18.
[11] 杜亮坡,郭磊,东志红,等. LNG 全容式储罐内珍珠岩侧压力计 算[J]. 石油化工设备,2013,42(6):47-49. DU L P,GUO L,DONG Z H,et al. Calculation perlite side pressure of liquefied natural gas full containment tank[J]. Petrochemical Equipment,2013,42(6):47-49.
[12] 李宏男,高指林,李建永. LNG 大型低温储罐膨胀珍珠岩填充 技术[J]. 深冷技术,2013,42(6):20-22. LI H N,GAO Z L,LI J Y. Expanded perlite filling technique for LNG large-sized low-temperature storage tank[J]. Cryogenic Technology,2013,42(6):20-22.
[1]管友海,贾娟娟,张如林,等.隔震LNG 储罐的地震响应及经济分析[J].油气储运,2015,34(8):854.[doi:10.6047/j.issn.1000-8241.2015.08.011]
GUAN Youhai,JIA Juanjuan,ZHANG Rulin,et al.Seismic response and economic analysis of shock-isolated LNG storage tank[J].Oil & Gas Storage and Transportation,2015,34(4):854.[doi:10.6047/j.issn.1000-8241.2015.08.011]
[2]程旭东,韩明一,彭文山,等.大型LNG储罐预应力钢筋张拉顺序[J].油气储运,2014,33(12):1359.[doi:10.6047/j.issn.1000-8241.2014.12.021]
CHENG Xudong,HAN Mingyi,PENG Wenshan,et al.Tensioning sequence of prestressed reinforcement for large LNG tank[J].Oil & Gas Storage and Transportation,2014,33(4):1359.[doi:10.6047/j.issn.1000-8241.2014.12.021]
[3]甄洁.LNG 储罐珍珠岩膨胀填充技术及施工质量的控制[J].油气储运,2016,35(预出版):1.
ZHEN Jie.Perlite expansion & filling technique for LNG storage tanks and relevant quality control[J].Oil & Gas Storage and Transportation,2016,35(4):1.
[4]张震,佟奕凡,章妍,等.大型全包容式LNG储罐冷却投用技术[J].油气储运,2016,35(2):183.[doi:10.6047/j.issn.1000-8241.2016.02.013]
ZHANG Zhen,TONG Yifan,ZHANG Yan,et al.Cooling and commissioning of large-scale full-containment LNG storage tanks[J].Oil & Gas Storage and Transportation,2016,35(4):183.[doi:10.6047/j.issn.1000-8241.2016.02.013]
[5]邵忠安,戴诗军.大型LNG储罐试桩设计方法的中欧规范差异[J].油气储运,2015,34(6):649.[doi:10.6047/j.issn.1000-8241.2015.06.018]
SHAO Zhongan,DAI Shijun.Differences between the codes in China and Europe on the piling test design method of large-scale LNG storage tank[J].Oil & Gas Storage and Transportation,2015,34(4):649.[doi:10.6047/j.issn.1000-8241.2015.06.018]
[6]曹学文,彭文山,王萍,等.大型LNG储罐罐壁隔热层保冷性能及其优化[J].油气储运,2016,35(4):369.[doi:10.6047/j.issn.1000-8241.2016.04.004]
CAO Xuewen,PENG Wenshan,WANG Ping,et al.Cold performances of insulation layers in large LNG storage tanks and its optimization[J].Oil & Gas Storage and Transportation,2016,35(4):369.[doi:10.6047/j.issn.1000-8241.2016.04.004]
[7]单彤文 张超 段品佳.LNG 储罐罐内管道与维修梯一体化结构的设计[J].油气储运,2018,37(预出版):1.
SHAN Tongwen,ZHANG Chao,DUAN Pinjia.Design of the integrated structure system for the pipeline and maintenance ladder inside LNG storage tank[J].Oil & Gas Storage and Transportation,2018,37(4):1.
[8]高健富 高炳军 靳达 李娜 宋晞明 傅建楠.LNG 储罐罐体结构及载荷的关联性[J].油气储运,2018,37(预出版):1.
GAO Jianfu,GAO Bingjun,JIN Da,et al.Relevance between structure and load of LNG storage tank[J].Oil & Gas Storage and Transportation,2018,37(4):1.
收稿日期:2015-11-6;改回日期:2016-1-28。
作者简介:甄洁,女,助理工程师,1986年生,2013年硕士毕业于东北石油大学油气储运专业,现主要从事LNG液化工厂建设工作。地址:山西省晋城市沁水县端氏镇晋城华港燃气集团有限公司沁水煤层气液化调峰储备中心,048203。电话:18635680727,Email:zhenjie201604@163.com