网站版权 © 《油气储运》编辑部 陕ICP备11014090号-10
地址:河北省廊坊市金光道51号(065000);电话:0316-2176193 / 0316-2072055; 传真:0316-2177392; 网址:yqcy.paperonce.org
技术支持:西安三才科技实业有限公司 029-89381847;029-88222991
?
[1]张增强,郑承震,高庭禹,等.SY/T 6233-2002 天然气管道试运投产规范[S].北京:石油工业出版社,2002.
[2]张鹏云.天然气管道投产置换过程模拟实验研究[J].西安石油大学学报(自然科学版),2006,21(6):49-52.
[3]薛继军.输气管道投产置换注氮量计算方法[J].天然气工业,2007,27(12):133-136.
[4]常兴,孙建国,汪春付,等.安济天然气长输管道置换投产方案的比选[J].油气储运,2007,26(4):59-61.
[5]孙兴祥,刘保侠,刘乃刚.长距离天然气管道投产置换技术研究 [J].油气储运,2004,23(4):48-51.
[6]孟军政,李银凯,石刚,等.浅谈天然气管道投产中气推气置换法[J].油气田地面工程,2008,27(10):46-47.
[1]孟庆萍.输气管道清管器非稳态运动模型[J].油气储运,2010,29(2):90.[doi:10.6047/j.issn.1000-8241.2010.02.003]
Meng Qingping.Unsteady State Motion Model of Pigs for Gas Transmission Pipelines[J].Oil & Gas Storage and Transportation,2010,29(04):90.[doi:10.6047/j.issn.1000-8241.2010.02.003]
[2]彭忍社 尹旭东 李庞. 输气管道法兰泄漏在线治理技术方案[J].油气储运,2012,31(12):917.[doi:10.6047/j.issn.1000-8241.2012.12.011]
Peng Renshe,Yin Xudong,Li Pang.Technical approach to on-line control of flange leakage of gas pipelines[J].Oil & Gas Storage and Transportation,2012,31(04):917.[doi:10.6047/j.issn.1000-8241.2012.12.011]
[3]谭桂斌,朱霄霄,张仕民,等.天然气管道调速清管器研究进展[J].油气储运,2011,30(06):411.[doi:10.6047/j.issn.1000-8241.2011.06.002]
Tan Guibin,Zhu Xiaoxiao,Zhang Shimin,et al.Study progress in variable speed pig for natural gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):411.[doi:10.6047/j.issn.1000-8241.2011.06.002]
[4]胡镁林,黄坤,吴晓南.基于D-S证据理论的天然气管道可靠性评价[J].油气储运,2011,30(07):490.[doi:10.6047/j.issn.1000-8241.2011.07.003]
Hu Meilin,Huang Kun,Wu Xiaonan.The gas pipeline reliability analysis based on D-S evidence theory[J].Oil & Gas Storage and Transportation,2011,30(04):490.[doi:10.6047/j.issn.1000-8241.2011.07.003]
[5]傅文奎,李霖,王尚林,等.天然气管道作业风险管理与预控措施[J].油气储运,2011,30(07):534.[doi:10.6047/j.issn.1000-8241.2011.07.016]
Fu Wenkui,Li Lin,Wang Shanglin,et al.Construction risk management and precontrol measures of natural gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):534.[doi:10.6047/j.issn.1000-8241.2011.07.016]
[6]郑晓明,王晓燕,闫杰,等.输气管道冻胀原因分析与治理[J].油气储运,2011,30(06):467.[doi:10.6047/j.issn.1000-8241.2011.06.018]
Zheng Xiaoming,Wang Xiaoyan,Yan Jie,et al.Freezing bulge analysis and countermeasures for gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):467.[doi:10.6047/j.issn.1000-8241.2011.06.018]
[7]康一龙,张人公,赖俊丞,等.番禺-惠州海底天然气管道真空干燥工艺[J].油气储运,2011,30(03):173.[doi:10.6047/j.issn.1000-8241.2011.03.004]
Kang Yilong,Zhang Rengong,Lai Juncheng,et al.Vacuum-drying technique applied in Panyu-Huizhou Submarine Gas Pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):173.[doi:10.6047/j.issn.1000-8241.2011.03.004]
[8]吕子文,李庆祥.中亚管道压缩机组运行控制模式的选择[J].油气储运,2011,30(02):111.[doi:10.6047/j.issn.1000-8241.2011.02.008]
Lv Ziwen and Li Qingxiang.Operation and control mode selection for compressor units in central Asia gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):111.[doi:10.6047/j.issn.1000-8241.2011.02.008]
[9]袁运栋,文剑,杨克瑞.清管作业冰堵问题与解决建议[J].油气储运,2011,30(02):154.[doi:10.6047/j.issn.1000-8241.2011.02.020]
Yuan Yundong,Wen Jian,Yang Kerui.Suggestions and solutions to the ice blockage problem in pigging operation[J].Oil & Gas Storage and Transportation,2011,30(04):154.[doi:10.6047/j.issn.1000-8241.2011.02.020]
[10]徐铁军.天然气管道压缩机组及其在国内的应用与发展[J].油气储运,2011,30(05):321.[doi:10.6047/j.issn.1000-8241.2011.05.001]
Xu Tiejun.Compressor unit and its application and development in inland nature gas pipelines[J].Oil & Gas Storage and Transportation,2011,30(04):321.[doi:10.6047/j.issn.1000-8241.2011.05.001]
刘建新,工程师,1982 年生,2008 年硕士毕业于中国石油大学(北京)控制理论与控制工程专业,现主要从事长输天然气管道的运行管理工作。
电话:15926726025;Email:liujianxin_ljx@126.com