[1]赵荣生.史密斯双向标准体积管控制系统的检修及调试[J].油气储运,1994,13(1):38-41.[doi:10.6047/j.issn.1000-8241.1994.01.010]
 Zhao Rong-sheng.Obverhaulling and Adjusting of Smith’s Bidirectional Standard Volume Tube Control System[J].Oil & Gas Storage and Transportation,1994,13(1):38-41.[doi:10.6047/j.issn.1000-8241.1994.01.010]
点击复制

史密斯双向标准体积管控制系统的检修及调试

相似文献/References:

[1]商同林,张树华.旋转容积式流量计在天然气计量中的应用[J].油气储运,2011,30(01):63.[doi:10.6047/j.issn.1000-8241.2011.01.017]
 Shang Tonglin and Zhang Shuhua.The application of rotational positive displacement flowmeter in natural gas metering[J].Oil & Gas Storage and Transportation,2011,30(1):63.[doi:10.6047/j.issn.1000-8241.2011.01.017]
[2]袁献忠,薛光,黄明军,等.天然气分输站的计量调压设计[J].油气储运,2011,30(07):528.[doi:10.6047/j.issn.1000-8241.2011.07.013]
 Yuan Xianzhong,Xue Guang,Huang Mingjun,et al.Metering and pressure regulating design of gas offtake station[J].Oil & Gas Storage and Transportation,2011,30(1):528.[doi:10.6047/j.issn.1000-8241.2011.07.013]
[3]王鹏,杜梦溪,匡远奇,等.北京油气调控中心运营水平测评体系[J].油气储运,2011,30(07):539.[doi:10.6047/j.issn.1000-8241.2011.07.018]
 Wang Peng,Du Mengxi,Kuang Yuanqi,et al.Assessment system of operation level for PetroChina Oil & Gas Pipeline Control Center of Beijing[J].Oil & Gas Storage and Transportation,2011,30(1):539.[doi:10.6047/j.issn.1000-8241.2011.07.018]
[4]邢辉 张荣旺.液化天然气船到港接卸流程与优化[J].油气储运,2012,31(5):381.[doi:10.6047/j.issn.1000-8241.2012.05.016]
 Xing Hui and Zhang Rongwang.Harbor unloading process and optimization of LNG ship[J].Oil & Gas Storage and Transportation,2012,31(1):381.[doi:10.6047/j.issn.1000-8241.2012.05.016]
[5]曲卫方.LPG罐车气相余压对装车计量的影响[J].油气储运,2009,28(12):54.[doi:10.6047/j.issn.1000-8241.2009.12.017]
 QU Weifang.Influencing of Vapor-phase Residual Pressure of LPG Tanker on Loading Metering[J].Oil & Gas Storage and Transportation,2009,28(1):54.[doi:10.6047/j.issn.1000-8241.2009.12.017]
[6]郭忠明,张绚,戴长胜,等.液化石油气定量装车计量误差分析及预防[J].油气储运,2009,28(1):54.[doi:10.6047/j.issn.1000-8241.2009.01.017]
 GUO Zhongming,ZHANG Xuan.Analysis on Meting Error of Quantitative Loading Technique of LPG and Error Removal[J].Oil & Gas Storage and Transportation,2009,28(1):54.[doi:10.6047/j.issn.1000-8241.2009.01.017]
[7]刘钦,宋庆维,申振宏.HGC-1型原油自动交接系统在卸油计量中的应用[J].油气储运,2007,26(5):43.[doi:10.6047/j.issn.1000-8241.2007.05.012]
 LIU Qin,SONG Qingwei.The Application of HGC-1 Crude Oil Custody Transfer System in Oil Unloading Metering of Oilfield[J].Oil & Gas Storage and Transportation,2007,26(1):43.[doi:10.6047/j.issn.1000-8241.2007.05.012]
[8]刘培军,郝建斌,曹水来.不均衡用气条件下天然气的计量分析[J].油气储运,2004,23(6):48.[doi:10.6047/j.issn.1000-8241.2004.06.015]
 LIU Peijun,HAO Jianbin.Gas Metering Analysis under the Unbalanced Gas Consumption Conditions[J].Oil & Gas Storage and Transportation,2004,23(1):48.[doi:10.6047/j.issn.1000-8241.2004.06.015]
[9]虞庆文.腰轮流量计在油品计量中的误差分析[J].油气储运,2004,23(3):48.[doi:10.6047/j.issn.1000-8241.2004.03.016]
 YU Qingwen.Error Analysis on Roots Flowmeter in Products Metering[J].Oil & Gas Storage and Transportation,2004,23(1):48.[doi:10.6047/j.issn.1000-8241.2004.03.016]
[10]郭忠明.液化石油气气相对罐内液相计量的影响[J].油气储运,2004,23(2):43.[doi:10.6047/j.issn.1000-8241.2004.02.016]
 GUO Zhongming.Loading and Unloading Process of LPG Influences the Metering Accuracy[J].Oil & Gas Storage and Transportation,2004,23(1):43.[doi:10.6047/j.issn.1000-8241.2004.02.016]
[11]张明.10万m3立式油罐容积的标定与分析[J].油气储运,1993,12(6):43.[doi:10.6047/j.issn.1000-8241.1993.06.014]
 Zhang Ming.Carlibration and Analysis of the Capacity of 10×1033 m3 Vertical Tanks[J].Oil & Gas Storage and Transportation,1993,12(1):43.[doi:10.6047/j.issn.1000-8241.1993.06.014]
[12]程达.如何提高体积管标准体积的准确性[J].油气储运,1990,9(5):56.[doi:10.6047/j.issn.1000-8241.1990.05.014]
 Cheng Da.How to Increase the Accuracy of Meter Prover[J].Oil & Gas Storage and Transportation,1990,9(1):56.[doi:10.6047/j.issn.1000-8241.1990.05.014]

备注/Memo

收稿日期:1993-11-12。
作者简介:赵荣生工程师,1956年生,1989年毕业于沈阳化工学院化工自动化及仪表专业,从事自动化仪表管理工作.

更新日期/Last Update: 1900-01-01