水网地区土壤含水量大,土质松软,极易发生沉降,管道在沉降作用下受到轴向载荷的作用,受拉伸载荷作用的环焊缝具有较高的失效风险。为保障管道的本质安全,针对水网地区直径1 422 mm X80管道,采用非线性有限元方法建立了突变型软土沉降下管道轴向应力应变数值计算模型,得到了最危险的突变型沉降工况下不同软土沉降位移对管道轴向载荷大小与分布的影响。在此基础上,采用BS 7910-2019《金属结构中缺陷可接受性评定方法导则》对软土沉降区不同位置管道焊缝的安全性进行评价,分析外部载荷条件及焊缝错边的影响,发现错边量增加将导致评估所用载荷比与韧性比增大,管道安全保守性降低。在临界断裂韧性CTOD值取现有准则0.25 mm的条件下,采用一级评估曲线,水网地区X80管道焊缝始终处于安全状态。若采用二级评估曲线,当临界断裂韧性CTOD值减小至0.08 mm,沉降位移取最大值1 m时,X80管道焊缝处于安全临界状态。
The water content of the soil in the water network area is large, the soil is soft, and settlement is easy. The pipeline is subjected to axial load under the action of settlement, and the girth weld under the action of tensile load has a higher risk of failure. In order to ensure the intrinsic safety of the pipeline, this study used a nonlinear finite element method to establish a numerical calculation model for the axial stress and strain of the pipeline under abrupt soft soil settlement for the 1422mm X80 pipeline in the water network area, and obtained the most dangerous abrupt settlement. The influence of the settlement displacement of different soft soils on the size and distribution of the axial load of the pipeline under different conditions. On this basis, the BS 7910-2019 Guide to methods for assessingthe acceptability of fl aws inmetallic structures was used to evaluate the safety of pipeline welds at different locations in the soft soil settlement area. Through the analysis of the influence of external load conditions and weld misalignment, the increase in the amount of misalignment leads to an increase in the load ratio and toughness ratio used in the evaluation, and the safety and conservativeness of the pipeline is reduced, but the critical crack tip opening displacement is taken as the existing standard 0.25mm Under the conditions, the first-level evaluation curve is adopted, and the welds of the X80 pipeline in the water network area are always in a safe state. If the second-level evaluation curve is used, when the critical crack tip opening displacement is reduced to 0.08mm and the settlement displacement takes the maximum value of 1m, the X80 pipeline weld is in a safe critical state.
[1]隋永莉,吴宏.我国长输油气管道自动焊技术应用现状及展望[J].油气储运,2014,33(9):913.[doi:10.6047/j.issn.1000-8241.2014.09.001]
SUI Yongli,WU Hong.Current and future applications of automatic welding technology for long-distance oil/gas pipeline in China[J].Oil & Gas Storage and Transportation,2014,33(10):913.[doi:10.6047/j.issn.1000-8241.2014.09.001]
[2]王婷,杨辉,冯庆善,等.油气管道环焊缝缺陷内检测技术现状与展望[J].油气储运,2015,34(7):694.[doi:10.6047/j.issn.1000-8241.2015.07.003]
WANG Ting,YANG Hui,FENG Qingshan,et al.Current status and prospect of inline inspection technologies for defects in girth weld of oil and gas pipeline[J].Oil & Gas Storage and Transportation,2015,34(10):694.[doi:10.6047/j.issn.1000-8241.2015.07.003]
[3]杨锋平 周秀红 崔祥 张杰 惠文颖 高继江.输油管道超设计压力运行的几个关键问题研究[J].油气储运,2016,35(预出版):1.
YANG Fengping,ZHOU Xiuhong,CUI Xiang,et al. Several key aspects in operation of oil pipelines at a pressure higher than design pressure[J].Oil & Gas Storage and Transportation,2016,35(10):1.
[4]杨锋平,周秀红,崔祥,等.输油管道超设计压力运行的几个关键问题研究[J].油气储运,2016,35(11):1250.[doi:10.6047/j.issn.1000-8241.2016.11.022]
YANG Fengping,ZHOU Xiuhong,CUI Xiang,et al.Several key aspects in operation of oil pipelines at a pressure higher than design pressure[J].Oil & Gas Storage and Transportation,2016,35(10):1250.[doi:10.6047/j.issn.1000-8241.2016.11.022]
[5]周亚薇 张振永.中俄东线天然气管道环焊缝断裂韧性设计[J].油气储运,2018,37(预出版):1.
ZHOU Yawei,ZHANG Zhenyong.The design for the fracture toughness of girth weld in Russia-China Eastern Gas Pipeline[J].Oil & Gas Storage and Transportation,2018,37(10):1.
[6]张振永 张文伟 周亚薇 薄国公.中俄东线OD 1 422 mm 埋地管道的断裂控制设计[J].油气储运,2017,36(预出版):1.
ZHANG Zhenyong,ZHANG Wenwei,ZHOU Yawei,et al.The fracture control design of the OD 1 422 mm buried pipeline in China-Russia Eastern Gas Pipeline[J].Oil & Gas Storage and Transportation,2017,36(10):1.
[7]张振永,张文伟,周亚薇,等.中俄东线OD 1 422 mm 埋地管道的断裂控制设计[J].油气储运,2017,36(9):1059.[doi:10.6047/j.issn.1000-8241.2017.09.013]
ZHANG Zhenyong,ZHANG Wenwei,ZHOU Yawei,et al.The fracture control design of the OD 1 422 mm buried pipeline in
China-Russia Eastern Gas Pipeline[J].Oil & Gas Storage and Transportation,2017,36(10):1059.[doi:10.6047/j.issn.1000-8241.2017.09.013]
[8]帅健,孔令圳.高钢级管道环焊缝应变能力评价[J].油气储运,2017,36(12):1368.[doi:10.6047/j.issn.1000-8241.2017.12.004]
SHUAI Jian,KONG Lingzhen.Evaluation on strain capacity of girth welds in high-grade pipelines[J].Oil & Gas Storage and Transportation,2017,36(10):1368.[doi:10.6047/j.issn.1000-8241.2017.12.004]
[9]周亚薇,张振永.中俄东线天然气管道环焊缝断裂韧性设计[J].油气储运,2018,37(10):1174.[doi:10.6047/j.issn.1000-8241.2018.10.015]
ZHOU Yawei,ZHANG Zhenyong.The design for the fracture toughness of girth weld in China-Russia
Eastern Gas Pipeline[J].Oil & Gas Storage and Transportation,2018,37(10):1174.[doi:10.6047/j.issn.1000-8241.2018.10.015]
[10]吕新昱 高媛 刘全利 薛岩 李新文 肖健 刘宝强 李维.中俄东线天然气管道AUT检测技术质量控制及管理[J].油气储运,2020,39(中俄东线):1.[doi:10.6047/j.issn.1000-8241.2020.00.000]
LYU Xinyu,GAO Yuan,LIU Quanli,et al.Quality control and management of AUT technology for China-Russia Eastern Gas Pipeline [J].Oil & Gas Storage and Transportation,2020,39(10):1.[doi:10.6047/j.issn.1000-8241.2020.00.000]