[1]彭延建 张超 肖立.LNG 卸料管道穿堤布置方案的设计[J].油气储运,2016,35(预出版):1-5.
 PENG Yanjian,ZHANG Chao,XIAO Li.Design on the arrangement program of LNG unloading pipeline crossing seawall[J].Oil & Gas Storage and Transportation,2016,35(预出版):1-5.
点击复制

LNG 卸料管道穿堤布置方案的设计

相似文献/References:

[1]贾保印 白改玲.大气压变化对蒸发气压缩机处理能力的影响[J].油气储运,2016,35(预出版):1.
 JIA Baoyin,BAI Gailing.Impacts of changes in atmospheric pressure to processing capacity of BOG compressor[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[2]曹学文 吉俊毅 杨文.LNG 卸料管道氮气预冷温度分布规律[J].油气储运,2016,35(预出版):1.
 CAO Xuewen,JI Junyi,YANG Wen.Temperature distribution of LNG unloading pipelines during nitrogen pre-cooling[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[3]王赟,贺三,战永辉,等.移动式小型BOG增压再液化装置功耗的模拟计算[J].油气储运,2015,34(6):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
 WANG Yun,HE San,ZHAN Yonghui,et al.Simulated calculation of power consumption of the mobile small-scale BOG compression and reliquefaction plant[J].Oil & Gas Storage and Transportation,2015,34(预出版):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
[4]薛倩 刘名瑞 肖文涛 王晓霖 张久久.LNG 接收站 BOG 处理工艺优化及能耗分析[J].油气储运,2016,35(预出版):1.
 XUE Qian,LIU Mingrui,XIAO Wentao,et al.Optimization and energy consumption analysis of BOG treatment processes in LNG terminal[J].Oil & Gas Storage and Transportation,2016,35(预出版):1.
[5]薛倩,刘名瑞,肖文涛,等.LNG接收站BOG处理工艺优化及功耗分析[J].油气储运,2016,35(4):376.[doi:10.6047/j.issn.1000-8241.2016.04.005]
 XUE Qian,LIU Mingrui,XIAO Wentao,et al.Optimization and energy consumption analysis of BOG treatment processes in LNG terminal[J].Oil & Gas Storage and Transportation,2016,35(预出版):376.[doi:10.6047/j.issn.1000-8241.2016.04.005]
[6]曹学文,吉俊毅,杨文.LNG卸料管道氮气预冷温度分布规律[J].油气储运,2016,35(5):492.[doi:10.6047/j.issn.1000-8241.2016.05.008]
 CAO Xuewen,JI Junyi,YANG Wen.Temperature distribution of LNG unloading pipelines during nitrogen pre-cooling[J].Oil & Gas Storage and Transportation,2016,35(预出版):492.[doi:10.6047/j.issn.1000-8241.2016.05.008]
[7]周怀发 申永亮 张兴 刘铭刚.基于层次分析与集对分析法的LNG 槽车区风险评价[J].油气储运,2019,38(预出版):1.
 ZHOU Huaifa,SHEN Yongliang,ZHANG Xing,et al.Risk assessment on LNG tanker loading region based on analytical hierarchy process and set pair analysis theory[J].Oil & Gas Storage and Transportation,2019,38(预出版):1.
[8]徐波 段林杰 戴梦 李妍 闫锋 胡森.LNG 全运输系统运行可靠度计算方法[J].油气储运,2020,39(01):48.[doi:10.6047/j.issn.1000-8241.2020.01.007]
 XU Bo,DUAN Linjie,DAI Meng,et al.A calculation method for the operation reliability of LNG whole transportation system[J].Oil & Gas Storage and Transportation,2020,39(预出版):48.[doi:10.6047/j.issn.1000-8241.2020.01.007]
[9]远双杰 孟凡鹏 安云朋 董平省 孙立刚 崔亚梅 张效铭.LNG 接收站工程中外输首站的设计探讨及优化[J].油气储运,2020,39(10):1.[doi:10.6047/j.issn.1000-8241.2020.10.014]
 YUAN Shuangjie,MENG Fanpeng,AN Yunpeng,et al.Discussion and optimization of the design of the initial transportationstation in LNG receiving terminal project[J].Oil & Gas Storage and Transportation,2020,39(预出版):1.[doi:10.6047/j.issn.1000-8241.2020.10.014]
[10]彭延建,张超,肖立.LNG卸料管道穿堤布置方案的设计[J].油气储运,2016,35(4):412.[doi:10.6047/j.issn.1000-8241.2016.04.012]
 PENG Yanjian,ZHANG Chao,XIAO Li.Design on the arrangement program of LNG unloading pipeline crossing seawall[J].Oil & Gas Storage and Transportation,2016,35(预出版):412.[doi:10.6047/j.issn.1000-8241.2016.04.012]

更新日期/Last Update: 2016-02-29