[1]李明 宫敬 李清平. 海洋立管系统严重段塞流数学模型[J].油气储运,2013,32(5):462-468.[doi:10.6047/j.issn.1000-8241.2013.05.002]
 Li Ming,Gong Jing,Li Qingping. Mathematical model of severe slug flow in submarine riser system[J].Oil & Gas Storage and Transportation,2013,32(5):462-468.[doi:10.6047/j.issn.1000-8241.2013.05.002]
点击复制

 海洋立管系统严重段塞流数学模型

参考文献/References:

[1] Schmidt Z,Brill J P,Beggs H D. Experimental study of severe slugging in a two-phase-flow pipeline-riser pipe system[J]. SPE
Journal,1980,20:407-414.
[2] Schmidt Z,Doty D R,Dutta-Roy K. Severe slugging flow in offshore pipeline riser-pipe systems[J]. SPE Journal,1985,25:
27-38.
[3] Taitel Y,Vierkant S,Shoham O,et al. Severe slugging in a pipeline-riser system, experiments and modeling[J]. Int J Multiphase Flow,1990,16:57-68.
[4] Sarica Cem. Two-phase flow in low-velocity hilly terrain pipelines[D]. Tower Ohio:The University of Tulsa, 1990.
[5] Sarica C,Shoham O. A simplified transient model for pipelineriser systems[J]. Chemical Engineering Science,1991,46(9):2 167-2 179.
[6] Sagatun S I. Riser slugging:A mathematical model and the practical consequences[J]. SPE Production & Facilities,2004,19(3):168-173.
[7] 王鑫,郭烈锦. 集输管路上升管系统严重段塞流实验和理论模拟[J]. 工程热物理学报,2006,27(4): 611-614.
[8] 刘淼儿,李清平,安维杰,等. 立管系统中严重段塞流的一维瞬态模型[J]. 中国海上油气,2007,19(2):125-130.
[9] 刘淼儿,安维杰,宫敬,等. 多相混输立管系统的流固耦合研究[D]. 北京:中国石油大学(北京),2006.
[10] 李明,宫敬,李清平,等. 海洋石油开发中的立管段塞研究[J].中国科技论文在线,2008-01-25. http://www.paper.edu.cn/releasepaper/content/200801-730.
[11] 李清平,李明,宫敬. 海洋石油开发中的立管段塞模型研究[C]. 2008 年中国工程热物理学会多相流学术会议,中国青岛,9 月28 日,2008.
[12] 李明. 海底立管系统流固耦合动态特性研究[D]. 北京:中国石油大学( 北京),2010.

相似文献/References:

[1]李明,宫敬,李清平.气液两相流管道流固耦合问题[J].油气储运,2010,29(4):245.[doi:10.6047/j.issn.1000-8241.2010.04.002]
 Li Ming,Gong Jing,Li Qingping.Liquid-solid Coupling Problem in Gas-liquid Two-phase Flow Pipelines[J].Oil & Gas Storage and Transportation,2010,29(5):245.[doi:10.6047/j.issn.1000-8241.2010.04.002]
[2]张强 邓道明 董勇 涂多运 吴海浩 宫敬.海洋L 形立管系统不稳定流简化计算模型[J].油气储运,2014,33(1):95.[doi:10.6047/j.issn.1000-8241.2014.01.020]
 ZHANG Qiang,DENG Daoming,DONG Yong,et al.ZHANG Qiang1,2, DENG Daoming1, DONG Yong1,3, TU Duoyun1,3, WU Haihao1, GONG Jing1[J].Oil & Gas Storage and Transportation,2014,33(5):95.[doi:10.6047/j.issn.1000-8241.2014.01.020]
[3]程兵 李彦辉 李清平 陈绍凯.海洋石油多相流立管严重段塞流控制方法[J].油气储运,2013,32(12):1285.[doi:10.6047/j.issn.1000-8241.2013.12.006]
 Cheng Bing,Li Yanhui,Li Qingping,et al.Control method of severe slug flow in riser of offshore oil multiphase flow[J].Oil & Gas Storage and Transportation,2013,32(5):1285.[doi:10.6047/j.issn.1000-8241.2013.12.006]
[4]马亮,王平,朱琰.立管严重段塞流的一维数值计算与试验对比[J].油气储运,2017,36(3):335.[doi:10.6047/j.issn.1000-8241.2017.03.017]
 MA Liang,WANG Ping,ZHU Yan.One dimensional numerical calculation and experimental comparison of severe slug flow in marine riser[J].Oil & Gas Storage and Transportation,2017,36(5):335.[doi:10.6047/j.issn.1000-8241.2017.03.017]
[5]杨晓宇 陈泷 宫敬 于达 虞维超.海洋L形立管系统底部连续气举水力模型[J].油气储运,2018,37(5):1.
 YANG Xiaoyu,CHEN Long,GONG Jing,et al.Hydraulic model for the continuous gas lift at the bottom of L-type marine riser system[J].Oil & Gas Storage and Transportation,2018,37(5):1.
[6]李长俊,吴畏,张黎.渤西油田严重段塞流控制措施数值模拟[J].油气储运,2018,37(1):95.[doi:10.6047/j.issn.1000-8241.2018.01.018]
 LI Changjun,WU Wei,ZHANG Li.Numerical simulation on control measures of severe slug flow in Boxi Oilfield[J].Oil & Gas Storage and Transportation,2018,37(5):95.[doi:10.6047/j.issn.1000-8241.2018.01.018]
[7]杨晓宇,陈泷,宫敬,等.海洋L 形立管系统底部连续气举水力模型[J].油气储运,2018,37(9):1056.[doi:10.6047/j.issn.1000-8241.2018.09.016]
 YANG Xiaoyu,CHEN Long,GONG Jing,et al.Hydraulic model for the continuous gas lift at the bottom of L-type marine riser system[J].Oil & Gas Storage and Transportation,2018,37(5):1056.[doi:10.6047/j.issn.1000-8241.2018.09.016]
[8]张西迎,李乃良,陈冰清.文昌油田集输-S 形立管内严重段塞流的分析与控制[J].油气储运,2019,38(04):472.[doi:10.6047/j.issn.1000-8241.2019.04.020]
 ZHANG Xiying,LI Nailiang,CHEN Bingqing.Analysis and treatment on the severe slug flow in pipeline S-shaped riser of Wenchang Oilfield[J].Oil & Gas Storage and Transportation,2019,38(5):472.[doi:10.6047/j.issn.1000-8241.2019.04.020]

备注/Memo

基金项目:高等学校博士学科点专项科研基金资助项目“海底混输管道立管系统流固耦合研究”,20070425005。
李明,工程师,1980 年生,2010 年博士毕业于中国石油大学(北京)油气储运专业,现主要从事油气储运相关领域的工程设
计与研究工作。电话:13811595561;Email:mingli16@163.com(收稿日期:2013-01-23;编辑:关中原)

更新日期/Last Update: 2013-06-05