[1]蔡亮学 何利民 吕宇玲 王丙奎 于德军.水平定向钻回拖载荷预测模型[J].油气储运,2012,31(2):147-151.[doi:10.6047/j.issn.1000-8241.2012.02.018]
 Cai Liaoxue,He Limin,Lv Yuling,et al.Prediction model of backtow loads in horizontal directional drilling installation[J].Oil & Gas Storage and Transportation,2012,31(2):147-151.[doi:10.6047/j.issn.1000-8241.2012.02.018]
点击复制

水平定向钻回拖载荷预测模型

参考文献/References:

[1] Phillips Driscopipe Inc. Technical expertise application of driscopipe in directional drilling and river crossings,Technical
Note No. 41[R].1993.
[2] DrillpathTM. Drillpath theory and user’s manual[C]. Infrasoft L L C,Houston,Texas,USA. 1996.
[3] Huey D P,Hair J D,Mcleod K B. Installation loading and stress analysis involved with pipelines installed in horizontal directional
drilling: International No-dig 1996 Conf,New Orleans,Mar 31-Apr 3,1996[C]. North American Society for Trenchless Technology,Chicago,USA,1996.
[4] Baumert M E. Experimental investigation of pulling loads and mud pressures during horizontal directional drilling installations
[D]. London:The University of Western Ontario, 2003.
[5] ASTM F 1962-05 Standard guide for the use of maxi-horizontal directional drilling for placement of polyethylene pipe or conduit under obstacles,including river crossings[S]. 2005.
[6] Polak M A,Lasheen A. Mechanical modeling for pipes in horizontal directional drilling[J]. Tunnelling and Underground
Space Technology,2002,16(Suppl 1):47-55.
[7] Puckett J S. Analysis of theoretical versus actual HDD pulling ?loads[C]. Proc. of International Conference on Pipeline
Engineering and Construction,Baltimore,Maryland,2003.
[8] Francis M,Kwong J,Kalani J,et al. Comparison of calculated and observed pipeline pullback forces during horizontal directional
drilling[C]. NASTT No-Dig,New Orleans,Louisiana,2004.
[9] 续理,魏国昌,石忠,等. GB50424-2007 油气输送管道穿越工程施工规范[S]. 北京:中国计划出版社,2008.
[10] 闫相祯,丁鹏,杨秀娟,等. 长距离复杂地层水平定向钻穿越管道施工技术[J]. 油气储运,2007,26(2):55-58.
[11] 刘刚,徐舟,罗京新,等. 定向钻穿越回拖管道径向变形原因分析[J]. 油气储运,2008,27(2):60-61.
[12] Cheng E,Polak M A. Theoretical model for calculating pulling loads for pipes in horizontal directional drilling[J]. Tunnelling
and Underground Space Technology,2007,22:633-643.
[13] Chehab A G. Time dependent response of pulled-in-place HDPE pipes[D]. Kingston:Queen’s University,2008.
[14] Hair J D. Coating requirements for pipelines installed by
horizontal directional drilling[C]. Proc of the Pipelines Conference ASCE,Cleveland,Ohio,2002.
[15] Duyvestyn G. Comparison of predicted and observed HDD installation loads for various calculation methods[C]. ISTT No-
Dig, Toronto,ON,2009.
[16] Ariaratnam S T,Harbin B C,Stauber R L. Modeling of annular fluid pressures in horizontal boring[J]. Tunnelling and
Underground Space Technology,2007,22:610-619.
[17] Polak M A. Analysis of polyethylene pipe behavior in horizontal directional drilling field tests[J]. Canadian Journal of Civil
Engineering,2005,31:665-677.
[18] Ariaratnam S T,Stauber R M,Bell J,et al. Evaluation of rheologic properties of fluids returns from horizontal directional
drilling[C]. NASTT/ISTT No-Dig,Arlington,2003.

相似文献/References:

[1]张杰,周朝霞,叶文建,等.回拖浮力平衡技术在水平定向钻工程中的应用[J].油气储运,2011,30(08):619.[doi:10.6047/j.issn.1000-8241.2011.08.005]
 Zhang Jie,Zhou Zhaoxia,Ye Wenjian,et al.Application of backtow flotage balance technology in horizontal directional drilling engineering[J].Oil & Gas Storage and Transportation,2011,30(2):619.[doi:10.6047/j.issn.1000-8241.2011.08.005]
[2]李国辉,马晓成.管道水平定向钻穿越夯套管结构计算[J].油气储运,2011,30(11):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
 Li Guohui and Ma Xiaocheng.Structural computation of pounding casing in crossing project with horizontal directional drilling method[J].Oil & Gas Storage and Transportation,2011,30(2):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
[3]邓彦.岙山—镇海原油管道册子水道定向钻穿越技术[J].油气储运,2008,27(1):55.[doi:DOI:10.6047/j.issn.1000-8241.2008.01.016]
 DENG Yan.Cezi Waterway Horizontal Directional Drilling Practice for Aoshan-Zhenhai Import Oil Pipeline Construction Project[J].Oil & Gas Storage and Transportation,2008,27(2):55.[doi:DOI:10.6047/j.issn.1000-8241.2008.01.016]
[4]汪春付,常兴,杨艳军,等.齐青管道定向钻穿越铁路的方案设计与施工[J].油气储运,2004,23(3):46.[doi:10.6047/j.issn.1000-8241.2004.03.015]
 WANG Chunfu,CHANG Xing.Scenario Design and Construction for Railway Crossing with Horizontal Directional Drilling Technique in Qilu Sinopec-Qingdao Gas Pipeline[J].Oil & Gas Storage and Transportation,2004,23(2):46.[doi:10.6047/j.issn.1000-8241.2004.03.015]
[5]朱波,吕建峰,张永高.管道水平定向钻穿越技术的特征分析[J].油气储运,2005,24(3):51.[doi:10.6047/j.issn.1000-8241.2005.03.016]
 ZHU Bo,LV Jianfeng.Characteristic Analysis on Huaihe River Pipeline Crossing by Horizontal Directional Drilling Technology[J].Oil & Gas Storage and Transportation,2005,24(2):51.[doi:10.6047/j.issn.1000-8241.2005.03.016]
[6]郑承虎.水平定向钻穿越尼罗河可行性分析[J].油气储运,1999,18(5):50.[doi:DOI:10.6047/j.issn.1000-8241.1999.05.017]
 Zheng Chenghu.Feasibility Analysis of Horizontal Direction Drill Passing through Nile[J].Oil & Gas Storage and Transportation,1999,18(2):50.[doi:DOI:10.6047/j.issn.1000-8241.1999.05.017]
[7]张宝强 焦如义 袁会赞 张倩 刘艳利.大口径长输油气管道非开挖穿越的适应性[J].油气储运,2012,31(11):871.[doi:10.6047/j.issn.1000-8241.2012.11.019]
 Zhang Baoqiang,Jiao Ruyi,Yuan Huizan,et al.Adaptability of trenchless crossing for large-diameter long-distance oil and gas pipeline[J].Oil & Gas Storage and Transportation,2012,31(2):871.[doi:10.6047/j.issn.1000-8241.2012.11.019]
[8]冯少广 李荣光 王文荣 任文静 张鑫 李睿 赵云峰 赵国星.定向钻穿越3PE 防腐层碳纤维复合材料防护技术[J].油气储运,2013,32(1):47.[doi:10.6047/j.issn.1000-8241.2013.01.011]
 Feng Shaoguang,Li Rongguang,Wang Wenrong,et al.3PE carbon fiber composite material protection technology in directional drilling project[J].Oil & Gas Storage and Transportation,2013,32(2):47.[doi:10.6047/j.issn.1000-8241.2013.01.011]
[9]肖守金 刘永松 武尚. 水平定向钻铺管过程中回拖力计算方法的改进[J].油气储运,2013,32(3):309.[doi:10.6047/j.issn.1000-8241.2013.03.018]
 Xiao Shoujin,Liu Yongsong,Wu Shang.Calculation method improvement for the backtow force in pipelaying process of horizontal directional drilling crossing[J].Oil & Gas Storage and Transportation,2013,32(2):309.[doi:10.6047/j.issn.1000-8241.2013.03.018]
[10]霍峰 王玮 张文瑞 刘睿 卢哲 赵敏.定向钻穿越管道外涂层应用现状与发展趋势[J].油气储运,2013,32(9):943.[doi:10.6047/j.issn.1000-8241.2013.09.003]
 Huo Feng,Wang Wei,Zhang Wenrui,et al.Application status of external coating of pipeline and its development trend in HDD project[J].Oil & Gas Storage and Transportation,2013,32(2):943.[doi:10.6047/j.issn.1000-8241.2013.09.003]
[11]蔡亮学,何利民,吕宇玲,等.水平定向钻管道穿越孔底泥浆的力学特性[J].油气储运,2011,30(01):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
 Cai Liangxue,He Limin,Lv Yuling,et al.Hole-bottom slurry mechanical properties of horizontal directional drilling in pipeline crossing project[J].Oil & Gas Storage and Transportation,2011,30(2):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]

备注/Memo

基金项目:中国石油大学研究生创新基金项目“水平定向钻管道穿越回拖过程动态力学特性研究”,BZ10-10。
作者简介:蔡亮学,讲师,1984 年生,2011 年毕业于中国石油大学(华东)油气储运工程专业,现主要从事油气管道非开挖敷设技术
研究。电话:15969856361;Email:cailiangxue-184@163.com.(收稿日期:2011-04-18;编辑:潘红丽)

更新日期/Last Update: