[1]蔡亮学,何利民,吕宇玲,等.水平定向钻管道穿越孔底泥浆的力学特性[J].油气储运,2011,30(01):25-029.[doi:10.6047/j.issn.1000-8241.2011.01.007]
 Cai Liangxue,He Limin,Lv Yuling,et al.Hole-bottom slurry mechanical properties of horizontal directional drilling in pipeline crossing project[J].Oil & Gas Storage and Transportation,2011,30(01):25-029.[doi:10.6047/j.issn.1000-8241.2011.01.007]
点击复制

水平定向钻管道穿越孔底泥浆的力学特性

参考文献/References:

[1] Mohammad N,Sanjiv G.Trenchless technology:pipeline and utility design,construction,and renewal[M].New York:McGraw-Hill Professional,2004:247-248.
[2]何宜章.2006年中国非开挖行业市场调查[J].非开挖技术,2007,24(2):1-6.
[3]Francis M,Kwong J,Kalani J,et al.Comparison of calculated andobserved pipeline pullback forces during horizontal directional drilling[C].NASTT No-Dig, New Orleans,Louisiana 2004.
[4]闫相祯,丁鹏,杨秀娟,等.长距离复杂地层水平定向钻穿越管道施工技术[J].油气储运,2007,26(2):55-58.
[5]Chin W C.Computational rheology for pipeline and annular flow[M]. Boston: Gulf Professional,2001:37-67.
[6]Duyvestyn G.Comparison of predicted and observed HDD installation loads for various calculation methods[C]. ISTT No-Dig,Toronto,Canada,2009.
[7]Polak M A,Lasheen A.Mechanical modeling for pipes in horizontal directional drilling[J].Tunnelling and Underground??Space Technology,2002,16(Suppl.1):47-55.
[8]Knight M A,Duyvestyn G M,Polak M A.Horizontal directional drilling installation loads on polyethylene pipes[C].ISTT No-Dig,Brisbane,Australia,2006.




相似文献/References:

[1]曾忠刚 温秀荷 索杏兰 孔军 姜敏 陈凯 赵庆兵 曾朗峻.塔河凝析油管道结蜡计算[J].油气储运,2012,31(8):622.[doi:10.6047/j.issn.1000-8241.2012.08.018]
 Zeng Zhongang,Wen Xiuhe,Suo Xinglan,et al.Wax deposition calculation for Tahe Condensate Pipeline[J].Oil & Gas Storage and Transportation,2012,31(01):622.[doi:10.6047/j.issn.1000-8241.2012.08.018]
[2]夏文鹤 茹黎南 李明 曹谢东.基于卫星物联网技术的油气管道远程监控[J].油气储运,2012,31(12):898.[doi:10.6047/j.issn.1000-8241.2012.12.006]
 Xia Wenhe,Ru Linan,Li Ming,et al. Remote monitoring on oil and gas pipelines with satellite Internet of Things network[J].Oil & Gas Storage and Transportation,2012,31(01):898.[doi:10.6047/j.issn.1000-8241.2012.12.006]
[3]董绍华 韩忠晨 杨毅 曹兴.物联网技术在管道完整性管理中的应用[J].油气储运,2012,31(12):906.[doi:10.6047/j.issn.1000-8241.2012.12.008]
 Dong Shaohua,Han Zhongchen,Yang Yi,et al.The application of Internet of Things technology in the integrity management of pipeline[J].Oil & Gas Storage and Transportation,2012,31(01):906.[doi:10.6047/j.issn.1000-8241.2012.12.008]
[4]李睿,侯宇,刘淑聪,等.锚纹特征对管道外防腐环氧涂层附着力的影响[J].油气储运,2011,30(05):355.[doi:10.6047/j.issn.1000-8241.2011.05.010]
 Li Rui,Hou Yu,Li Jingmiao,et al.Impact of pattern on the adhesion of pipe external epoxy coating[J].Oil & Gas Storage and Transportation,2011,30(01):355.[doi:10.6047/j.issn.1000-8241.2011.05.010]
[5]段纪淼,宫敬,张宇,等.多相混输管道蜡沉积研究进展[J].油气储运,2011,30(04):241.[doi:10.6047/j.issn.1000-8241.2011.04.001]
 Duan Jimiao,Gong Jing,Zhang Yu,et al.Research progress of wax deposition in multiphase mixed transmission pipeline[J].Oil & Gas Storage and Transportation,2011,30(01):241.[doi:10.6047/j.issn.1000-8241.2011.04.001]
[6]宋晓琴,刘广文,王雯娟.管道油品泄漏原因及其对环境的影响[J].油气储运,2011,30(04):297.[doi:10.6047/j.issn.1000-8241.2011.04.016]
 Song Xiaoqin,Liu Guangwen,Wang Wenjuan. The influence of oil pipeline leakage on environmental pollution [J].Oil & Gas Storage and Transportation,2011,30(01):297.[doi:10.6047/j.issn.1000-8241.2011.04.016]
[7]樊三新,刘玉玲,楚威威.高寒地区管道低温水试压方法[J].油气储运,2011,30(01):73.[doi:10.6047/j.issn.1000-8241.2011.01.020]
 Fan Sanxin,Liu Yuling,Chu Weiwei.Pipeline hydrotest method of cold water in frigid zone[J].Oil & Gas Storage and Transportation,2011,30(01):73.[doi:10.6047/j.issn.1000-8241.2011.01.020]
[8]杜明俊,张振庭,张朝阳,等.多相混输管道90°弯管冲蚀破坏应力分析[J].油气储运,2011,30(06):427.[doi:10.6047/j.issn.1000-8241.2011.06.006]
 Du Mingjun,Chao Ling,Fu Xiaodong,et al.Analysis of erosion fracture stress of 90° elbow in multi-phase mixed transmission pipeline[J].Oil & Gas Storage and Transportation,2011,30(01):427.[doi:10.6047/j.issn.1000-8241.2011.06.006]
[9]高河东,祁志江,任金岭,等.川气东送管道野三河跨越方案比选与实施[J].油气储运,2011,30(06):445.[doi:10.6047/j.issn.1000-8241.2011.06.011]
 Gao Hedong,Qi Zhijiang,Ren Jinling,et al.Programs comparison and construction of the Yesanhe River Overhead Crossing NG Project of Sichuan-to-East Gas Pipeline[J].Oil & Gas Storage and Transportation,2011,30(01):445.[doi:10.6047/j.issn.1000-8241.2011.06.011]
[10]王其磊,程五一,张丽丽,等.管道量化风险评价技术与应用实例[J].油气储运,2011,30(07):494.[doi:10.6047/j.issn.1000-8241.2011.07.004]
 Wang Qilei,Cheng Wuyi,Zhang Lili,et al.Quantifying risk assessment technique and case analysis of pipeline[J].Oil & Gas Storage and Transportation,2011,30(01):494.[doi:10.6047/j.issn.1000-8241.2011.07.004]
[11]王志伦,董红军,杨威,等.管道穿越江底隧道安全风险识别与施工管理[J].油气储运,2011,30(08):670.[doi:10.6047/j.issn.1000-8241.2011.08.019]
 Wang Zhilun,Dong Hongjun,Yang Wei,et al.Safety risk identification and construction management of pipeline crossing in river tunnel[J].Oil & Gas Storage and Transportation,2011,30(01):670.[doi:10.6047/j.issn.1000-8241.2011.08.019]
[12]李国辉,马晓成.管道水平定向钻穿越夯套管结构计算[J].油气储运,2011,30(11):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
 Li Guohui and Ma Xiaocheng.Structural computation of pounding casing in crossing project with horizontal directional drilling method[J].Oil & Gas Storage and Transportation,2011,30(01):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
[13]闫相祯,丁鹏,杨秀娟,等.长距离复杂地层水平定向钻穿越管道施工技术[J].油气储运,2007,26(2):55.[doi:10.6047/j.issn.1000-8241.2007.02.009]
 YAN Xiangzhen,DING Peng.Construction Technology Study on Long-distance and Complex Stratum Project by Horizontal Directional Drilling[J].Oil & Gas Storage and Transportation,2007,26(01):55.[doi:10.6047/j.issn.1000-8241.2007.02.009]
[14]康新生,陈雪华.长江穿越工程施工组织与管理[J].油气储运,2004,23(2):19.[doi:DOI:10.6047/j.issn.1000-8241.2004.02.007]
 KANG Xinsheng,CHEN Xuehua.Construction Organization and Management on Horizontal Directional Drilling Engineering for West-to-East Gas Pipeline Project in Yangtze River[J].Oil & Gas Storage and Transportation,2004,23(01):19.[doi:DOI:10.6047/j.issn.1000-8241.2004.02.007]
[15]李长阁.沉井在管道穿越施工中的应用[J].油气储运,2003,22(7):34.[doi:DOI:10.6047/j.issn.1000-8241.2003.07.010]
 LI Changge.The Application of Caisson in Pipeline Crossing Construction[J].Oil & Gas Storage and Transportation,2003,22(01):34.[doi:DOI:10.6047/j.issn.1000-8241.2003.07.010]
[16]邵景林.大中型河流管道穿越工程地质勘察方案的选择[J].油气储运,1997,16(9):29.[doi:10.6047/j.issn.1000-8241.1997.09.008]
 Shao Jinglin.The Plan Selection of Engineering Geological Investigations for Pipeline River Crossing[J].Oil & Gas Storage and Transportation,1997,16(01):29.[doi:10.6047/j.issn.1000-8241.1997.09.008]

备注/Memo

作者简介:蔡亮学,在读博士生,1984 年生,2006 年毕业于中国石油大学(华东)油气储运工程专业,现主要从事油气管道水平定向钻
敷设技术研究。电话:15969856361;Email:cailiangxue-184@163.com

更新日期/Last Update: