[1]赵君 刘春亮 徐华天 刘国豪 杨淼 张一峰 王建伟.试片断电电位测量方法及影响因素[J].油气储运,2020,39(04):441-445.[doi:10.6047/j.issn.1000-8241.2020.04.012]
 ZHAO Jun,LIU Chunliang,XU Huatian,et al.Measurement methods and influence factors of coupon off-potential[J].Oil & Gas Storage and Transportation,2020,39(04):441-445.[doi:10.6047/j.issn.1000-8241.2020.04.012]
点击复制

试片断电电位测量方法及影响因素

参考文献/References:

[1] 和宏伟. 试片法在阴极保护电位测量的应用与影响因素[J]. 煤 气与热力,2018,38(12):B01-B05. HE H W. Application and influencing factors of coupon method in cathodic protection potential measurement[J]. Gas & Heat, 2018,38( 12):B01-B05.
[2] 薛致远,毕武喜,陈振华,张丰,陈洪源.油气管道阴极保护技术 现状与展望[J]. 油气储运,2014,33(9):938-944. XUE Z Y,BI W X,CHEN Z H,ZHANG F,CHEN H Y. Situation and outlook for cathodic protection technology of oil & gas pipeline[J]. Oil & Gas Storage and Transportation,2014, 33(9):938-944.
[3] 周勇,王楠,郭自新,魏克颖,张世虎.绝缘防腐蚀层缺陷对油 气管线阴极保护中IR 降的影响[J]. 腐蚀与防护,2016,37(9): 753-755. ZHOU Y,WANG N,GUO Z X,WEI K Y,ZHANG S H. Effect of the damage area of coating on IR drop of cathodic protection for oil and gas pipeline[J]. Corrosion & Protection,2016,37(9): 753-755.
[4] 张丰,赵晋云,吴晓宁,滕延平,赵君,吴长访,等.埋地管道外检 测方法的组合应用与验证[J]. 油气储运,2009,28(8): 35-37. ZHANG F,ZHAO J Y,WU X N,TENG Y P,ZHAO J,WU C F,et al. Use and verification of external survey methods for buried pipelines[J]. Oil & Gas Storage and Transportation, 2009,28(8):35-37.
[5] PRCI. Development of coupons for monitoring cathodic protection systems:L51888[R]. Houston:Technical Toolboxes, 2001:91-92.
[6] 付更扬,牟南翔. 杂散电流干扰下埋地管道极化电位的测量[J]. 腐蚀与防护,2013,34(6):533-535. FU G Y,MOU N X. Measurement of polarization potentials of buried pipelines subject to stray current interference[J]. Corrosion & Protection,2013,34(6):533-535.
[7] 张丰,周兴涛,王爱菊,薛致远,刘文会,姜有文,等. 试片断电法 与管道阴极保护[J]. 管道技术与设备,2014(3):37-39. ZHANG F,ZHOU X T,WANG A J,XUE Z Y,LIU W H, JIANG Y W,et al. Discussion about off potential of coupon and cathodic protection for pipeline[J]. Pipeline Technique and Equipment,2014(3):37-39.
[8] 李秋扬,徐茂霞,王晓东,桑邵雷,王金光,刘国. 极化电位测量 与远传技术在东黄输油老线的应用[J].油气储运,2011,30(12): 910-912. LI Q Y,XU M X,WANG X D,SANG S L,WANG J G,LIU G. The application of polarization potential measurement and transmission technique in Dongying-Huangdao Oil Pipeline[J]. Oil & Gas Storage and Transportation,2011,30(12):910-912.
[9] HOSOKAWA Y,KAJIYAMA F. Case studies on the assessment of AC and DC interference using steel coupons with respect to current density CP criteria[C]. San Diego:NACE 61st Annual Conference & Exposition,2006:06161.
[10] 秦莺,宋伟,郑志受,林伟国,李彪,王艳霞. 辅助试片法管道阴 极保护电位的精确测量[J]. 计量技术,2008(11):35-38. QIN Y,SONG W,ZHENG Z S,LIN W G,LI B,WANG Y X. Accurate measurement of cathodic protection potential for pipeline with auxiliary coupon method[J]. Measurement Technique,2008(11):35-38.
[11] 张远声,龚敏,林修洲. 埋地管道阴极保护效果的评定[J]. 四川 化工与腐蚀控制,2001,4(3):4-7. ZHANG Y S,GONG M,LIN X Z. Evaluation of CP effect for buried pipeline[J]. Sichuan Chemical and Corrosion Control, 2001,4(3):4-7.
[12] 张丰,齐晓忠,金宏,刘迎春,薛致远,陈洪源. 试片断电法在管 道阴极保护中的应用[J]. 油气储运,2013,32(7):760-763. ZHANG F,QI X Z,JIN H,LIU Y C,XUE Z Y,CHEN H Y. Application of coupon OFF method in cathodic protection system of pipeline[J]. Oil & Gas Storage and Transportation, 2013,32(7):760-763.
[13] 朱珺. 基于试片断电法的天然气管道防腐检测系统设计[J]. 电 子技术应用,2018,44(7):98-101. ZHU J. Design of anticorrosion detection system for natural gas pipeline based on test block power interruption method[J]. Application of Electronic Technique,2018,44(7):98-101.
[14] MARECETAL J C. Principles underlying the method of determine the true potentials on cathodically protected underground steel pipelines[C]. San Diego:NACE 53st Annual Conference & Exposition,1998:675.
[15] 李自力,谢跃辉,郝宏娜,卫续,张娜,禹浩. 用试片断电法测量 埋地管道的断电电位和去极化过程[J]. 腐蚀与防护,2012(3): 255-257. LI Z L,XIE Y H,HAO H N,WEI X,ZHANG N,YU H. Measurement of the off potential and depolarization process of buried pipelines with test block power interruption method[J]. Corrosion & Protection,2012(3):255-257.
[16] 黄腾飞. 埋地管道阴极保护电位参数及电位测试技术研究[D]. 南充:西南石油学院,2004:116-117. HUANG T F. Research on cathodic protection potential parameters and potential test technology of buried pipeline[D]. Nanchong:Southwest Petroleum University,2004:116-117.
[17] 危唯,张玉. 试片断电法延迟时间的选择[J]. 煤气与热力, 2016,36(4):B10-B11. WEI W,ZHANG Y. Selection of delay time for test block power interruption method[J]. Gas & Heat,2016,36(4):B10-B11.
[18] 谢跃辉. 试片断电法测量埋地管道断电电位的实验研究[D]. 青岛:中国石油大学(华东),2013:32-34. XIE Y H. The experimental study of measuring the off potential of buried pipelines with test block power interruption method[D]. Qingdao:China University of Petroleum(East China),2013:32-34.
[19] 李平. 地铁杂散电流干扰下管道阴极保护电位的测量与评价[J]. 腐蚀与防护,2019,40(11):845-848. LI P. CP potential measurement and evaluation of pipeline undergoing dynamic DC stray current interference from metro system[J]. Corrosion & Protection,2019,40(11):845-848.
[20] 刘军. 试片法测量管道的断电电位[J]. 煤气与热力,2015, 35(5):A40-A42. LIU J. Measurement of pipeline off-potential by test block method[J]. Gas & Heat,2015,35(5):A40-A42.

相似文献/References:

[1]周祥.埋地钢质管道外涂层缺陷的安全质量分级评价[J].油气储运,2011,30(04):299.[doi:10.6047/j.issn.1000-8241.2011.04.017]
 Zhou Xiang.Safety quality grading evaluation on the external coating defects of buried steel pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):299.[doi:10.6047/j.issn.1000-8241.2011.04.017]
[2]付吉强,吴明,杜明俊,等.埋地管道周围土壤湿热耦合相变过程的数值计算[J].油气储运,2011,30(01):30.[doi:10.6047/j.issn.1000-8241.2011.01.008]
 Fu Jiqiang,Wu Ming,Du Mingjun,et al.Numerical calculation on heat-moisture coupling and phase change process of the soil around buried pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):30.[doi:10.6047/j.issn.1000-8241.2011.01.008]
[3]陈杨,王为民,陈伟聪,等.基于故障树与模糊理论的埋地管道风险评价[J].油气储运,2011,30(07):481.[doi:10.6047/j.issn.1000-8241.2011.07.001]
 Chen Yang,Wang Weimin,Chen Weicong,et al.Risk assessment of the buried pipeline based on the fault tree and fuzzy theory[J].Oil & Gas Storage and Transportation,2011,30(04):481.[doi:10.6047/j.issn.1000-8241.2011.07.001]
[4]郝宏娜,李自力,王太源,等.阴极保护数值模拟计算边界条件的确定[J].油气储运,2011,30(07):504.[doi:10.6047/j.issn.1000-8241.2011.07.007]
 Hao Hongna,Li Zili,Wang Taiyuan,et al.Determination of boundary conditions for cathodic protective numerical simulation[J].Oil & Gas Storage and Transportation,2011,30(04):504.[doi:10.6047/j.issn.1000-8241.2011.07.007]
[5]胡士信,陆家榆,张本革,等.邻近强电线路管道交流干扰参数的测试方法[J].油气储运,2011,30(03):203.[doi:10.6047/j.issn.1000-8241.2011.03.012]
 Hu Shixin,Lu Jiayu,Zhang Benge,et al.Test method of AC interference parameters for pipeline adjacent power transmission lines[J].Oil & Gas Storage and Transportation,2011,30(04):203.[doi:10.6047/j.issn.1000-8241.2011.03.012]
[6]张丰,陈洪源,李国栋,等.数值模拟在管道和站场阴极保护中的应用[J].油气储运,2011,30(03):208.[doi:10.6047/j.issn.1000-8241.2011.03.013]
 Zhang Feng,Chen Hongyuan,Li Guodong,et al.The application of numerical simulation in cathodic protection of pipelines and stations[J].Oil & Gas Storage and Transportation,2011,30(04):208.[doi:10.6047/j.issn.1000-8241.2011.03.013]
[7]张贵喜,唐和清,金鑫,等.高压输电线路对埋地钢质管道的腐蚀影响[J].油气储运,2011,30(02):125.[doi:10.6047/j.issn.1000-8241.2011.02.012]
 Zhang Guixi,Tang Heqing,Jin Xin,et al.Effects of high-voltage power line on corrosion of buried steel pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):125.[doi:10.6047/j.issn.1000-8241.2011.02.012]
[8]李朝阳,马贵阳,刘亮.埋地输油管道泄漏油品扩散模拟[J].油气储运,2011,30(09):674.[doi:10.6047/j.issn.1000-8241.2011.09.008]
 Li Zhaoyang,Ma Guiyang,Liu Liang,et al.Diffusion simulation on leaked oil for buried pipelines[J].Oil & Gas Storage and Transportation,2011,30(04):674.[doi:10.6047/j.issn.1000-8241.2011.09.008]
[9]胡希斌,滕延平,吴继辉,等.用分流法解决单侧管道保护电位偏低的问题[J].油气储运,2011,30(10):736.[doi:10.6047/j.issn.1000-8241.2011.10.005]
 Hu Xibin,Teng Yanping,Wu Jihui,et al.Shunt method to deal with the lower cathodic protective potential at single side of pipeline[J].Oil & Gas Storage and Transportation,2011,30(04):736.[doi:10.6047/j.issn.1000-8241.2011.10.005]
[10]王朝振.高唐阴保站阴极保护系统问题的解决[J].油气储运,2011,30(11):851.[doi:10.6047/j.issn.1000-8241.2011.11.015]
 Wang Chaozhen.Solution to the effectiveness of CP system in Gaotang CP Point[J].Oil & Gas Storage and Transportation,2011,30(04):851.[doi:10.6047/j.issn.1000-8241.2011.11.015]
[11]薛致远,张丰,毕武喜,等.东北管网阴极保护通电/断电电位测量与分析[J].油气储运,2010,29(10):772.[doi:10.6047/j.issn.1000-8241.2010.10.014]
 Xue Zhiyuan,Zhang Feng,Bi Wuxi.The Measurement and Analysis of On/Off-potential in Northeast Oil Pipeline Networks[J].Oil & Gas Storage and Transportation,2010,29(04):772.[doi:10.6047/j.issn.1000-8241.2010.10.014]
[12]张丰,赵晋云,吴晓宁,等.埋地管道外检测方法的组合应用与验证[J].油气储运,2009,28(8):35.[doi:10.6047/j.issn.1000-8241.2009.08.009]
 ZHANG Feng,ZHAO Jinyun.Use and Verification of Exterual Survey Methods for Buried Pipelines[J].Oil & Gas Storage and Transportation,2009,28(04):35.[doi:10.6047/j.issn.1000-8241.2009.08.009]
[13]庞孟枝.城市埋地管道阴极保护及电化学理论分析[J].油气储运,1998,17(3):23.[doi:10.6047/j.issn.1000-8241.1998.03.008]
 Pang Mengzhi.Cathodic protection and analysis of electrochemical theory on urban buried pipeline[J].Oil & Gas Storage and Transportation,1998,17(04):23.[doi:10.6047/j.issn.1000-8241.1998.03.008]
[14]张学友.从任京线检查片腐蚀谈管道阴极保护作用[J].油气储运,1997,16(11):25.[doi:10.6047/j.issn.1000-8241.1997.11.008]
 Zhang Xueyou.From Corrosion Condition of the Coupons Buried in the Renjing Pipeline to See the Function of Cathodic Protection[J].Oil & Gas Storage and Transportation,1997,16(04):25.[doi:10.6047/j.issn.1000-8241.1997.11.008]
[15]刘玲莉.科学地进行埋地管道的腐蚀控制[J].油气储运,1997,16(1):36.[doi:10.6047/j.issn.1000-8241.1997.01.009]
 Liu Lingli.Corrosion Control for Buried Pipeline[J].Oil & Gas Storage and Transportation,1997,16(04):36.[doi:10.6047/j.issn.1000-8241.1997.01.009]
[16]孙希功,王芷芳.东营原油库区域性阴极保护[J].油气储运,1992,11(3):57.[doi:10.6047/j.issn.1000-8241.1992.03.015]
 [J].Oil & Gas Storage and Transportation,1992,11(04):57.[doi:10.6047/j.issn.1000-8241.1992.03.015]
[17]张俊义.埋地管道腐蚀规律初探[J].油气储运,1991,10(3):30.[doi:10.6047/j.issn.1000-8241.1991.03.008]
 Zhang Junyi.Preliminary Inquiry into the Regular Pattern of Corrosion of Buried Pipeline[J].Oil & Gas Storage and Transportation,1991,10(04):30.[doi:10.6047/j.issn.1000-8241.1991.03.008]
[18]王平.对有阴极保护措施的埋地输油管道腐蚀现象的分析[J].油气储运,1991,10(2):29.[doi:10.6047/j.issn.1000-8241.1991.02.007]
 Wang Ping.Analysis on Corrosive Phenomenon of Buried Oil Pipeline with Catho-dic Protection[J].Oil & Gas Storage and Transportation,1991,10(04):29.[doi:10.6047/j.issn.1000-8241.1991.02.007]
[19]蔡光昕.埋地钢质“管中管”类长输管道阴极保护状况分析[J].油气储运,1990,9(4):39.[doi:10.6047/j.issn.1000-8241.1990.04.007]
 Cai Guangxin.Engineering Surveys of Gathodic Protection of Buried Steel Pipeline in Pipe-in-Pipe Form[J].Oil & Gas Storage and Transportation,1990,9(04):39.[doi:10.6047/j.issn.1000-8241.1990.04.007]
[20]常守文,张莉华,李绍忠.埋地涂层金属管道电位测量中的IR降影响及消除[J].油气储运,1989,8(3):38.[doi:10.6047/j.issn.1000-8241.1989.03.012]
 Chang Shouwen.The Effect of IR Drop and Elemination in potential Measure-ment on Buried and Coated Metal Pipeline[J].Oil & Gas Storage and Transportation,1989,8(04):38.[doi:10.6047/j.issn.1000-8241.1989.03.012]

备注/Memo

(收稿日期:2017-10-23;修回日期:2020-02-21;编辑:杜娟) 基金项目:中国石油天然气股份有限公司科技攻关项目“油气管道腐蚀控制有效性研究”,2014B-3415-0507。作者简介:赵君,男,1982 年生,高级工程师,2004 年毕业于天津大学材料科学与工程专业,现主要从事油气管道腐蚀与防护方向的研究工作。地址:河北省廊坊市广阳区金光道51 号,065000。电话:0316-2170049。Email:kjzhaojun@petrochina.com.cn

更新日期/Last Update: 2020-04-25