[1]袁志超 董顺 薛纪新 夏硕 王剑琨.LNG 接收站高压泵增加叶轮后的性能变化及影响[J].油气储运,2019,38(09):1054-1058.[doi:10.6047/j.issn.1000-8241.2019.09.014]
 YUAN Zhichao,DONG Shun,XUE Jixin,et al.Performance change and influence of high-pressure pumps after being added with impellers[J].Oil & Gas Storage and Transportation,2019,38(09):1054-1058.[doi:10.6047/j.issn.1000-8241.2019.09.014]
点击复制

LNG 接收站高压泵增加叶轮后的性能变化及影响

参考文献/References:

[1] 顾安忠. 液化天然气技术手册[M]. 北京:机械工业出版社, 2010:503-519. GU A Z. Liquefied natural gas(LNG)technical manuals[M]. Beijing:China Machine Press,2010:503-519.
[2] 李鑫,陈帅. LNG 接收站气化外输单位能耗计算[J]. 石油与天 然气化工,2016,45(2):109-116. LI X,CHEN S. A calculation on the unit energy of the vaporization-transportation at LNG terminal[J]. Chemical Engineering of Oil & Gas,2016,45(2):109-116.
[3] 王小尚,刘景俊,李玉星,等. LNG 接收站BOG 处理工艺优 化—以青岛LNG 接收站为例[J]. 天然气工业,2014,34(4):125-130. WANG X S,LIU J J,LI Y X,et al. A case study of processing and optimization of BOG gas treatment in an LNG terminal in Qingdao[J]. Natural Gas Industry,2014,34(4):125-130.
[4] PARK C,SONG K,LEE S,et al. Retrofit design of a boil off gas handling process in liquefied natural gas receiving terminals[J]. Energy,2012,44(1):69-78.
[5] LI Y,BAI F. A policy study examining the use of imported LNG for gas-fired power generation on the southeast coast of China[J]. Energy Policy,2010,38(2):896-901.
[6] SHIN M W,SHIN D,CHOI S H,et al. Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks[J]. Korean Journal of Chemical Engineering, 2008,25(1):7-12.
[7] QUEROL E,GONZALEZ DEL REGUERAL B,GARCIATORRENT J,et al. Boil off gas(BOG)management in Spanish liquid natural gas(LNG)terminals[J]. Applied Energy,2010, 87(11):3384-3392.
[8] ROMERO J,OROSA J A,OLIVERIRA A C. Research on the Brayton cycle design conditions for reliquefaction cooling of LNG boil off[J]. Journal of Marine Science and Technology,2012,17(4):532-541.
[9] 梅丽,魏玉迎. 江苏LNG 接收站高压泵并联运行控制[J]. 油气 储运,2012,31(增刊1):129-132. MEI L,WEI Y Y. Parallel operation control of high-pressure pumps operation in Jiangsu LNG terminal[J]. Oil & Gas Storage and Transportation,2012,31(S1):129-132.
[10] 周华,张一范,陈帅,等. LNG 接收站试运投产中高压泵的冷却 技术[J]. 流体机械,2013,41(1):55-58. ZHOU H,ZHANG Y F,CHEN S,et al. Approach of cooling down high pressure pump in the commissioning of LNG receiving terminal[J]. Fluid Machinery,2013,41(1):55-58.
[11] 刘萍,陈磊. LNG 接收站高压泵预冷方式对比[J]. 油气储运, 2012,31(增刊1):30-32. LIU P,CHEN L. Comparison of cooling down high pressure pump in the LNG receiving terminal[J]. Oil & Gas Storage and Transportation,2012,31(S1):30-32.
[12] 李世斌. 液化天然气高压泵泵井液位波动的原因分析及措 施[J]. 上海煤气,2014(1):7-10. LI S B. Analysis on the level fluctuation of LNG HP pump well and countermeasures[J]. Shanghai Gas,2014(1):7-10.
[13] 王全国,凌晓东,党文义,等. 基于CFD 和TNO 多能法联合的 LNG 接收站气体爆炸风险分析[C]. 广州:第二届中国液化天 然气储运技术交流会,2016:476-479. WANG Q G,LING X D,DANG W Y,et al. Based on the method of CFD and TNO pluripotent joint LNG receiving station of the gas explosion risk analysis[C]. Guangzhou:China 2st LNG Storage and Transportation Technology Forum,2016:476-479.
[14] 罗涛,李龙姣. 江苏LNG 高压泵饱和蒸汽压差联锁的优化[J]. 油气储运,2014,33(增刊1):36-40. LUO T,LI L J. Optimization of saturated vapor pressure difference interlocks of Jiangsu LNG HP pumps[J]. Oil & Gas Storage and Transportation,2014,33(S1):36-40.
[15] 王同吉,陈文杰,赵金睿,等. LNG 接收终端气化器冬季运行模 式优化[J]. 油气储运,2018,37(11):1272-1279. WANG T J,CHEN W J,ZHAO J R,et al. Optimization of the operation mode of vaporizers at LNG terminals in winter[J]. Oil & Gas Storage and Transportation,2018,37(11):1272-1279.
[16] 胡超,刘庆胜,谢芝,等. LNG 接收站高压外输泵异响故障分 析[J]. 炼油技术与工程,2017,47(5):28-31. HU C,LIU Q S,XIE Z,et al. Fault analysis for abnormal sound of HP sent-out pump in LNG receiving terminal[J]. Petroleum Refinery Engineering,2017,47(5):28-31.
[17] 张化川. LNG 接收站低温罐内潜液泵水力研发设计[J]. 低温 与特气,2017,35(1):7-10,16. ZHANG H C. The hydro development of cryogenic in tank submerged pump for LNG receiving station[J]. Low Temperature and Specialty Gases,2017,35(1):7-10,16.
[18] 胡瑾秋,王倩琳,张来斌,等. 变压力工况下压裂泵的疲劳失效 演化规律研究[J]. 石油机械,2017,45(4):67-73,78. HU J Q,WANG Q L,ZHANG L B,et al. Fatigue failure evolution of fracturing pump under changing pressure condition[J]. China Petroleum Machinery,2017,45(4):67-73,78.
[19] 薛倩,刘名瑞,肖文涛,等. LNG 接收站BOG 处理工艺优化及 功耗分析[J]. 油气储运,2016,35(4):376-380. XUE Q,LIU M R,XIAO W T,et al. Optimization and energy consumption analysis of BOG treatment processes in LNG terminal[J]. Oil & Gas Storage and Transportation, 2016,35(4):376-380.
[20] 王志寰,李成兵,周宁. 大型LNG 接收站泄漏事故灾害效应分 析与预测[J]. 天然气工业, 2019,39(5):145-153. WANG Z H,LI C B,ZHOU N. Analysis and prediction on the disaster effect of leakage accidents at large LNG receiving stations[J]. Natural Gas Industry,2019,39(5):145-153.

相似文献/References:

[1]杨克瑞,尹清党.LNG 接收站的风险与预防措施[J].油气储运,2011,30(08):675.[doi:10.6047/j.issn.1000-8241.2011.08.021]
 Yang Kerui and Yin Qingdang.Hazards of LNG receiving terminal and preventive measures[J].Oil & Gas Storage and Transportation,2011,30(09):675.[doi:10.6047/j.issn.1000-8241.2011.08.021]
[2]杨信一,刘筠竹,李硕.唐山LNG 接收站浸没燃烧式气化器运行优化[J].油气储运,2018,37(10):1153.[doi:10.6047/j.issn.1000-8241.2018.10.011]
 YANG Xinyi,LIU Yunzhu,LI Shuo.Operation optimization of submerged combustion vaporizer in Tangshan LNG receiving station[J].Oil & Gas Storage and Transportation,2018,37(09):1153.[doi:10.6047/j.issn.1000-8241.2018.10.011]
[3]陈文杰,靳由顺,王同吉,等.LNG 接收站试运投产关键环节的质量控制[J].油气储运,2018,37(9):1018.[doi:10.6047/j.issn.1000-8241.2018.09.010]
 CHEN Wenjie,JIN Youshun,WANG Tongji,et al.Quality control in the key links of LNG terminal’s commissioning[J].Oil & Gas Storage and Transportation,2018,37(09):1018.[doi:10.6047/j.issn.1000-8241.2018.09.010]
[4]王同吉,陈文杰,赵金睿,等.LNG接收终端气化器冬季运行模式优化[J].油气储运,2018,37(11):1272.[doi:10.6047/j.issn.1000-8241.2018.11.013]
 WANG Tongji,CHEN Wenjie,ZHAO Jinrui,et al.Optimization of the operation mode of vaporizers at LNG terminals in winter[J].Oil & Gas Storage and Transportation,2018,37(09):1272.[doi:10.6047/j.issn.1000-8241.2018.11.013]
[5]周怀发,申永亮,张兴,等.基于层次分析与集对分析法的LNG 槽车区风险评价[J].油气储运,2019,38(03):279.[doi:10.6047/j.issn.1000-8241.2019.03.006]
 ZHOU Huaifa,SHEN Yongliang,ZHANG Xing,et al.Risk assessment on LNG tanker loading region based on analytical hierarchy process and set pair analysis theory[J].Oil & Gas Storage and Transportation,2019,38(09):279.[doi:10.6047/j.issn.1000-8241.2019.03.006]
[6]袁志超 董顺 薛纪新 夏硕 王剑琨.LNG接收站高压泵增加叶轮后的性能变化及影响[J].油气储运,2019,38(05):1.
 YUAN Zhichao,DONG Shun,XUE Jixin,et al.Performance change of high-pressure pumps after being added with impellers and its influence on the process operation of LNG terminal[J].Oil & Gas Storage and Transportation,2019,38(09):1.

备注/Memo

作者简介:袁志超,男,1985 年生,工程师,2014 年硕士毕业于江苏大学机械制造及其自动化专业,现主要从事LNG 接收站运行管理和天然气管道建设工作。地址:山东省日照市岚山区轿顶山路99 号鲁圣大厦,276800。电话:13791992098。Email:yuanzhichao521@126.com
编辑:李在蓉

更新日期/Last Update: 2019-09-25