分享
[1]张毅刘晓文张锋邹鹏王宽龙.管道自动焊装备发展现状及前景展望[J].油气储运,2019,38(07):721-727.[doi:10.6047/j.issn.1000-8241.2019.07.001]
 ZHANG Yi,LIU Xiaowen,ZHANG Feng,et al.Development status and prospect of pipe automatic welding equipment[J].Oil & Gas Storage and Transportation,2019,38(07):721-727.[doi:10.6047/j.issn.1000-8241.2019.07.001]
点击复制

管道自动焊装备发展现状及前景展望

参考文献/References:

[1] 张斌,钱成文,王玉梅,等. 国内外高钢级管线钢的发展及应 用[J]. 石油工程建设,2012,38(1):1-4,64. ZHANG B,QIAN C W,WANG Y M,et al. Development and application of high grade steel pipeline at home and abroad[J]. Petroleum Engineering Construction,2012,38(1):1-4,64.
[2] 隋永莉,吴宏. 我国长输油气管道自动焊技术应用现状及展 望[J]. 油气储运,2014,33(9):913-921. SUI Y L,WU H. Current and future application of automatic welding technology for long-distance oil/gas pipeline in China[J]. Oil & Gas Storage and Transportation,2014,33(9):913-921.
[3] 隋永莉,郭锐,张继成. 管道环焊缝半自动焊与自动焊技术对比 分析[J]. 焊管,2013,36(9):38-47. SUI Y L,GUO R,ZHANG J C. Comparative analysis on semi-automatic and automatic welding technology of pipeline circumferential weld[J]. Welded Pipe and Tube,2013,36(9):38-47.
[4] 楼剑军,白海涛,杜根伟. 高寒地区 D1422 mm 管道自动焊接作业 工效及成本研究[J]. 石油工程建设,2018,44(增刊 1):110-116. LOU J J,BAI H T,DU G W. Efficiency and cost of automatic welding operation for D1422 mm pipeline in high and cold region[J]. Petroleum Engineering Construction,2018,44(S1):110-116.
[5] 张锋,刘晓文,徐欣欣,等. 山区管道自动焊设备与工艺研究[J]. 电焊机,2018,48(2):37-41. ZHANG F,LIU X W,XU X X,et al. Study on the equipment and techniques for automatic pipeline welding in mountain area[J]. Electric Welding Machine,2018,48(2):37-41.
[6] 闫臣,王玉雷,薛振奎. 油气管道自动焊技术的发展及展望[J]. 焊接技术,2016,45(5):83-88. YANG C,WANG Y L,XU Z K. Development and prospect of automatic welding technology for oil and gas pipeline[J].Welding Technology,2016,45(5):83-88.
[7] 王少锋,胡建春. 大口径长输管道 CRC 全自动焊接工艺研究[J]. 压力容器,2013(8):75-79. WANG S F,HU J C. Research on CRC automatic welding procedure of large-diameter long-distance pipeline[J]. Pressure Vessel Technology,2013(8):75-79.
[8] 勒巍. X100 高强管线钢 CRC 全自动焊接工艺技术研究[J]. 焊 接,2017(2):48-53. LE W. CRC automatic welding technology of X100 grade high strength pipeline steel[J]. Welding & Joining,2017(2):48-53.
[9] 董嘉琪,杨小龙,费纪纲,等. X80 钢级长输管线自动焊接技术 探讨[J]. 油气田地面工程,2016,35(11):77-80. DONG J Q,YANG X L,FEI J G,et al. Discussion on grade X80 steel at the beginning of long distance pipeline automatic welding technology[J]. Oil-Gas Field Surface Engineering,2016,35(11):77-80.
[10] 雷振,徐良,徐富家,等. 激光-电弧复合焊接技术国内研究现状 及典型应用[J]. 焊接,2018(12):1-6,65. LEI Z,XU L,XU F J,et al. Research status and typical application of laser-arc composite welding technology[J]. Welding & Joining,2018(12):1-6,65.
[11] JAN F,ALEXANDER F H K. Undercuts in laser arc hybrid welding[J]. Physics Procedia,2014,56:663-672.
[12] 曾惠林,皮亚东,王新升,等. 长输管道全位置激光-电弧复合焊 接技术[J]. 焊接学报,2012,33(11):110-112,118. ZENG H L,PI Y D,WANG X S,et al. All position laser-arc composite welding technology for pipeline[J]. Transactions of the China Welding Institution,2012,33(11):110-112,118.
[13] 屈华鹏,张宏亮,冯翰秋,等. 金属材料增材制造(3D 打印)技 术的局限性[J]. 热加工工艺,2018,47(16):1-6,12. QU H P,ZHANG H L,FENG H Q,et al. Limitations of additive manufacturing(3D printing) process for metal materials[J]. Hot Working Technology,2018,47(16):1-6,12.
[14] 刘勇,任香会,常云龙,等. 金属增材制造技术的研究现状[J]. 热加工工艺,2018,47(19):15-19,24. LIU Y,REN X H,CHANG Y L,et al. Research status of metal additive manufacturing technology[J]. Hot Working Technology,2018,47(19):15-19,24.
[15] 黎志勇,杨斌,王鹏程,等. 金属 3D 打印技术研究现状及其趋 势[J]. 新技术新工艺,2017(4):25-28. LI Z Y,YANG B,WANG P C,et al. Research status and trend of metal 3D printing technology[J]. New Technology & New Process,2017(4):25-28.
[16] MLHLAYANLER E,DILMAC S,GUNER A. Analysis of the effect of production process parameters and density of expanded polystyrene insulation boards on mechanical properties and thermal conductivity[J]. Materials & Design, 2008,29(2):344-352.
[17] 陈国庆,树西,柳峻鹏,等. 真空电子束焊接技术应用研究现 状[J]. 精密成形工程,2018,10(1):31-39. CHEN G Q,SHU X,LIU J P,et al. Development status of applications of vacuum electron beam welding technology[J]. Journal of Netshape Forming Engineering,2018,10(1):31-39.
[18] 卢泓方,吴晓南,ISELEY T,等. 国外天然气管道检测技术现 状及启示[J]. 天然气工业,2018,38(2):103-111. LU H F,WU X N,ISELEY T,et al. The status quo of natural gas line pipe inspection technologies abroad and its implications for China[J]. Natural Gas Industry,2018,38(2):103-111.
[19] 邹勇,李运华,蒋力培,等. 基于熔池图像尖端特征规律的焊接 偏差测定方法[J]. 焊接学报,2015,36(8):18-22. ZOU Y,LI Y H,JIANG L P,et al. Method of detecting weld deviation based on the image feature of molten pool’s edge[J]. Transactions of the China Welding Institution,2015, 36(8):18-22.
[20] GAO X D,DING D K,BAI T X,et al. Weld-pool image centroid algorithm for seam-tracking vision model in arcwelding process[J]. IET Image Processing,2011,5(5): 410-419.
[21] 张锋,王新升,李岩,等. 脉冲焊接工艺摆动电弧焊缝跟踪技 术[J]. 焊接,2018(2):39-42,63. ZHANG F,WANG X S,LI Y,et al. The tracking technology of pulse welding process of swing arc welding seam[J]. Welding & Joining,2018(2):39-42,63.

相似文献/References:

[1]黄春芳 陈燕 周芳 黄月 吴州阳 杨松 王自发. 石油天然气管道站内管道爆破吹扫[J].油气储运,2012,31(12):934.[doi:10.6047/j.issn.1000-8241.2012.06.016]
 Huang Chunfang,Chen Yan,Zhou Fang,et al. Bursting purge method in stations of oil and gas pipeline[J].Oil & Gas Storage and Transportation,2012,31(07):934.[doi:10.6047/j.issn.1000-8241.2012.06.016]
[2]戴联双,汤长江,冯治中,等.油气管道恐怖袭击风险评估方法与应用[J].油气储运,2011,30(05):337.[doi:10.6047/j.issn.1000-8241.2011.05.004]
 Dai Lianshuang,Tang Changjiang,Feng Zhizhong,et al.Risk assessment methodology and application for oil and gas pipelines’ terrorist attack[J].Oil & Gas Storage and Transportation,2011,30(07):337.[doi:10.6047/j.issn.1000-8241.2011.05.004]
[3]王乾坤,张争伟,石悦,等.埋地油气管道并行敷设技术发展现状[J].油气储运,2011,30(01):1.[doi:10.6047/j.issn.1000-8241.2011.01.001]
 Wang Qiankun,Zhang Zhengwei,Shi Yue,et al.Development status of the parallel laying technology in underground oil & gas pipelines[J].Oil & Gas Storage and Transportation,2011,30(07):1.[doi:10.6047/j.issn.1000-8241.2011.01.001]
[4]马伟平,贾子麒,赵晋云,等.美国油气管道法规和标准体系的管理模式[J].油气储运,2011,30(01):5.[doi:10.6047/j.issn.1000-8241.2011.01.002]
 Ma Weiping,Jia Ziqi,Zhao Jinyun,et al.Oil and gas pipeline eegulations and management mode of standard system in America[J].Oil & Gas Storage and Transportation,2011,30(07):5.[doi:10.6047/j.issn.1000-8241.2011.01.002]
[5]李鹤林.油气管道失效控制技术[J].油气储运,2011,30(06):401.[doi:10.6047/j.issn.1000-8241.2011.06.001]
 Li Helin.Failure control technique of oil & gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(07):401.[doi:10.6047/j.issn.1000-8241.2011.06.001]
[6]荆宏远,郝建斌,陈英杰,等.管道地质灾害风险半定量评价方法与应用[J].油气储运,2011,30(07):497.[doi:10.6047/j.issn.1000-8241.2011.07.005]
 Jing Hongyuan,Hao Jianbin,Chen Yingjie,et al.Technique and application of geologic hazard risk semi-quantitative assessment of pipeline[J].Oil & Gas Storage and Transportation,2011,30(07):497.[doi:10.6047/j.issn.1000-8241.2011.07.005]
[7]陈敬和.管道外腐蚀直接评价技术[J].油气储运,2011,30(07):523.[doi:10.6047/j.issn.1000-8241.2011.07.012]
 Chen Jinghe.Direct assessment technology of pipeline external corrosion[J].Oil & Gas Storage and Transportation,2011,30(07):523.[doi:10.6047/j.issn.1000-8241.2011.07.012]
[8]吴琋瑛.光缆与油气管道同沟敷设应用实践[J].油气储运,2011,30(07):547.[doi:10.6047/j.issn.1000-8241.2011.07.021]
 Wu Xiying.Technique application of laying in one ditch for fiber cable and oil or gas pipeline[J].Oil & Gas Storage and Transportation,2011,30(07):547.[doi:10.6047/j.issn.1000-8241.2011.07.021]
[9]焦中良,李志文,李志勇,等.油气管道波动压力的雨流计数与分析[J].油气储运,2011,30(08):624.[doi:10.6047/j.issn.1000-8241.2011.08.007]
 Jiao Zhongliang,Li Zhiwen,Li Zhiyong,et al.Rain-flow counting analysis of the fluctuation pressure for oil & gas pipelines[J].Oil & Gas Storage and Transportation,2011,30(07):624.[doi:10.6047/j.issn.1000-8241.2011.08.007]
[10]樊文斌,罗自治,张策.管内高压封堵器的研制[J].油气储运,2011,30(08):657.[doi:10.6047/j.issn.1000-8241.2011.08.015]
 Fan Wenbin,Luo Zizhi,Zhang Ce.Development of high-pressure pipeline isolation plug[J].Oil & Gas Storage and Transportation,2011,30(07):657.[doi:10.6047/j.issn.1000-8241.2011.08.015]

备注/Memo

(收稿日期:2017-11-17;修回日期:2019-05-17;编辑:杜娟)基金项目:中国石油天然气股份有限公司科学研究与技术开发项 目“第三代大输量天然气管道工程关键技术研究”,2012E-2801-09。 作者简介:张毅,男,1986 年生,工程师,2008 年毕业于西安石油 大学自动化专业,现主要从事管道自动焊装备的研发、生产及制造工 作。地址:河北省廊坊市金光道 44 号,065000。电话:17788285116。 Email:zhangyi.2008.001@163.com

更新日期/Last Update: 2019-06-30