[1]戴政 肖荣鸽 马钢 曹沙沙 祝月.LNG站BOG回收技术研究进展[J].油气储运,2019,38(10):1-9.
 DAI Zheng,XIAO Rongge,MA Gang,et al.Research progress on the BOG recovery technologies used at LNG stations[J].Oil & Gas Storage and Transportation,2019,38(10):1-9.
点击复制

LNG站BOG回收技术研究进展

相似文献/References:

[1]孙宪航 陈保东 张莉莉 刘杰 李征帛 杜义朋. 液化天然气BOG 的计算方法与处理工艺[J].油气储运,2012,31(12):931.[doi:10.6047/j.issn.1000-8241.2012.12.015]
 Sun Xianhang,Chen Baodong,Zhang Lili,et al.BOG calculation method and processing technique of liquefied natural gas[J].Oil & Gas Storage and Transportation,2012,31(10):931.[doi:10.6047/j.issn.1000-8241.2012.12.015]
[2]陈雪,李明.LNG储罐内BOG动态模拟研究[J].油气储运,2008,27(11):36.[doi:DOI:10.6047/j.issn.1000-8241.2008.11.010]
 CHEN Xue,LI Ming.Dynamic Simulation Research on BOG in LNG Tank[J].Oil & Gas Storage and Transportation,2008,27(10):36.[doi:DOI:10.6047/j.issn.1000-8241.2008.11.010]
[3]王家根 何愈歆.BOG 脱氮对PRICO 液化工艺的影响[J].油气储运,2013,32(11):1261.[doi:10.6047/j.issn.1000-8241.2013.11.026]
 Wang Jiagen,He Yuxin.Effect of BOG nitrogen removal on PRICO liquefaction process Wang Jiagen1, He Yuxin2[J].Oil & Gas Storage and Transportation,2013,32(10):1261.[doi:10.6047/j.issn.1000-8241.2013.11.026]
[4]牛斌,吕俊.浙江LNG接收站外输计量控制要点[J].油气储运,2015,34(9):1023.[doi:10.6047/j.issn.1000-8241.2015.09.022]
 NIU Bin,LYU Jun.Key points for control over sendout metering in Zhejiang LNG Terminal[J].Oil & Gas Storage and Transportation,2015,34(10):1023.[doi:10.6047/j.issn.1000-8241.2015.09.022]
[5]贾保印,白改玲.大气压变化对蒸发气压缩机处理能力的影响[J].油气储运,2016,35(2):154.[doi:10.6047/j.issn.1000-8241.2016.02.007]
 JIA Baoyin,BAI Gailing.Impacts of changes in atmospheric pressure to processing capacity of BOG compressor[J].Oil & Gas Storage and Transportation,2016,35(10):154.[doi:10.6047/j.issn.1000-8241.2016.02.007]
[6]姜国良,侯志强,刘骁,等.山东LNG接收站再冷凝器工艺及控制系统[J].油气储运,2015,34(1):42.[doi:10.6047/j.issn.1000-8241.2015.01.008]
 JIANG Guoliang,HOU Zhiqiang,LIU Xiao,et al.Recondenser process and control system of Shandong LNG Terminal[J].Oil & Gas Storage and Transportation,2015,34(10):42.[doi:10.6047/j.issn.1000-8241.2015.01.008]
[7]陈帅,宫明,魏念鹰,等.LNG接收站不同运行参数下最小外输量的计算[J].油气储运,2015,34(3):303.[doi:10.6047/j.issn.1000-8241.2015.03.017]
 CHEN Shuai,GONG Ming,WEI Nianying,et al.Calculation of minimum sendout rate of LNG terminal with different operating parameters[J].Oil & Gas Storage and Transportation,2015,34(10):303.[doi:10.6047/j.issn.1000-8241.2015.03.017]
[8]胡超,杨光远,孙吉业.山东LNG接收站船舶气试工艺改造方案比选[J].油气储运,2015,34(3):323.[doi:10.6047/j.issn.1000-8241.2015.03.021]
 HU Chao,YANG Guangyuan,SUN Ji.Comparison of technological transformation scenario of gas test process for ships at Shandong LNG Terminal[J].Oil & Gas Storage and Transportation,2015,34(10):323.[doi:10.6047/j.issn.1000-8241.2015.03.021]
[9]王赟,贺三,战永辉,等.移动式小型BOG增压再液化装置功耗的模拟计算[J].油气储运,2015,34(6):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
 WANG Yun,HE San,ZHAN Yonghui,et al.Simulated calculation of power consumption of the mobile small-scale BOG compression and reliquefaction plant[J].Oil & Gas Storage and Transportation,2015,34(10):662.[doi:10.6047/j.issn.1000-8241.2015.06.021]
[10]吴晓南,韩晓瑜,陈利琼,等.LNG加气站BOG再液化工艺[J].油气储运,2015,34(6):607.[doi:10.6047/j.issn.1000-8241.2015.06.009]
 WU Xiaonan,HAN Xiaoyu,CHEN Liqiong,et al.BOG reliquefaction process in LNG filling station[J].Oil & Gas Storage and Transportation,2015,34(10):607.[doi:10.6047/j.issn.1000-8241.2015.06.009]

更新日期/Last Update: 2019-11-28