[1]张保龙 尹恒 董华清 王巍尧 成志强.含环向表面裂纹埋地管道的沉降裕度[J].油气储运,2019,38(10):1-6.
 ZHANG Baolong,YIN Heng,DONG Huaqing,et al.Settlement allowance of the buried pipeline with circumferential surface cracks[J].Oil & Gas Storage and Transportation,2019,38(10):1-6.
点击复制

含环向表面裂纹埋地管道的沉降裕度

相似文献/References:

[1]王坤园 程国明 陈剑.煤矿长壁开采过程中埋地管道的变形破坏分析[J].油气储运,2016,35(预出版):1.
 WANG Kunyuan,CHENG Guoming,CHEN Jian.Analysis on deformation and failure of buried pipelines during longwall coal mining[J].Oil & Gas Storage and Transportation,2016,35(10):1.
[2]沙胜义,冯庆善,王学力,等.埋地管道凹坑缺陷开挖验证[J].油气储运,2014,33(8):834.[doi:10.6047/j.issn.1000-8241.2014.08.007]
 SHA Shengyi,FENG Qingshan,WANG Xueli,et al.Excavated verification technology of pit defects of buried pipeline[J].Oil & Gas Storage and Transportation,2014,33(10):834.[doi:10.6047/j.issn.1000-8241.2014.08.007]
[3]马宁 张艳.基于 ANSYS 二次开发的埋地管道应力分析软件及实现[J].油气储运,2016,35(预出版):1.
 MA Ning,ZHANG Yan.Development of stress analysis software for buried pipelines based on re-development of ANSYS[J].Oil & Gas Storage and Transportation,2016,35(10):1.
[4]赵树炳,赵振兴,张志强,等.多年冻土区埋地管道保温方案的设计与有限元分析[J].油气储运,2015,34(1):86.[doi:10.6047/j.issn.1000-8241.2015.01.018]
 ZHAO Shubing,ZHAO Zhenxing,ZHANG Zhiqiang,et al.Design and finite element analysis of insulation of pipeline buried in permafrost area[J].Oil & Gas Storage and Transportation,2015,34(10):86.[doi:10.6047/j.issn.1000-8241.2015.01.018]
[5]李强,陈德利,屈洋.爆破对输气管道本体影响的监测[J].油气储运,2015,34(2):190.[doi:10.6047/j.issn.1000-8241.2015.02.017]
 LI Qiang,CHEN Deli,QU Yang.Monitoring on effects of blasting on gas pipeline body distortion[J].Oil & Gas Storage and Transportation,2015,34(10):190.[doi:10.6047/j.issn.1000-8241.2015.02.017]
[6]王坤园,程国明,陈剑.煤矿长壁开采过程中埋地管道的变形破坏分析[J].油气储运,2016,35(4):439.[doi:10.6047/j.issn.1000-8241.2016.04.017]
 WANG Kunyuan,CHENG Guoming,CHEN Jian.Analysis on deformation and failure of buried pipelines during longwall coal mining[J].Oil & Gas Storage and Transportation,2016,35(10):439.[doi:10.6047/j.issn.1000-8241.2016.04.017]
[7]马宁,张艳.基于ANSYS二次开发的埋地管道应力分析软件及实现[J].油气储运,2016,35(6):625.[doi:10.6047/j.issn.1000-8241.2016.06.011]
 MA Ning,ZHANG Yan.Development of stress analysis software for buried pipelines based on re-development of ANSYS[J].Oil & Gas Storage and Transportation,2016,35(10):625.[doi:10.6047/j.issn.1000-8241.2016.06.011]
[8]刘啸奔,张宏,李勐,等.断层作用下埋地管道应变分析方法研究进展[J].油气储运,2016,35(8):799.[doi:10.6047/j.issn.1000-8241.2016.08.001]
 LIU Xiaoben,ZHANG Hong,LI Meng,et al.Research progress of strain analysis methods for buried pipelines under faulting process[J].Oil & Gas Storage and Transportation,2016,35(10):799.[doi:10.6047/j.issn.1000-8241.2016.08.001]
[9]巴振宁 王智恺 梁建文.温度和不均匀沉降耦合作用下埋地管道力学性能[J].油气储运,2018,37(预出版):1.
 BA Zhenning,WANG Zhikai,LIANG Jianwen.Mechanical properties of buried pipeline under the coupling effect of temperature and uneven settlement[J].Oil & Gas Storage and Transportation,2018,37(10):1.
[10]崔艳雨 丁清苗 沈陶 王乾.机坪输油管网附加外荷载研究现状[J].油气储运,2017,36(预出版):1.
 CUI Yanyu,DING Qingmiao,SHEN Tao,et al.Study status of extra external loading on ramp oil pipeline networks[J].Oil & Gas Storage and Transportation,2017,36(10):1.

更新日期/Last Update: 2019-11-11