[1]岑康,李长俊,廖柯熹,等.液体管道瞬变流摩阻的计算方法[J].油气储运,2004,23(11):25-28.[doi:10.6047/j.issn.1000-8241.2004.11.009]
 CEN Kang,LI Changjun.The Methods of the Computation of Friction Losses in Transient Pipe Flow[J].Oil & Gas Storage and Transportation,2004,23(11):25-28.[doi:10.6047/j.issn.1000-8241.2004.11.009]
点击复制

液体管道瞬变流摩阻的计算方法

参考文献/References:

[1] 清华大学流体传动与控制教研组译:瞬变流,水利电力出版社(北京),1983.
[2] Wylie E B and Streeter V:Fluid transients in systems,Prentice-Hall,Inc.,Englewood Cliffs,N.J. 1993.
[3] 鄂学全刘国华等:特征线法分析长距离输油管道的流动瞬变过程,水动力学研究与进展,1998,13(4).
[4] Daily J W,Hankey W L,Olive R W and Jordan J M:Resistance coefficients for accelerated and decelerated flows through smooth tubes and orifices,Transactions of the American Society of Mechanical Engineers ,1956(78).
[5] Carstens M R and Roller J E:Boundary-shear stress in unsteady turbulent pipe flow,Journal of the Hydraulics Division,American Society of Civil Engineers,1959(85).
[6] Brunone B, Golia U M and Greco M:Modeling of fast transients by numerical method,9th Round Table IAHR Group,Valencia,1991.
[7] Brunone B,Ferrante M and Calabresi F:High Reynolds number transients in a pump rising main,Field tests and numerical modeling,4th International Conference on Water Pipeline Systems,York,UK,BHR Group,2001.
[8] Zielke W:Frequency-dependent friction in transient pipe flow,Journal of Basic Engineering,American Society of Mechanical Engineers,1968(90).
[9] Vardy A E and Brown J M B:Transient Turbulent friction in Smooth Pipe Flows,Journal of Sound and Vibration ,2003,259(5).
[10] Ghidaoui M S and Mansour S:Efficient treatment of the Vardy-Brown unsteady shear in pipe transients,Journal of Hydraulic Engineering, American Society of Civil Engineers,2002(128).
[11] Vardy A E and Brown J M B: Transient turbulent, smooth pipe friction,Journal of Hydraulic Research 1995(33).
[12] 蒋明:液体管道非稳定流动摩阻计算,油气储运,2000,19(4).
[13] Axworthy D H,Ghidaoui M and McInnes D A:Extended thermodynamics derivation of energy dissipation in unsteady pipe flow,Journal of Hydraulic Engineering,American Society of Civil Engineers, 2000(126).
[14] Eichinger P and Lein G:The influence of friction on unsteady pipe flow,International Conference on Unsteady Flow and Fluid Transients,Durham UK,HR Wallingford,1992.
[15] Silva-Araya W F and Chaudhry M H:Computation of energy dissipation in transient flow,Journal of Hydraulic Engineering,American Society of Civil Engineers,1997(123).
[16] Silva-Araya W F and Chaudhry M H:Unsteady Friction in Rough Pipe,Journal of Hydraulic Engineering,American Society of Civil Engineers, 2001(127).
[17] Pezzinga G:Quasi-2D model for unsteady flow in pipe networks,Journal of Hydraulic Engineering, American Society of Civil Engineers, 1999(125).
[18] Brunone B,Golia U and Greco M:Effects of two-dimensionality on pipe transients modeling,Journal of Hydraulic Engineering,American Society of Civil Engineers,1995(121).
[19] Ming Zhao,Ghidaoui M S:Efficient Quasi-Two-Dimensional Model for Water Hammer Problems,Journal of Hydraulic Engineering,American Society of Civil Engineers,2002(129).
[20] Bergant A,Simpson A R and Vitkovsky J:Developments in unsteady pipe flow friction modeling,Journal of Hydraulic Research,2001(39).

相似文献/References:

[1]曾忠刚 温秀荷 索杏兰 孔军 姜敏 陈凯 赵庆兵 曾朗峻.塔河凝析油管道结蜡计算[J].油气储运,2012,31(8):622.[doi:10.6047/j.issn.1000-8241.2012.08.018]
 Zeng Zhongang,Wen Xiuhe,Suo Xinglan,et al.Wax deposition calculation for Tahe Condensate Pipeline[J].Oil & Gas Storage and Transportation,2012,31(11):622.[doi:10.6047/j.issn.1000-8241.2012.08.018]
[2]夏文鹤 茹黎南 李明 曹谢东.基于卫星物联网技术的油气管道远程监控[J].油气储运,2012,31(12):898.[doi:10.6047/j.issn.1000-8241.2012.12.006]
 Xia Wenhe,Ru Linan,Li Ming,et al. Remote monitoring on oil and gas pipelines with satellite Internet of Things network[J].Oil & Gas Storage and Transportation,2012,31(11):898.[doi:10.6047/j.issn.1000-8241.2012.12.006]
[3]董绍华 韩忠晨 杨毅 曹兴.物联网技术在管道完整性管理中的应用[J].油气储运,2012,31(12):906.[doi:10.6047/j.issn.1000-8241.2012.12.008]
 Dong Shaohua,Han Zhongchen,Yang Yi,et al.The application of Internet of Things technology in the integrity management of pipeline[J].Oil & Gas Storage and Transportation,2012,31(11):906.[doi:10.6047/j.issn.1000-8241.2012.12.008]
[4]李睿,侯宇,刘淑聪,等.锚纹特征对管道外防腐环氧涂层附着力的影响[J].油气储运,2011,30(05):355.[doi:10.6047/j.issn.1000-8241.2011.05.010]
 Li Rui,Hou Yu,Li Jingmiao,et al.Impact of pattern on the adhesion of pipe external epoxy coating[J].Oil & Gas Storage and Transportation,2011,30(11):355.[doi:10.6047/j.issn.1000-8241.2011.05.010]
[5]段纪淼,宫敬,张宇,等.多相混输管道蜡沉积研究进展[J].油气储运,2011,30(04):241.[doi:10.6047/j.issn.1000-8241.2011.04.001]
 Duan Jimiao,Gong Jing,Zhang Yu,et al.Research progress of wax deposition in multiphase mixed transmission pipeline[J].Oil & Gas Storage and Transportation,2011,30(11):241.[doi:10.6047/j.issn.1000-8241.2011.04.001]
[6]宋晓琴,刘广文,王雯娟.管道油品泄漏原因及其对环境的影响[J].油气储运,2011,30(04):297.[doi:10.6047/j.issn.1000-8241.2011.04.016]
 Song Xiaoqin,Liu Guangwen,Wang Wenjuan. The influence of oil pipeline leakage on environmental pollution [J].Oil & Gas Storage and Transportation,2011,30(11):297.[doi:10.6047/j.issn.1000-8241.2011.04.016]
[7]蔡亮学,何利民,吕宇玲,等.水平定向钻管道穿越孔底泥浆的力学特性[J].油气储运,2011,30(01):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
 Cai Liangxue,He Limin,Lv Yuling,et al.Hole-bottom slurry mechanical properties of horizontal directional drilling in pipeline crossing project[J].Oil & Gas Storage and Transportation,2011,30(11):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
[8]樊三新,刘玉玲,楚威威.高寒地区管道低温水试压方法[J].油气储运,2011,30(01):73.[doi:10.6047/j.issn.1000-8241.2011.01.020]
 Fan Sanxin,Liu Yuling,Chu Weiwei.Pipeline hydrotest method of cold water in frigid zone[J].Oil & Gas Storage and Transportation,2011,30(11):73.[doi:10.6047/j.issn.1000-8241.2011.01.020]
[9]杜明俊,张振庭,张朝阳,等.多相混输管道90°弯管冲蚀破坏应力分析[J].油气储运,2011,30(06):427.[doi:10.6047/j.issn.1000-8241.2011.06.006]
 Du Mingjun,Chao Ling,Fu Xiaodong,et al.Analysis of erosion fracture stress of 90° elbow in multi-phase mixed transmission pipeline[J].Oil & Gas Storage and Transportation,2011,30(11):427.[doi:10.6047/j.issn.1000-8241.2011.06.006]
[10]高河东,祁志江,任金岭,等.川气东送管道野三河跨越方案比选与实施[J].油气储运,2011,30(06):445.[doi:10.6047/j.issn.1000-8241.2011.06.011]
 Gao Hedong,Qi Zhijiang,Ren Jinling,et al.Programs comparison and construction of the Yesanhe River Overhead Crossing NG Project of Sichuan-to-East Gas Pipeline[J].Oil & Gas Storage and Transportation,2011,30(11):445.[doi:10.6047/j.issn.1000-8241.2011.06.011]
[11]蒋明.液体管道非稳定流动摩阻计算[J].油气储运,2000,19(4):19.[doi:10.6047/j.issn.1000-8241.2000.04.005]
 Jiang Ming.Calculation of Unsteady Flow Friction in Liquid Pipeline[J].Oil & Gas Storage and Transportation,2000,19(11):19.[doi:10.6047/j.issn.1000-8241.2000.04.005]
[12]霍国胜,夏德宏.管内流体产生滑移时的减阻率计算[J].油气储运,1999,18(10):25.[doi:10.6047/j.issn.1000-8241.1999.10.007]
 Huo Guosheng,Xia Dehong.The Calculation of Drag Reduction Rate and the Factors which Affect the Rate when Slip Exists in Pipe Flow[J].Oil & Gas Storage and Transportation,1999,18(11):25.[doi:10.6047/j.issn.1000-8241.1999.10.007]
[13]陈振瑜.气液混输管道数据库[J].油气储运,1997,16(2):26.[doi:10.6047/j.issn.1000-8241.1997.02.009]
 Chen Zhenyu.Database Applied on Gas-Liquid Mixed Flow Pipeline[J].Oil & Gas Storage and Transportation,1997,16(11):26.[doi:10.6047/j.issn.1000-8241.1997.02.009]

备注/Memo

收稿日期:2004-4-8。
作者简介:岑康 1975年生,1998年毕业于西南石油学院设备工程与管理专业,现在西南石油学院攻读油气储运硕士学位.610500,成都市新都区西南石油学院研究生院研2002级2班;电话:(028)83030415.

更新日期/Last Update: 1900-01-01