[1]詹胜文.捞刀河穿跨越方案的比选[J].油气储运,2003,22(7):27-30.[doi:DOI:10.6047/j.issn.1000-8241.2003.07.008]
 ZHAN Shengwen.The Determination of Pipeline Crossing Scheme in Laodaohe River of ZHongxian-Wuhan Gas Transmission Pipeline[J].Oil & Gas Storage and Transportation,2003,22(7):27-30.[doi:DOI:10.6047/j.issn.1000-8241.2003.07.008]
点击复制

捞刀河穿跨越方案的比选

相似文献/References:

[1]赵慧,倪洪亮,王博,等.热泵在原油长输管道的应用前景[J].油气储运,2011,30(04):293.[doi:10.6047/j.issn.1000-8241.2011.04.015]
 Zhao Hui,Ni Hongliang,Wang Bo,et al.Application prospect of heat pump in long-distance crude oil pipeline[J].Oil & Gas Storage and Transportation,2011,30(7):293.[doi:10.6047/j.issn.1000-8241.2011.04.015]
[2]蔡亮学,何利民,吕宇玲,等.水平定向钻管道穿越孔底泥浆的力学特性[J].油气储运,2011,30(01):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
 Cai Liangxue,He Limin,Lv Yuling,et al.Hole-bottom slurry mechanical properties of horizontal directional drilling in pipeline crossing project[J].Oil & Gas Storage and Transportation,2011,30(7):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
[3]张伟,许康,齐世明,等.加热炉改烧煤焦油存在的问题[J].油气储运,2011,30(03):220.[doi:10.6047/j.issn.1000-8241.2011.03.016]
 Zhang Wei,Xu Kang,Qi Shiming,et al.Problems of adopting coal tar in heater[J].Oil & Gas Storage and Transportation,2011,30(7):220.[doi:10.6047/j.issn.1000-8241.2011.03.016]
[4]王永红,李晓平,宫敬.长输管道在线仿真系统的应用与展望[J].油气储运,2011,30(02):90.[doi:10.6047/j.issn.1000-8241.2011.02.003]
 Wang Yonghong,Li Xiaoping,Gong Jing.The application and futurity of long-distance pipeline on-line simulation system[J].Oil & Gas Storage and Transportation,2011,30(7):90.[doi:10.6047/j.issn.1000-8241.2011.02.003]
[5]郭晓瑛,路艳斌,郑娟.国内外长输管道 SCADA 系统标准现状[J].油气储运,2011,30(02):156.[doi:10.6047/j.issn.1000-8241.2011.02.021]
 Guo Xiaoying,Lu Yanbin,Zheng Juan.Technical status of long-distance pipeline SCADA system standards worldwide[J].Oil & Gas Storage and Transportation,2011,30(7):156.[doi:10.6047/j.issn.1000-8241.2011.02.021]
[6]王志伦,董红军,杨威,等.管道穿越江底隧道安全风险识别与施工管理[J].油气储运,2011,30(08):670.[doi:10.6047/j.issn.1000-8241.2011.08.019]
 Wang Zhilun,Dong Hongjun,Yang Wei,et al.Safety risk identification and construction management of pipeline crossing in river tunnel[J].Oil & Gas Storage and Transportation,2011,30(7):670.[doi:10.6047/j.issn.1000-8241.2011.08.019]
[7]赵君,杨克瑞,蔡培培,等.钢质套管穿越段管道的完整性检测与评价[J].油气储运,2011,30(09):681.[doi:10.6047/j.issn.1000-8241.2011.09.010]
 Zhao Jun,Yang Kerui,Cai Peipei,et al.Integrity inspection and evaluation on the pipe with steel casing in the crossing section[J].Oil & Gas Storage and Transportation,2011,30(7):681.[doi:10.6047/j.issn.1000-8241.2011.09.010]
[8]杨莉,王从乐,姚玉萍,等.风城超稠油掺柴油长距离输送方法[J].油气储运,2011,30(10):768.[doi:10.6047/j.issn.1000-8241.2011.10.016]
 Yang Li,Wang Congle,Yao Yuping,et al.Long-distance transportation method for Fengcheng Ultra-heavy Oils blended with diesel[J].Oil & Gas Storage and Transportation,2011,30(7):768.[doi:10.6047/j.issn.1000-8241.2011.10.016]
[9]李国辉,马晓成.管道水平定向钻穿越夯套管结构计算[J].油气储运,2011,30(11):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
 Li Guohui and Ma Xiaocheng.Structural computation of pounding casing in crossing project with horizontal directional drilling method[J].Oil & Gas Storage and Transportation,2011,30(7):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
[10]陈荣,陈晓勤.苏丹3/7区原油管道加剂运行安全经济评价[J].油气储运,2011,30(12):899.[doi:10.6047/j.issn.1000-8241.2011.12.006]
 Chen Rong and Chen Xiaoqin.Safety and economy evaluation of PPD-added oil pipeline in the 3/7 Block of Sudan[J].Oil & Gas Storage and Transportation,2011,30(7):899.[doi:10.6047/j.issn.1000-8241.2011.12.006]

备注/Memo

收稿日期:2002-10-8。
作者简介:詹胜文,065000,河北省廊坊市金光道22号;电话:(0316)2077249.助理工程师,1974年生,1998年毕业于国防科技大学工程兵学院结构专业,现在中国石油天然气管道工程有限公司线路室从事管道穿跨越设计工作.

更新日期/Last Update: 1900-01-01