[1]杨善,曾聪,闫雪峰,等.大直径水平定向钻低流速层流下岩屑运移规律[J].油气储运,2018,37(9):1041-1047.[doi:10.6047/j.issn.1000-8241.2018.09.014]
 YANG Shan,ZENG Cong,YAN Xuefeng,et al.The migration law of cuttings in the case of low-velocity laminar flow during large-diameter horizontal directional drilling[J].Oil & Gas Storage and Transportation,2018,37(9):1041-1047.[doi:10.6047/j.issn.1000-8241.2018.09.014]
点击复制

大直径水平定向钻低流速层流下岩屑运移规律

参考文献/References:

[1] 马保松. 非开挖工程学[M]. 北京:人民交通出版社,2008:483-484.
MA B S. The science of trenchless engineering[M]. Beijing:China Communications Press,2008:483-484.
[2] 徐良奎,苗冀清,寇辰旭. 长距离岩石水平定向钻进中的难点分析[J]. 非开挖技术,2012(2):54-59.
XU L K,MIAO J Q,KOU C X. Analysis on the difficulty oflong distance rock horizontal directional drilling[J]. TrenchlessTechnology,2012(2):54-59.
[3] 张宝强,江勇,曹永利,等. 水平定向钻管道穿越技术的最新发展[J]. 油气储运,2017,36(5):558-562.
ZHANG B Q,JIANG Y,CAO Y L,et al. The latest developmentof HDD pipeline crossing technologies[J]. Oil & Gas Storage andTransportation,2017,36(5):558-562.
[4] 左雷彬,冯亮,马晓成,等. 水平定向钻穿越冰水沉积层技术探索与实践[J]. 地质科技情报,2016,35(2):121-125.
ZUO L B,FENG L,MA X C,et al. Horizontal directionaldrilling of glaciofluvial deposit strata by crossing technology[J].Geological Science and Technology Information,2016,35(2):121-125.
[5] ALLOUCHE E N,ARIARATNAM S T,LUEKE J S.
Horizontal directional drilling:profile of an emergingindustry[J]. Journal of Construction Engineering andManagement,2000,126(1):68-76.
[6] SHU B,ZHANG S. Cuttings transport in Maxi HDDboreholes with front reaming and one way drilling mudreturn technologies[J]. Tunnelling and Underground SpaceTechnology,2018,72:1-8.
[7] CHENG E,POLAK M A. Theoretical model for calculatingpulling loads for pipes in horizontal directional drilling[J].Tunnelling and Underground Space Technology,2007,22(5):633-643.
[8] YAN X,MA B,ZENG C,et al. Analysis of formation fracturingfor the Maxi-HDD Qin River crossing project in China[J].Tunnelling and Underground Space Technology,2016,53:1-12.
[9] OZBAYOGLU M E,SORGUN M,SAASEN A,et al. Holecleaning performance of light-weight drilling fluids duringhorizontal underbalanced drilling[J]. Journal of CanadianPetroleum Technology,2010,49(4):21-26.
[10] 汪海阁,刘希圣. 泥浆性能影响环空岩屑运移的实验研究[J].钻井液与完井液,1994,11(2):24-30.
WANG H G,LIU X S. Experimental study on the effect ofslurry performance on the movement of annular cuttings[J].Drilling Fluid and Completion Fluid,1994,11(2):24-30.
[11] 魏治明,王兆会,刘来喜,等. 水平井岩屑床清除的室内模拟试验[J]. 钻井液与完井液,1995,12(4):6-10.
WEI Z M,WANG Z H,LIU L X,et al. Indoor simulation testof removal of cuttings bed in horizontal wells[J]. Drilling Fluidand Completion Fluid,1995,12(4):6-10.
[12] 相恒富,孙宝江,李昊,等. 大位移水平井段岩屑运移实验研究[J]. 石油钻采工艺,2014,36(3):1-6.
XIANG H F,SUN B J,LI H,et al. Experimental studyon cuttings migration in horizontal well with largedisplacement[J]. Oil Drilling and Production Technology,2014,36(3):1-6.
[13] PEDEN J M,FORD J T. Comprehensive experimentalinvestigation of drilled cuttings transport in including the effectsof rotation and eccentricity[C]. Hague Netherlands:Society ofPetroleum Engineers Meeting,1990:393-404.
[14] 汪志明. 流体力学[M]. 北京:石油工业出版社,2006:272-273.
WANG Z M. Fluid mechanics[M]. Beijing:Petroleum IndustryPress,2006:272-273.
[15] ZHAI Y J,WANG Z M,ZHANG T Y. Experimental study ofcuttings transport in horizontal annulus of aerated underbalancedrilling[J]. Science Technology & Engineering,2016,16(19):63-71.[16] 王金堂,孙宝江,李昊,等. 大位移水平井钻井岩屑速度分布模拟分析[J]. 水动力学研究与进展,2014,29(6):739-748.
WANG J T,SUN B J,LI H,et al. Simulation analysis ofdrilling cuttings velocity distribution in extended horizontalwell drilling[J]. Chinese Journal of Hydrodynamics,2014,29(6):739-748.
[17] ARIARATNAM S T,BELJAN I J. Postconstructionevaluation of horizontal directional drilling installations[J].Practice Periodical on Structural Design & Construction,2005,10(2):115-126.
[18] SARIREH M,TARAWNEH S. Modeling of productivityfor horizontal directional drilling (HDD) operationand applications[J]. European Journal of Business andManagement,2014,6(2):1-22.
[19] 铁明亮,马晓成,郭君,等. 如东长江超长距离定向钻穿越设计[J]. 地质科技情报,2016,35(2):100-104.
TIE M L,MA X C,GUO J,et al. Rudong Yangtze Riverextralong directional drilling design[J]. Geological Science andTechnology Information,2016,35(2):100-104.[20] 张力佳,黄丽,郭君,等. 岩层定向钻穿越泥浆携带能力的提高[J]. 油气储运,2016,35(5):567-570.
ZHANG L J,HUANG L,GUO J,et al. Improvement of thecarrying capacity of the rock strata in directional drillingthrough the mud[J]. Oil & Gas Storage and Transportation,2016,35(5):567-570.

相似文献/References:

[1]蔡亮学,何利民,吕宇玲,等.水平定向钻管道穿越孔底泥浆的力学特性[J].油气储运,2011,30(01):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
 Cai Liangxue,He Limin,Lv Yuling,et al.Hole-bottom slurry mechanical properties of horizontal directional drilling in pipeline crossing project[J].Oil & Gas Storage and Transportation,2011,30(9):25.[doi:10.6047/j.issn.1000-8241.2011.01.007]
[2]张杰,周朝霞,叶文建,等.回拖浮力平衡技术在水平定向钻工程中的应用[J].油气储运,2011,30(08):619.[doi:10.6047/j.issn.1000-8241.2011.08.005]
 Zhang Jie,Zhou Zhaoxia,Ye Wenjian,et al.Application of backtow flotage balance technology in horizontal directional drilling engineering[J].Oil & Gas Storage and Transportation,2011,30(9):619.[doi:10.6047/j.issn.1000-8241.2011.08.005]
[3]李国辉,马晓成.管道水平定向钻穿越夯套管结构计算[J].油气储运,2011,30(11):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
 Li Guohui and Ma Xiaocheng.Structural computation of pounding casing in crossing project with horizontal directional drilling method[J].Oil & Gas Storage and Transportation,2011,30(9):824.[doi:10.6047/j.issn.1000-8241.2011.11.007]
[4]邓彦.岙山—镇海原油管道册子水道定向钻穿越技术[J].油气储运,2008,27(1):55.[doi:DOI:10.6047/j.issn.1000-8241.2008.01.016]
 DENG Yan.Cezi Waterway Horizontal Directional Drilling Practice for Aoshan-Zhenhai Import Oil Pipeline Construction Project[J].Oil & Gas Storage and Transportation,2008,27(9):55.[doi:DOI:10.6047/j.issn.1000-8241.2008.01.016]
[5]汪春付,常兴,杨艳军,等.齐青管道定向钻穿越铁路的方案设计与施工[J].油气储运,2004,23(3):46.[doi:10.6047/j.issn.1000-8241.2004.03.015]
 WANG Chunfu,CHANG Xing.Scenario Design and Construction for Railway Crossing with Horizontal Directional Drilling Technique in Qilu Sinopec-Qingdao Gas Pipeline[J].Oil & Gas Storage and Transportation,2004,23(9):46.[doi:10.6047/j.issn.1000-8241.2004.03.015]
[6]蔡亮学 何利民 吕宇玲 王丙奎 于德军.水平定向钻回拖载荷预测模型[J].油气储运,2012,31(2):147.[doi:10.6047/j.issn.1000-8241.2012.02.018]
 Cai Liaoxue,He Limin,Lv Yuling,et al.Prediction model of backtow loads in horizontal directional drilling installation[J].Oil & Gas Storage and Transportation,2012,31(9):147.[doi:10.6047/j.issn.1000-8241.2012.02.018]
[7]朱波,吕建峰,张永高.管道水平定向钻穿越技术的特征分析[J].油气储运,2005,24(3):51.[doi:10.6047/j.issn.1000-8241.2005.03.016]
 ZHU Bo,LV Jianfeng.Characteristic Analysis on Huaihe River Pipeline Crossing by Horizontal Directional Drilling Technology[J].Oil & Gas Storage and Transportation,2005,24(9):51.[doi:10.6047/j.issn.1000-8241.2005.03.016]
[8]郑承虎.水平定向钻穿越尼罗河可行性分析[J].油气储运,1999,18(5):50.[doi:DOI:10.6047/j.issn.1000-8241.1999.05.017]
 Zheng Chenghu.Feasibility Analysis of Horizontal Direction Drill Passing through Nile[J].Oil & Gas Storage and Transportation,1999,18(9):50.[doi:DOI:10.6047/j.issn.1000-8241.1999.05.017]
[9]张宝强 焦如义 袁会赞 张倩 刘艳利.大口径长输油气管道非开挖穿越的适应性[J].油气储运,2012,31(11):871.[doi:10.6047/j.issn.1000-8241.2012.11.019]
 Zhang Baoqiang,Jiao Ruyi,Yuan Huizan,et al.Adaptability of trenchless crossing for large-diameter long-distance oil and gas pipeline[J].Oil & Gas Storage and Transportation,2012,31(9):871.[doi:10.6047/j.issn.1000-8241.2012.11.019]
[10]冯少广 李荣光 王文荣 任文静 张鑫 李睿 赵云峰 赵国星.定向钻穿越3PE 防腐层碳纤维复合材料防护技术[J].油气储运,2013,32(1):47.[doi:10.6047/j.issn.1000-8241.2013.01.011]
 Feng Shaoguang,Li Rongguang,Wang Wenrong,et al.3PE carbon fiber composite material protection technology in directional drilling project[J].Oil & Gas Storage and Transportation,2013,32(9):47.[doi:10.6047/j.issn.1000-8241.2013.01.011]

备注/Memo

基金项目:国家自然科学基金青年基金项目“大直径HDD 孔内流场动力学特征及其对岩屑运移的影响研究”,51204152。
作者简介:杨善,男,1993 年生,在读硕士生,2015 年毕业于中国地质大学(武汉)地质工程专业,现主要从事油气管道水平定向钻敷设技术的研究工作。地址:湖北省武汉市洪山区鲁磨路388 号中国地质大学(武汉)工程学院2015 级硕士三班,430074。电话:13163373010,Email:yangshan@cug.edu.cn
通讯作者:马保松,男,1968 年生,教授,博士生导师,1998 年博士毕业于吉林大学地质工程专业,现主要从事非开挖技术的研究工作。地址:湖北省武汉市洪山区鲁磨路388 号,430074。电话:18971457969,Email:mabaosong@163.com

更新日期/Last Update: 2018-09-15