[1]张勤,詹胜文.中贵管道乌江悬索跨越主缆的施工控制[J].油气储运,2016,35(6):657-661,666.[doi:10.6047/j.issn.1000-8241.2016.06.017]
 ZHANG Qin,ZHAN Shengwen.Control on construction of the main cable for Wujiang suspension crossing of Zhongwei-Guiyang Pipeline[J].Oil & Gas Storage and Transportation,2016,35(6):657-661,666.[doi:10.6047/j.issn.1000-8241.2016.06.017]
点击复制

中贵管道乌江悬索跨越主缆的施工控制

参考文献/References:

[1] 詹胜文,冯义军,伍兴中,等. 中缅油气管道跨越双管同桥的可行性分析[J].油气储运,2012,31(11):827-829. ZHAN S W, FENG Y J, WU X Z, et al. Feasibility analysis on the overhead crossing in one pipe-bridge for Sino-Myanmar Oil/Gas Pipelines[J].Oil & Gas Storage and Transportation,2012, 31(11):827-829.
[2] 史航,曾志华,左雷斌. 中缅油气管道澜沧江桥隧工程穿跨越总体设计[J].油气储运,2014,33(10):1034-1038. SHI H, ZENG Z H, ZUO L B. Overall design of Lantsang bridge and tunnel crossing project for the Myanmar-China Oil and Gas Pipeline[J].Oil & Gas Storage and Transportation,2014,33(10):1034-1038.
[3] 沈锐利. 悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9. SHEN R L. Calculation methods for design and erection of cable curve of suspension bridge[J].Journal of Civil Engineering, 1996,29(2):3-9.
[4] 唐茂林,沈锐利,强士中. 大跨度悬索桥丝股架设线形计算的精确方法[J].西南交通大学学报,2001,36(3):303-307. TANG M L, SHEN R L, QIANG S Z. An accurate calculation method for erecting curves of wire strands of long suspension bridges[J].Journal of Southwest Jiaotong University,2001,36(3):303-307.
[5] 唐茂林,强士中,沈锐利. 悬索桥成桥主缆计算的悬链线方法[J].铁道学报,2003,25(1):87-91. TANG M L, QIANG S Z, SHEN R L. Segmental catenary method of calculating the cable curve of suspension bridge[J].Journal of the China Railway Society,2003,25(1):87-91.
[6] 肖勇刚,吴坤平. 悬索桥成桥主缆线形计算研究[J].长沙理工大学学报(自然科学版),2007,4(4):33-38. XIAO Y G, WU K P. Determination of main cable shape under dead load state of suspension bridge[J].Journal of Changsha University of Science and Technology (Natural Science),2007, 4(4):33-38.
[7] 唐茂林,王昌将,沈锐利. 西堠门大桥基准索股架设监控与分析[J].重庆交通大学学报(自然科学版),2008,27(4):532-536. TANG M L, WANG C J, SHEN R L. Monitoring and analysis of datum strand of the houmen suspension bridge[J].Journal of (下转第666页) Chongqing Jiaotong University (Natural Science),2008,27(4):532-536.
[8] 薛光雄,沈锐利,先正权,等. 悬索桥基准丝股线形的确定与测控[J].桥梁建设,2004(4):4-6. XUE G X, SHEN R L, XIAN Z Q, et al. Determination, measurement and control of datum wire strand geometry of suspension bridge[J].Bridge Construction,2004(4):4-6.
[9] 李海,先正权,沈良成,等. 润扬大桥悬索桥主缆索股垂度调整方法[J].桥梁建设,2004(4):36-39. LI H, XIAN Z Q, SHEN L C, et al. Method of adjusting cable strand sagging for suspension bridge of Runyang Bridge[J].Bridge Construction,2004(4):36-39.
[10] 陈常松,陈政清,颜东煌. 悬索桥主缆初始位形的悬链线方程精细迭代分析法[J].工程力学,2006,23(8):62-68. CHEN C S, CHEN Z Q, YAN D H. Accurate iteration method to calculate the initialstates of main cables of suspension bridges[J].Engineering Mechanics, 2006, 23(8):62-68.
[11] 张志国,张晓民,邹振祝. 悬索无应力索长精确解[J].东北公路,2003,26(4):86-87. ZHANG Z G, ZHANG X M, ZOU Z Z. Exact solution of the unstressed cable length for suspension cable[J].Northeast Highway,2003,26(4):86-87.
[12] 钱冬生. 大跨悬索桥的设计与施工[M].成都:西南交通大学出版社,1997:45-47. QIAN D S. Design and construction of long-span suspension bridges[M].Chengdu:Southwest Jiaotong University Press, 1997:45-47.
[13] 中交第一公路工程局有限公司. 公路桥涵施工技术规范:JTG/T F50-2011[S].北京:人民交通出版社,2011:167-180. CCCC First Highway Engineering Co. Ltd..Technical specifications for construction of highway bridges and culverts:JTG/T F50-2011[S].Beijing:China Communications Press, 2011:167-180.

相似文献/References:

[1]铁明亮 张勤.管道悬索桥空缆下的索夹放样[J].油气储运,2016,35(预出版):1.
 TIE Mingliang,ZHANG Qin.Clamp laying-out for free cables of pipeline suspension bridge[J].Oil & Gas Storage and Transportation,2016,35(6):1.
[2]铁明亮,张勤.管道悬索桥空缆下的索夹放样[J].油气储运,2015,34(12):1339.[doi:10.6047/j.issn.1000-8241.2015.12.018]
 TIE Mingliang,ZHANG Qin.Clamp laying-out for free cables of pipeline suspension bridge[J].Oil & Gas Storage and Transportation,2015,34(6):1339.[doi:10.6047/j.issn.1000-8241.2015.12.018]

备注/Memo

收稿日期:2015-01-04;改回日期:2016-05-19。
作者简介:张勤,男,助理工程师,1988年生,2014年硕士毕业于西南交通大学桥梁与隧道工程专业,现主要从事公路与城市桥梁设计研究工作。地址:湖北省武汉市解放公园路41号,430010。电话:15680552265,Email:731382095@qq.com

更新日期/Last Update: 1900-01-01