[1]沙胜义,燕冰川,贾光明,等.X65钢制输油管道凹坑全尺寸回弹试验[J].油气储运,2016,35(5):475-477,502.[doi:10.6047/j.issn.1000-8241.2016.05.004]
 SHA Shengyi,YAN Bingchuan,JIA Guangming,et al.Full-scale dent rebound test of X65 steel oil pipeline[J].Oil & Gas Storage and Transportation,2016,35(5):475-477,502.[doi:10.6047/j.issn.1000-8241.2016.05.004]
点击复制

X65钢制输油管道凹坑全尺寸回弹试验

参考文献/References:

[1] 李明菲. 在役长输油气管道管体凹陷检测评价研究进展[C]. 廊 坊:中国CIPC 国际管道会议,2013:194-196. LI M F. Progress in the inspection and assessment of dents in oil and gas pipeline[C]. Langfang:China International Oil & Gas Pipeline Conference,2013:194-196.
[2] 焦中良,帅健. 含凹陷管道的完整性评价[J]. 西南石油大学学 报,2011,33(4):157-164. JIAO Z L,SHUAI J. Integrity assessment of pipeline with dent[J]. Journal of Southwest Petroleum University,2011,33(4): 157-164.
[3] KYU J Y,YONG K L,KYU H O. Integrity assessment of API 5L X65 and X70 pipelines with mechanical damages[C]. Calgary: 9th International Pipeline Conference,2012:7-9.
[4] HANS O H,JOE B,DAVID K,et al. Fitness for service of dents associated with metal loss due to corrosion[C]. Calgary:10th International Pipeline Conference,2014:4-6.
[5] ARUMUGAM U,GAO M. Root cause analysis of dent with crack[C]. Calgary:9th International Pipeline Conference,2012: 1-2.
[6] WANG R Y,KANIA R A. Combined approach t o characterization of dent with metal loss[C]. Calgary:9th International Pipeline Conference,2012:2-4.
[7] HUSAIN M A,ABUL A F M. Integrity assessment of interaction of dents with residual stresses of welds using probabilistic design analysis[C]. Calgary:9th International Pipeline Conference,2012:1-2.
[8] 陈健,雷铮强,王富祥,等. 基于有限元方法的含凹陷油气管道 应变分析[C]. 贵阳:中国计算力学大会,2014:2-3. CHEN J,LEI Z Q,WANG F X,et al. Finite-element based strain analysis of oil and gas pipeline containing dents[C]. Guiyang: China Computational Mechanics Conference, 2014:2-3.
[9] SANJAY T,VLADO S,AARON D,et al. Full scale cyclic fatigue testing of dented pipelines and development of a validated dented pipe finite element model[C]. Calgary:9th International Pipeline Conference,2012:4-5.
[10] HANIF W,KENNY S. Mechanical damage and fatigue assessment of dented pipelines using FEA[C]. Calgary:10th International Pipeline Conference,2014:3-6.

相似文献/References:

[1]沙胜义 燕冰川 贾光明 赵连玉 田胜杰 刘彧秋 于智博.X65 钢制输油管道凹坑全尺寸回弹试验[J].油气储运,2016,35(预出版):1.
 SHA Shengyi,YAN Bingchuan,JIA Guangming,et al.Full-scale dent rebound test of X65 steel oil pipeline[J].Oil & Gas Storage and Transportation,2016,35(5):1.

备注/Memo

收稿日期:2015-4-2;改回日期:2015-9-17。
作者简介:沙胜义,男,工程师,1986年生,2012年硕士毕业于哈尔滨工程大学船舶与海洋结构物设计制造专业,现主要从事管道完整性评估工作。地址:河北省廊坊市广阳区新开路408号,065000。电话:0316-2170873,Email:shashengyi@petrochina.com.cn

更新日期/Last Update: 1900-01-01