[1]铁明亮,张勤.管道悬索桥空缆下的索夹放样[J].油气储运,2015,34(12):1339-1344.[doi:10.6047/j.issn.1000-8241.2015.12.018]
 TIE Mingliang,ZHANG Qin.Clamp laying-out for free cables of pipeline suspension bridge[J].Oil & Gas Storage and Transportation,2015,34(12):1339-1344.[doi:10.6047/j.issn.1000-8241.2015.12.018]
点击复制

管道悬索桥空缆下的索夹放样

参考文献/References:

[1] 钱冬生,陈仁福. 大跨度悬索桥的设计与施工[M]. 成都:西南交通大学出版社,1992:21-24.
QIAN D S, CHEN R F. Design and construction of long span suspension bridge[M]. Chengdu: Southwest Jiaotong University Press, 1992:21-24.
[2] 潘永仁. 悬索桥结构非线性分析理论与方法[M]. 北京:人民交通出版社,2004:18-20.
PAN Y R. Nonlinear analysis theory and method for suspension bridge structure[M]. Beijing: China Communications Press, 2004:18-20.
[3] 占维. 悬索桥主缆施工计算的解析迭代方法[D]. 武汉:武汉理工大学,2007:15.
ZHAN W. Research on construction calculation of suspension bridge with analysis and literation method[D]. Wuhan: Wuhan University of Technology, 2007:15.
[4] 唐茂林,强士中,沈锐利. 悬索桥成桥主缆计算的悬链线方法[J]. 铁道学报,2003,25(1):87-91.
TANG M L, QIANG S Z, SHEN R L. Catenary method for cable calculation of suspension bridge[J]. Journal of China Railway Society, 2003, 25(1):87-91.
[5] 沈锐利. 悬索桥主缆系统设计及架设计算方法研究[J]. 土木工程学报,1996,29(2):3-9.
SHEN R L. Research of cable system design of suspension bridge and pavement calculation method[J]. China Civil Engineering Journal, 1996,29(2):3-9.
[6] 张志国,张晓民,邹振祝. 悬索无应力索长精确解[J]. 东北公路, 2003,26(4):86-87.
ZHANG Z G, ZHANG X M, ZOU Z Z. Exact solution of suspension stress-free cable length[J]. Northeastern Highway, 2003, 26(4):86-87.
[7] 姜军,孙胜江. 悬索桥索夹安装位置及吊索下料长度计算[J]. 公路,2007(8):25-28.
JIANG J, SUN S J. Installation position of cable clamp installation for suspension bridge and calculation of the cutting length for suspension line[J]. Highway, 2007(8):25-28.
[8] 王国锋,王宗仁. 悬索桥索夹的施工放样[J]. 黑龙江交通科技, 2008,30(7):16-19.
WANG G F, WANG Z R. Construction layout of cable clamp of suspension bridge[J]. Communications Science and Technology Heilongjiang, 2008, 30(7):16-19.
[9] 于坚定. 悬索桥主缆索夹位置计算及放样[J]. 桥梁建设, 1999(2):33-35.
YU J D. Computing and laying out the location of the main cable clamp for the suspension bridge[J]. Bridge Construction, 1999(2):33-35.
[10] 陈涵,宋花平,赵军. 装配式输油管道跨越结构计算分析[J]. 油气储运,2013,32(11):1243-1246.
CHEN H, SONG H P, ZHAO J. Calculation analysis of crossing structure of assembled oil transportation pipeline[J]. Oil & Gas Storage and Transportation, 2013,32(11):1243-1246.
[11] 崔浩,方芳,孙骥钊,等. 广坪河梁式直跨管道工程的空中发送施工[J]. 油气储运,2013,32(3):307-308.
CUI H, FANG F, SUN J Z, et al. Aerial installation of beam straight-span pipeline in Guangping River Oil Pipeline Project[J]. Oil & Gas Storage and Transportation, 2013, 32(3):307-308.
[12] 刘益,丁志威. 柔性悬索桥主缆空缆线形分析及索夹安装位置确定[J]. 公路与汽运,2012(2):166-168.
LIU Y, DING Z W. Main cable and free cable linear analysis of flexible suspension bridge and determination of cable clamp installation position [J]. Highways & Automotive Applications, 2012(2):166-168.
[13] 孙晶晶. 自锚式悬索桥空间索夹施工技术[J]. 铁道建筑技术, 2009(10):39-40.
SUN J J. Construction technology of spatial clamp of cable self-anchored suspension bridge[J]. Railway Construction Technology, 2009(10):39-40.
[14] 任洪田,赵立哲,白福军,等. 悬索桥主缆索夹抗滑试验及应力测试分析[J]. 北方交通,2009(3):74-76.
REN H T, ZHAO L Z, BAI F J, et al. Antiskid trial of main cable of suspension bridge and analysis of strees testing [J]. Northern Communications, 2009(3):74-76.

相似文献/References:

[1]铁明亮 张勤.管道悬索桥空缆下的索夹放样[J].油气储运,2016,35(预出版):1.
 TIE Mingliang,ZHANG Qin.Clamp laying-out for free cables of pipeline suspension bridge[J].Oil & Gas Storage and Transportation,2016,35(12):1.

备注/Memo

收稿日期:2014-07-19;改回日期:2015-09-09。
作者简介:铁明亮,工程师,1983年生,2010年硕士毕业于长安大学桥梁与隧道工程专业,现主要从事石油管道穿跨越技术的研究工作。Tel:15830468920,Email:26177995@qq.com

更新日期/Last Update: 1900-01-01