Design and review focuses of geologic disaster treatment along oil and gas pipeline

References

[1]中国石油天然气管道工程有限公司. 中缅油气管道工程地质灾害危险性评估报告, GOPZM2007-2[R].廊坊:中国石油天然气管道工程有限公司, 2007.

 China Petroleum Pipeline Engineering Corp. China-Myanmar oil and gas pipeline assessment report,GOPZM2007-2[R]. Langfang: China Petroleum Pipeline Engineering Corp., 2007.

[2]薛辉,杨学青. 中缅管道途经典型地质灾害影响区域的设计与建设[J].油气储运, 2013, 32 (12) : 1320-1324.

 XUE H,YANG X Q. Design and construction of Sino-Burma Oil-Gas Pipeline in typical geological hazard areas[J]. Oil and Gas Storage and Transportation, 2013, 32 (12) : 1320-1324.

[3]么惠全,冯伟,张照旭,等. “西气东输” 一线管道地质灾害风险监测预警体系[J].天然气工业, 2012, 32 (1) : 81-84.

 YAO H Q,FENG W,ZHANG Z X,et al. A monitoring and early warning system for geological hazards in the Line One of the West-East Gas Pipeline[J]. Natural Gas Industry, 2012, 32 (1) : 81-84.

[4]叶思源, 吴树仁.南水北调工程北京段PCCP管道施工沿线的地质灾害与防治[J].地质通报, 2010, 29 (2) : 463-468.

 YE S Y,WU S R. The geohazard and prevention along PCCP pipeline in Beijing area,China as a section of South-to-North water diversion project[J]. Geological Bulletin of China, 2010, 29 (2) : 463-468.

[5]中国石油天然气管道工程有限公司. 中缅油气管道 (国内段) 地质灾害防治研究报告, 2011GJTC-05-01[R]. 廊坊:中国石油天然气管道工程有限公司, 2013.

 China Petroleum Pipeline Engineering Corp. Report for geological hazards prevention in china-myanmar oil and gas pipeline (Domestic segment), 2011GJTC-05-01[R]. Langfang: China Petroleum Pipeline Engineering Corp., 2013.

[6]中国石油天然气管道工程有限公司. 复杂地质条件下地质灾害防治研究, 2011GJTC-01-02[R]. 廊坊:中国石油天然气管道工程有限公司, 2013.

 China Petroleum Pipeline Engineering Corp. Study on the prevention for geological hazards in complex geological conditions, 2011GJTC-01-02[R]. Langfang: China Petroleum Pipeline Engineering Corp., 2013.


 

Memo

-

Last Update: 1900-01-01